Transcript
Page 1: 8 - California Public Utilities Commission · 2007-12-06 · I8-7 I8-6 I8-5 I8-4 I8-3 I8-2 I8-1 I8-0 WD-3 WD-2 WD-1 WD-0 FTHL-2 FTHL-1 FTHL-0 6 5 4 3 2 1 0 §¨¦8 Februar y 2007

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

I8-7

I8-6

I8-5

I8-4

I8-3

I8-2

I8-1

I8-0

WD-3

WD-2

WD-1

WD-0

FTHL-2

FTHL-1

FTHL-0

6

5

4

3

2

1

0

§̈¦8

February 2007 Administrative Draft EIR/EIS

ROJECT ESCRIPTIONP DB.

N

ÆFigure Ap.AG E.1-1

0 3,000Feet

Agriculture:Interstate 8 Alternative

SAN

DIEG

O CO

UNTY

IMPE

RIAL

COU

NTY

FigureExtent

Sunrise Powerlink Project

Draft EIR/EISJanuary 2008

Environmental Planning Inc.

Interstate 8 Alternative, Overhead Portion

FTHL Eastern Alternative

West of Dunaway Alternative

Proposed Project 500 kV

") Mileposts

Major Road

Westside Main Canal

Sunrise Powerlink ProjectE.1 INTERSTATE 8 ALTERNATIVE

Proposed ProjectSycamore Canyon-Elliot ReconductorAlternative Routes

Permanent Impacts

Top Related