PROPOSED FIRE HYDRANT
PRODUCTION BUILDINGS
OFFICE/LAB BUILDING
RETENTION POND(perc test needed)
PROJECT INFORMATION
APPLICABLE CODES:
BUILDING CODE:MECHANICAL CODE:ELECTRICAL CODE:PLUMBING CODE:FIRE CODE:ENERGY CODE:
APN: 021-071-45
OCCUPANCY: F-1, S-1, B, H-3ZONING: ICONSTRUCTION TYPE: TYPE II B
WALLS: TILT UP CONCRETEFULLY SPRINKLERED
H-3 AREAS ARE SEPARATED BY FIREWALLS AND THEREFORE INDEPENDENT FIRE AREAS.
BUILDING AREAS - SEE FIRE KEY PLAN THIS SHEET
STORAGE BUILDING: OVERALL AREA = 15,000 SF.10,000 SF WAREHOUSE (S-1), 5,000 SF MAINTENANCE SHOP (F-1)ALLOWABLE AREAS:NON SEPARATED USE MOST CONSERVATIVE (F-1): IF NON-SPRINKLERED, 15,500 SF > 15,000 SF okNOTE THE BUILDING MAY BE SPRINKLERED AT THE OWNER'S DISCRETION BUT WOULD NOT BE REQUIRED BY CODE.
OCCUPANCY:WAREHOUSE PORTION: 10000/500 = 20 OCCUPANTS (ONE W.C, ONE LAV REQUIRED)MAINTENANCE PORTION: 5000/100 = 50 OCCUPANTS (ONE W.C, ONE LAV REQUIRED)
PROVIDE (1) M AND (1) F RESTROOMS IN EACH SPACE
SCOPE OF WORK:THE PROJECT CONSISTS OF A MANUFACTURING AND OFFICE BUILDING AS WELL ASSTORAGE BUILDING. THE OFFICE BUILDING AND APPROXIMATELY 1/2 OF THEMANUFACTURING FACILITY ARE IN PHASE 1; THE SECOND 1/2 OF THEMANUFACTURING FACILITY AND A STORAGE BUILDING ARE PHASE 2. THEMANUFACTURING FACILITY RECYCLES THE LITHIUM-ION BATTERIES INTO RESALABLECHEMICAL COMPONENTS USING A NON-THERMAL SEPARATION TECHNOLOGY.
2018 IBC WITH NORTHERN NEVADA AMENDMENTS2018 UMC2017 NEC2018 UPC2018 IFC WITH NORTHERN NEVADA AMENDMENTS2018 IECC
PROJECT GENERAL INFORMATION AND CODE ANALYSIS:American Battery Technology Company930 Tahoe Blvd, Suite 802-16Incline Village NV 89451PHONE: (775) 473-4744 CONTACT: Chuck Leber
OWNER:
BJG Architecture & Engineering449 S. VIRGINIA STREET FOURTH FLOORRENO, NV 89501PHONE: (775) 827-1010 CONTACT: George Ghusn
ARCHITECTURE & STRUCTURALENGINEERING:
VICINITY MAP
1
2
3
45
LOCATION
FIRE KEY PLAN LEGEND
OCCUPANCY
1 720014,000H-3
ALLOWABLEAREA
ACTUAL AREA NOTES
2 13,60014,000H-3
3 20,10092,000B
4 12,30062,000F-1
5 30,00062,000F-1 PHASE 2
LOCATION
PLUMBING FIXTURE ANALYSIS
FUNCTION
1 7200INDUSTRIAL
AREA
2 10,900
3 20,100BUSINESS
4 14,560
5 30,000
INDUSTRIAL
INDUSTRIAL
INDUSTRIAL
OCCUPANTS
72
109
134
146
300
WATER CLOSET
3 / 6
DRINKINGFOUNTAINS
1 / 1
SERVICESINKS
1 / 1
M F
LAVATORIES
M F
3 / 6 3 / 4 3 / 4
2 / 3 1 / 1 1 / 1 32 / 5 3 / 3 3 / 3
TOTA
L =
327
2 / X 1 / X 1 / X2 / X 3 / X 3 / X PHASE 2 IS NOT DESIGNED
PLUMBING ANALYSIS NOTES:1. ANALYSIS IS BASED ON THE NORTHERN NEVADA AMENDMENTS.2. THE FIXTURE COUNTS ARE NOTED: REQUIRED / PROVIDED.3. THE SERVICE SINK FOR THE INDUSTRIAL PORTION IS LOCATED IN PART 3.4. THE RESTROOMS FOR PARTS 1, 2 AND 4 ARE LOCATED IN PART 3.5. THE UNISEX RESTROOMS ARE NOT COUNTED IN THE FIXTURE COUNT COLUMNS.
