Transcript
ACHIEVING THE VISION REQUIRES: Long-term Interconnection-Wide Planning Efforts
Resolution of Cost-Allocation Issues
Support for Siting of Interstate EHV Transmission Lines
ACHIEVING THE VISION REQUIRES: Long-term Interconnection-Wide Planning Efforts
Resolution of Cost-Allocation Issues
Support for Siting of Interstate EHV Transmission Lines