1 N. E. Railway , Varanasi
Operating Department
Geo-Physics
2
No. of states
coverage 2
UP &
Bihar
No. of Districts
coverage
11 UP
3 Bihar
Contd…
Jurisdiction Six Control Boards
1 2 3 4 5 6
Main Board(CTC) BTT Board CPR Board ALY Board CPJ Board MHC Board
CI-GKP BTT-ARJ-JNU CPR-ARJ
ARJ-ALD
GKP-PNYA Closed since
01-04-15 for
gauge
conversion of
CPR-THE
DDA-MHZ
MAU-SHG
PEP-IAA
CPJ-THE
SRU-BHJ SV-THE
IAA-DIT(MG) HTW-BHBR
Jurisdiction of Eleven Sectional TIs HQs
1 2 3 4 5 6 7 8 9 10 11
CPR SV BTT CPJ POU MAU BCY MUV GCT BUI AMH
CP
R-G
OP
G
TKV-SV
ZR
DE
-KH
M U
NL
A-P
NY
A
CP
J(Ex
cl)-
TH
E(E
xcl)
BT
T(E
xcl)-
AR
J(Ex
cl) JNU-
ARJ(Excl) M
BS
-AL
Y
AR
J-K
MD
R
GTST-PEP
MAU(Excl)-
SHG(Excl) ARJ(Excl)-
KFK PEP-RTP
SV-THE
HTW-BHBR
Assets BG MG Total
Single Line 919.82 KM 143.77 KM 1063.59 KM
Double Line 180 KM -- 180 KM
Twin Single Line 8.3 KM -- 8.3 KM
Total 1108.12 KM 143.77 KM 1251.89 KM
No. of Block Stations 109 11 120
No. of Halt/Flag Stations 56 19 75
Type of Signalling
(No. of stations )
Colour Light Semaphore Total
BG MG BG MG
Modified Non
Interlocked (MNI) 1 -- -- -- 1
Standard-I 3 -- 12 Nil* 26
Standard-III 93 -- -- -- 93
Total 97 -- 12 11 120
* MG section (CPR-THE:11 stations) is closed for GC work since 01-04-15)
Contd…
System of working BG MG Total
Absolute Block System 109 Block Stations 11 Block Stations (Closed for GC work)
120
Automatic Block System Nil Nil Nil
One Train Only 3 sections (9 Halts) 1 Section (5 Halts) 4 sections
Railway Electrification
Section Status
BJU-CI-CPR-BTT Completed
BTT-GKP Completed
Yet to be commissioned
SV-THE Completed
CPR-BSB-ALD Work Sanctioned ( In initial
progress : to be done by RVNL)
5
Contd…
Contd…
SN Sections Jurisdiction D. Line/
S .Line Gauge KM
No . of
Stations +Halts
Inter
locking
System of
Working
1 CI-GKP CI-GKC(Excl) DL BG 180 22+4=26 Std-III Absolute Block
System
2
GKC(Excl)-
PNYA
UNLA-PNYA SL BG 86.06 8+3=11 Std-III Absolute Block
System
3 CPJ-THE
CPJ-THE SL BG 98.8 10+6=16 Std-III
Absolute Block
System
4
BT
T-B
SB
BTT-IAA SL BG 59.91 5+4=9 Std-III Absolute Block
System
IAA-MAU TSL BG 8.3 1+0=1 Std-III Absolute Block
System
MAU-BSB SL BG 92.39 10+3=13 Std-III Absolute Block
System
5 BSB-ALD
MUV-
KWH (Excl) SL BG 27.48 3+3=6 Std-I
Absolute Block
System
KWH-ALY SL BG 90.5 13+3=16 Std-III
(Excl DRGJ)
Absolute Block
System
6 CPR-ARJ CPR-ARJ SL BG 172.45 20+7=27 Std-III Absolute Block
System
Contd..
Contd…
Contd…..