A UNISEX TRUCKERS RR ISALSO PROVIDED
A UNISEX RR IS ALSO PROVIDED.
NOTES
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
2:5
3 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
TITLE SHEET
TS.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SHEET INDEX
DRAWING DESCRIPTION
TS.1 TITLE SHEETARCHITECTURAL
A1.0 ARCHITECTURAL SITE PLANA2.1 OFFICE/LABORATORY PLANA2.2 SORTING/ PRODUCTION PHASE 1A4.1 ROOF PLANA6.1 ELEVATIONSA7.1 BUILDING SECTIONSA10.1 3D VIEWA12.1 STORAGE BUILDING
ABTC CONDITIONAL USE PERMITSUBMITTAL
LOGAN ROAD FERNLEY NEVADA
FIRE WALL
FIRE WALL
REVISIONS
REV # DESCRIPTION DATE
UP
UP
UP
SBSBSBSBSBSBSBSB SBSB
SBSB
3 .7
MONUMENT SIGN
NOT A PART
LOGAN ROAD
TRANSFORMER/SUBSTATION
EXIS
TING
TCI
D DI
TCH
5' - 0"
6' -
0"
8" CMU SOLIDGROUTED
RAISED METALLETTERS/SYMBOLSBOTH SIDES OFSIGN WALL
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:3
3 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
ARCHITECTURALSITE PLAN
A1.0
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1" = 50'-0" 1ARCHITECTURAL SITE PLANNOT TO SCALEMONUMENT SIGN
REVISIONS
REV # DESCRIPTION DATE
SB SB SB SB SB SB
SBSB SBSB
SB SB
OFFICE/LAB BUILDING
VEST100
LOBBY101
BOARDROOM
102
CONF103
CIR
CU
LATI
ON
104
OPEN OFFICE105
IT106
MENS107
WOMENS108
OFC/MTG109
OFC/MTG110
OFC/MTG111
CONF112
WELLNESS113 UNISEX
114MENS
LOCKER 1116
CIRCULATION120
PILOT BAYS121
LAB OFC122
PROCESS DEVLAB123
ANALYTICALLAB124
STORAGE125
PPE AREA126
SECURITY128
ENTRY129
WOMENSLOCKER 2
133
MENSLOCKER 2
134
DIRTY EXIT136
CLEAN PPE138
PROCESS201
104'
- 9"
9' - 0" 179' - 10 5/8"
GAS BOTTLES125A
FIRE RISER125B
FIRE RISER204
VAC125C
4' -
10 1
/4"
BREAK130
WOMENSLOCKER 1
115
JAN125D
2' -
11 1
3/16
"
GYM118
TRAINING/PRESENTATION117
collaboration wall
4' wall 4' wall
CLOSET117B
MENS117C
WMNS117D
HALL117A
VEST115A
VEST116A
PILOT BAY203
MAINELECTRICAL
116C
UK TSRPONML
22
44
5
6
7
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
43' -
9"
34' -
0"
27' -
0"
A7.11
33
27' -
0"
4A4A
JAN119
J.6
76' - 4"
3.13.1
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:3
4 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
OFFICE/LABORATORYPLAN
A2.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1/8" = 1'-0" 1ENLARGED OFFICE /LABORATORY PLAN
REVISIONS
REV # DESCRIPTION DATE
UP
UP
UP
SBSBSBSBSBSB
SBSB SBSB
SBSB
UK
180' - 0"
TSRPONML
55
66
1111
1212
93' -
3"
95' -
0"
5' -
0"
77
88
99
1010
NaOH30%6k
NaOH8%10k
H2SO420%10k
FeSO410k
H2O210k
Ca(OH)21.5k
WORKING AREA
RACK
ING
RACK
ING
RACK
ING
93' -
3"
20' -
6"
24' -
0"
24' -
0"
19' -
0"
7' -
6"5'
- 0"
20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0"
SHADED AREA IS MEZZANINE ABOVE
SORTING202
MEZ
ZANI
NE C
OLUM
N LI
NES
DRIVE INDOOR
CORRIDOR
116D
DRIVE INDOOR
DRIVE INDOOR
DRIVE INDOOR
(blockout?)
