Page 1: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

Action Plan for WP.3

What is expected from project extension

Welfare Mix DaysUlcinj, July 2-3 2015

Adriatic Welfare Mix

Page 2: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

The aims of WP 3.3?

• Setting up a model for delivering decentralized social services for vulnerable groups (or Agency for delivering decentralized social services).

• The Municipality of Tirana in cooperation with project partners and stakeholders decided that the Social Service Center “Shtëpia e Përbashkët” located in Lapraka Tirana, should be a pilot center for implementation the model of the Welfare Mix Model.

• NCSS as responsible partner for WP3 was charged with the task of evaluation of physical, human and material capacities of the center.

Page 3: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

What was done regarding WP 3.3 ?

The above task is perceived in two dimensions: firstly, the evaluation of the physical capacities of the amenities and the need to return them in appropriate environments for multidisciplinary social services;

secondly, capacity need assessment of the center's staff and their needs for knowledge, practices and new approaches appropriate for Welfare Mix Model.

Page 4: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

Regarding the First Task

Was prepared a document which contains the plan for internal arrangements of the center premises, aims to optimize the space in accordance with the services offered by the center.

Page 5: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

Regarding the Second Task

• Was prepared a document which contains: a) manual procedures and internal regulations

of the center; b) the duties and responsibilities of each of the

center employees; c) the types of services and the way they should

be organize in order to better address the client’s needs;

d) the needs for capacity building of the staff.

Page 6: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

What was proposed by experts

• As a result of the capacity need assessment, the team of experts found and proposed areas of intervention for building capacities of existing staff.

Page 7: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

Proposed training topics

• Conduct training for leadership and management.

• Conduct training for monitoring and evaluating and performance of services and staff.

• Conduct training for operational capacity.• Conduct training for health and aid• Conduct training for work ethics, involvement

and participation of the beneficiaries, the management of staff stress

Page 8: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

What is expected form project extension

Capacity building for staff team of Social Services Centres supported by Tirana Municipality.

Page 9: Action Plan for WP.3 What is expected from project extension Welfare Mix Days Ulcinj, July 2-3 2015 Adriatic Welfare Mix

The aim

Enabling the development of their capacities,

strengthening professional skills in order to design, implement and evaluate services in the framework of fulfilling their mission.