About HUST1
Main Theme of Pilot Scheme2
Existing Foundation3
CONTENTS
Pilot Scheme Objectives4
Pilot Scheme Content5
Schedule Arrangement6
Protective Measures7
Expected Results8
2
The Harbin University of Science and Technology (HUST) is the largest polytechnic university in Heilongjiang. HUST is also one of the top ten key universities in the province. The university places great emphasis on the specialty of engineering and a combination of engineering and science, with coordinated development of disciplines of economics, management, philosophy, literature, law and education. HUST delivers the finest teaching-research performance cultivating tens of thousands of talents every year.
2003
Excellent University in Undergraduate Teaching Evaluation by the Ministry of Education
2011
Typically Experienced University For National College Graduates’ Employment (awarded
among 50 national universities)
2011
Implementation of Excellent Engineers Training Scheme (2nd Batch)
1. About HUST
2012
Implementation of Informatization Pilot Scheme (1st Batch)
3
To Construct a
Service-Centric
Digital Campus
HUST has proposed the above main theme leveraging the current technology development features and the existing facilities in the campus. We strike to explore and construct a service-centric digital campus, which will promote the development of university.
4
2. Main Theme of Pilot Scheme
3. Existing Foundation
Implementation of Informatization Pilot Scheme
(1st Batch by Ministry of Education)Approved
China Higher Education Information Academy
Committee UnitElected
Served as
Heilongjiang Education Information Academy
Director Unit from 2003 - 2011
5
1. HUST puts great emphasis on education informatization implementation
2. Ensured sufficient budget
1. Professional team for informatization
6
3. Existing Foundation
1 . Comprehensive hardware ready for implementation of education informatization
2 . Abundant digital teaching resources
3 . 1st in the province with full-feature OneCardPass system
2. Basic facilities for informatization implementation ready
Unicom Exit Bandwidth 2000M
Unicom 1000M
Education Net 500MIPv6 1000M
China Telecom 500MChina Mobile 300M
Total Bandwidth of HUST: 5300Mbps
( 1 ) Campus Exit Bandwidth: 3300Mbps (Unicom 1000M, China Telecom 500M,
Education Net 500M, IPv6 1000M, China Mobile 300M)
( 2 ) Unicom Exit Bandwidth: 2000M
1. Bandwidth and Information Point Status
7
3. Existing Foundation
Accumulated 3600+ Lecture Hours
• Electromechnics Lecture Series is awarded National Excellent Resource Sharing and is available on iCourse website
300+ Open Courses
71 Local & Overseas Renowned Universities
• Lectures such as Basic Principles of Marxism and Basis of Computer Engineering are available online
• 3 excellent lectures and several micro lectures have also gone online
• The University has owned up to 31,000 clips for use within the campus
• Daily view reaches 10,000+ and accumulated 10 million views
• 6370GB E-books storage, 140,000 local and foreign periodic volumes, 22 literature databases, 2 self-established databases
8
3. Existing Foundation
Payment Management Applications
Campus Card Application System
Authentication Applications
Library Loan SystemWeb Touch Screen & Mobile Lost & Found
Interface Applications
Integrated Self-Service Applications
Canteen Payment Management
9
Bath Management & Power Supply
Campus Bus Payment
Campus Storehouse & Network Payment
Auditorium & Laundry Payment
Computer Room Payment Management
Bank Saving System
Hospital Interface
Self-Service Water Selling & Results Printout
Self-Service Payment
Auto & Self-Service Transfer Terminal
3. Existing Foundation
1. Great emphasis is put on education informatization construction
2. Comprehensive basic facilities ready
3. A wide range of informatization applications
1 . Digital campus applications support teaching, research, management, etc.