DRIVE INDOOR
(blockout?)
DRIVE INDOOR
DUNKTANK
DUNK
TANK
DRIVE INDOOR
ROREJECT
10k
ROREJECT
10k
JHGFEDCB J.6
160' - 0"
ROREJECT
10k
H2O210k
H2O210k
H2SO420%10k
H2SO420%10k
H2SO498%6k
FeSO410k
NaOH8%10k
NaOH8%10k
PHASE 1PHASE 2
ROINPUT10k
ROINPUT10k
ROINPUT10k
12' -
0"
DUNK
TANK
RACK
ING
RACK
ING
12' - 0"
HSOVERHEAD
DOOR
HSOVERHEAD
DOOR
PROCESSWATER
10kRO
INPUT10k
ROINPUT10k
ROINPUT10k
PROCESSWATER
10k
PROCESSWATER
10k
PROCESSWATER
10kPROCESSWATER
10k
PROCESSWATER
10k
PROCESSWATER
10k
FILTERS
FILTERS
PROCESSWATER
10k
7270.1 SF
SORTING202
13502.4 SF
PROCESS201
2780.5 SF
PILOT BAY203
9055.4 SF
WATERTREATMENT
205
63.9 SF
FIRE RISER204
269.7 SF
MAIN ELECTRICAL116C
95' -
0"
5' - 0"
PHASE 235,000 SF
18" DEEP CONCRETECONTAINMENTS - SET FOR110% OF LAGREST TANKCAPACITY
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:3
7 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
SORTING/PRODUCTION
PHASE 1
A2.2
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1/16" = 1'-0" 1SORTING/PRODUCTION BUILDING FLOOR PLAN
TANK YARD INPUT CHENMICALS:
1. CALCIUM HYDROXIDE: 1321 GALLONS2. HYDROGEN PEROXIDE: 26,418 GALLONS3. IRON SULFATE: 13,209 GALLONS4. SODIUM HYDROXIDE, 8%: 26,418 GALLONS5. SODIUM HYDROXIDE, 30%: 5,283 GALLONS6. SULFURIC ACID 20%: 26,418 GALLONS7. SULFURIC ACID 98%: 5,283 GALLONS
REVISIONS
REV # DESCRIPTION DATE
UP
UP
UK TSRPONML
2
4
5
6
11
12
7
8
9
10
3
JHGFEDCB
4A
J.6
3.1
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:4
0 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
ROOF PLAN
A4.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1/16" = 1'-0" 1ROOF PLAN
REVISIONS
REV # DESCRIPTION DATE
THE OFFICE ANDPRODUCTION BUILDINGSHAVE REFLECTIVE WHITESTANDING SEAM METALROOFS.
THE OFFICE MECHANICALPLATFORM ROOF IS WHITEMEMBRANE ROOFING
FINISH FLOOR0' - 0"
HIGH EAVE44' - 0"
U KT S R P O N M L
OFFICE EAVE14' - 0"
J H G F E D C BJ.6
SE
FINISH FLOOR0' - 0"
HIGH EAVE44' - 0"
SOUTH EAVE34' - 0"
UK TSRPONMLJHGFEDCB J.6
SE
FINISH FLOOR0' - 0"
HIGH EAVE44' - 0"
SOUTH EAVE34' - 0"
24561112 78910
OFFICE EAVE14' - 0"
109' - 7 1/4"
34A 3.1
FINISH FLOOR0' - 0"
HIGH EAVE44' - 0"
SOUTH EAVE34' - 0"
2 4 5 6 11 127 8 9 10
OFFICE EAVE14' - 0"
3 4A3.1
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:4
6 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
ELEVATIONS
A6.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1/16" = 1'-0" 1NORTH ELEVATION
SCALE: 1/16" = 1'-0" 2SOUTH ELEVATION
SCALE: 1/16" = 1'-0" 3EAST ELEVATION
SCALE: 1/16" = 1'-0" 4WEST ELEVATION1
PAINTED TILT-UP CONCRETE
PAINTED CMU
EIFS ON METAL STUDS
PAINTED TILT-UP CONCRETE
PAINTED TILT-UP CONCRETE
PAINTED CMU
EIFS ON METAL STUDS
PAINTED TILT-UP CONCRETE
PAINTED CMU
EIFS ON METAL STUDS
PHASE 2 PHASE 1
PHASE 1 PHASE 2
REVISIONS
REV # DESCRIPTION DATE
COLORS SHOWN AREFROM THE OWNERSBRAND COLORS
FINISH FLOOR0' - 0"
HIGH EAVE44' - 0"
SOUTH EAVE34' - 0"
2 4 5 6 11 127 8 9 103 4A3.1
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
0:4
7 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
BUILDINGSECTIONS
A7.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 3/32" = 1'-0" 1Section 1
REVISIONS
REV # DESCRIPTION DATE
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
1:5
5 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
3D VIEW
A10.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
geg geg
2/12/21
REVISIONS
REV # DESCRIPTION DATE
SESW
S1
S2
S3
S4
S5
S6
S7
100' - 0"
A12.13
A12.1
4
A12.1
5
25' -
0"
25' -
0"
25' -
0"
25' -
0"
25' -
0"
25' -
0"
150'
- 0"
FINISH FLOOR0' - 0"
S1 S2 S3 S4 S5 S6 S7
STORAGE BUILDINGEAVE
26' - 0"
FINISH FLOOR0' - 0"
S1S2S3S4S5S6S7
STORAGE BUILDINGEAVE
26' - 0"
25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"
FINISH FLOOR0' - 0"
SE SW
STORAGE BUILDINGEAVE
26' - 0"
FINISH FLOOR0' - 0"
SESW
STORAGE BUILDINGEAVE
26' - 0"
SESW
S1
S2
S3
S4
S5
S6
S7
SEAL:
SHEET TITLE:
SCALE:
PROJECT NO:
CHECKED:
SHEET
DESIGNED/DRAWN:
DATE:
/
As Noted
Copyright 2021. All rights reserved by BJG Architecture &Engineering. This drawing is an instrument of service. It is theproperty of BJG and may not be reproduced without the expresswritten authorization from BJG Architecture & Engineering.
PRO
JEC
T IN
FOR
MA
TIO
N:
ISSUED FOR:
449 S. Virginia St.Fourth Floor
Reno, NV 89501(775) 827-1010www.bjginc.com
2/1
2/2
021 1
0:5
2:0
2 A
MJ:
\CD
\20
20\2
0200073A
\Dra
win
gs\
AB
MC
CO
MB
INE
D B
UIL
DIN
G O
VE
RA
LL F
OR
CU
P.r
vt
20200073
ABT
C C
ON
DIT
ION
AL
USE
PERM
IT S
UBM
ITTA
L
STORAGEBUILDING
A12.1
2/12/21
LO
GA
N R
OA
D F
ER
NLE
Y N
EV
AD
A
CONDITIONAL USEPERMIT
GEG GEG
2/12/21
SCALE: 1/16" = 1'-0" 1STORAGE BUILDING FLOOR PLANSCALE: 1/16" = 1'-0" 2STORAGE BUILDING WEST
SCALE: 1/16" = 1'-0" 3STORAGE BUILDING EAST
SCALE: 1/16" = 1'-0" 4STORAGE BUILDING NORTH
SCALE: 1/16" = 1'-0" 5STORAGE BUILDING SOUTH
INSULATED METALBUILDING PANEL
PAINTED CMUWAINSCOT TO 8'
INSULATED METALBUILDING PANEL
PAINTED CMUWAINSCOT TO 8'
INSULATED METALBUILDING PANEL
PAINTED CMUWAINSCOT TO 8'
INSULATED METALBUILDING PANEL
PAINTED CMUWAINSCOT TO 8'
SCALE: 1/16" = 1'-0" 6STORAGE BUILDING ROOF PLAN
THE STORAGE BUILDING HAS AREFLECTIVE WHITE STANDINGSEAM METAL ROOF.
REVISIONS
REV # DESCRIPTION DATE