3 . Cooperative office system in use enhances management informatization
2 . Operation of online teaching platform for experience accumulation
10
3. Existing Foundation
4. Completion of unified data platform construction
4. Completion of unified data platform construction
Information Standardization
Sharing Database Unified Authentication System
Unified Information Portal Basic Campus Analysis System
11
• Campus OneCardPass System
• Library System
• Email System
• Cooperative Office System
• Property Management System
• Finance Management System
• Undergraduate Management System
• Research Management System
• Postgraduate Management System
• HR Management System
• Student Employment System
…….
3. Existing Foundation
1. Great emphasis is put on education informatization construction
2. Comprehensive basic facilities ready
3. A wide range of informatization applications
4. Completion of unified data platform construction
5. Cloud computing construction has got primary success
6. Active promotion of campus network culture
12
1 . Red website as vehicle gives full play to network education
2 . Set up online TV to enhance influence of HUST in the society
3. Establishment of online school history database
• Student’s MV production “I Believe” reaches more than 20 million views nationwide
• Broadcast of 2 student DV works on China Central Television
• Abundant high-quality clips are highly recommended on major video-sharing websites
3. Existing Foundation
Implement management informatization and improve management efficiency for better management service
4. Pilot Scheme Objectives
Provide information services and improve service quality to offer better services
Focus on building service-centric digital campus by constructing the campus network,
management information system and personalized self-learning platform to assist the
university in improving the level of engineering talent cultivation for the society.
13
In the next phase of the digital campus
project, our university strives to build a
service-centric digital campus with online
education service and core integrated
services such as teaching, management,
research, logistics, industries and
community life, based on the network
resources, integration and sharing of
educational information and resources
service platform.
5. Pilot Scheme Content
14
(1) Promote the comprehensive campus wireless network construction
(2) Initiate the Mobile Campus Project
15
5. Pilot Scheme Content
Click the application and enter the public
interface. In the public interface, every user
can view the following information:
University News, Announcements,
University Impression, University Map,
Alumni’s Lives, University Online (school
activities, school themes and campus news
videos).
Student ID number is required for login into
more university applications.
Launch the Application
(2) Initiate the Mobile Campus Project
16
5. Pilot Scheme Content
Click the login button on the previous
page to enter the login page. Users can
use their student numbers and
passwords for authentication.
Login Authentication
(2) Initiate the Mobile Campus Project
17
5. Pilot Scheme Content
After authentication, 4 application
categories are shown: Learning, Living,
Work and Entertainment. Users can view
more detailed information by clicking
the icons.
4 Application Categories
(2) Initiate the Mobile Campus Project
18
5. Pilot Scheme Content
(1) Promote the comprehensive campus wireless network construction
(2) Initiate the Mobile Campus Project
(3) Digital Resources Sharing System
(4) Management System
1 . Collaborative learning management system upgrade
2 . Collaborative student management and service system construction
3 . Construction of a social evaluation system of teaching quality
4 . Research and collaborative innovation platform construction
(5) Integrate the informatization pilot scheme of the Ministry of Education and initiate the independent learning platform construction
(6) Network Cultural Platform Construction
1 . Student online education platform construction
2 . Create the network culture of encouraging innovation
Data sharing with the provincial Heilongjiang Learning Network
19
5. Pilot Scheme Content
(3) Summary and Acceptance Stage (2015.11—2015.12)
(2) Comprehensive Implementation Stage (2014.3 —2015.10)
(1) Initialization Stage(2013.12—2014.3)
6. Schedule Arrangement
20
(1) Organizational
Protection
(2) Investment Protection
(3) System
Protection
(4) Team
Protection
(5) Indubitable
Responsibility
7. Protective Measures
21
1 . Design and implement the service-centric digital campus.
2 . Implement the wireless network construction, Mobile Campus Project, digital resources sharing system and self-learning platform, and enhance the school management information system to promote the overall development of the service-centric digital campus.
3 . Promote the concept transformation of education and enhance teachers’ information literacy.
4 . Publish reports, papers and other research achievements of the pilot scheme.
22
8. Expected Results
23