SN Sections Jurisdiction D.Line/
S .Line Guage KM
No . of
Stations +Halts
Inter
locking
System of
Working
7 MAU-SHG MAU-SHG SL BG 99.46 9+4=13 Std-I Absolute
Block System
8 PEP-IAA PEP-IAA SL BG 49.68 3+4=7 Std-I Absolute
Block System
9 SRU-BHJ SRU-BHJ SL BG 20.25 0+4=4 -- One Train
Only
10 DDA-MHZ DDD-MHZ SL BG 5.7 0+1=1 Std-III One Train
Only
11 SV-THE SV-THE SL BG 28.17 3+1=4 Std-III Absolute
Block System
12 HTW-BHBR HTW-BHBR SL BG 22 0+4=4 -- One Train
Only
13 ARJ-JNU ARJ-MFJ SL BG 63.2 2+5=7 Std-III Absolute
Block System
Total BG Route KM 1108.12 109+56=165 --
14 CPR-THE CPR-THE
(GC is in progress) SL
GC in
progress 108.95 11+14=25 --
Absolute
Block System
15 IAA-DIT IAA-DIT SL MG 35 0+5=5 -- One Train
Only
Total MG Route KM 143.77 11+19=30 --
Total Route KM 1251.89 Total No. of Stations =109+11= 120
Total No. of Halts =56+19=75
Contd…
Rake Handling Terminals Contd…
Contd…
SN SectionName of
Station/Siding
Running Line/ Siding
Line
No.of
SpurCSL (Mts)
Avr. Rake
per Month
Whether
I/W or O/W
Commodity
Dealt With
Type of
SidingRemarks
Work
sanctioned
1 Siwan Siding L/no.-8 & 9 2 686 Each 44 I/WFert.,FG,CT,
StoneRly
Round the
clockImpr Work
2 Mairwa Siding L/No.-5 1 686 8 0 0 Rly Nil
3 Deoria SadarSiding L/No.-(6+7) & L/No.-7
(Extended)2 653 , 706 25 I/W Fert.,FG,CT Rly
Round the
clockNil
4 Baitalpur (BPOB) Siding L/no-5 1 686 32 I/W Petroliuum Pvt. SidingRound the
clockNil
5 Sardarnagar Running Line no.-5 1 716 6 I/W 0 Rly Nil
6 Kushumhi Running L/n-4 & 5 2 710 Each 7 I/WCoal ,Rock
PhosphateRly Nil
7 Mau Running L/no.-8 1 695 14 I/W Fert.,FG,CT Rly Nil
8 Azamgarh Running line no.-4 1 716 15 I/W Fert.,FG,CT Rly Nil
9 Gautam Asthan Siding L/no.-4 1 710 12 I/W Stone/Cement Rly
Line No.4
with rake
handling PF
10 Ballia Siding L/No.-(5+6) 1 645 15 I/W Fert.,FG,CT Rly Line No.5
11 Phephna Running L/no.-3 1 686 5 I/W Coal,BT Rly Nil
12 Gajipur City Running L/No.-4 1 686 8 I/W Fert.,FG,CT Rly Nil
13 Manduadih Siding L/no.-8 1 600 5 I/W Palm oil RlyRound the
clockNil
14 Katka Running L/no.-3 1 705 3 O/W BT Rly Nil
15 Siding L/no.-5 1 875 3 O/W BT RlyRound the
clockNil
16 Container Siding 1 730 3 O/WCarpet ,
Allumunium
products
Pvt.Siding Nil
17 Siwan-Thawe Hathua Running L/no.-3 1 686 20 I/WStone,
BoulderRly
Half rake
handling PF
18 Bhatni-Aurihar Indara Siding L/no-5 1 686 5 I/W Coal Rly
19 Tamkuhi Road Running L/no.-3 1 715 1 I/W Rly
20 Padrauna Running L/no.-3 1 733 7 I/WCement ,Food
GrainsRly
21 Varanasi-Aurihar Varanasi City Siding L/n-6 & 10 1+1/2 663 , 465 12 per year I/WOnion , BT ,
RMCRly
1 Chhapra-Gorakhpur Chauri Chaura Siding L/No.-5 One 300 0 I/W,O/W Fert.,FG Rly Nil
2 Chhapra-Gorakhpur Chhapra Siding One 309 , 150 18 I/W Fert.,FG,CT RlyRound the
clockNil
Half Rake
Ch
ha
pra
-Go
rak
hp
ur
Mau-Shahganj
Au
rih
ar-
Ch
ha
pra
Madhosingh
Va
ran
asi
-All
ah
ab
ad
Cit
y
THE-CPJ
Full Rake
:Others:
Assets Available at At
Running Rooms 8 stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ
Washing Pits 4 Station MUV (02 :full length) , CPR(01+01 under
construction : full length) , BUI(01 : 12 coach)
and AMH (01 : 20 coach)
Crew Changing Point 8 Stations CPR, BUI, MAU, BTT, SV, THE , ALY, CPJ Manduadih
Contd…
Contd…
SN Name of Station With Div/Rly. Avr. no. of Goods
trains daily
Total no. of
Mail/Exp
Total no.
of pass.
1 Chhapra Kacheri Sonpur/ECR 16 pairs 53 pairs 5 pairs
2 Paniyahwa Samastipur/ECR 6 pairs 10 pairs 6 pairs
3 Gorakhpur Cantt Lucknow/NER 13 pairs 49 pairs 12 pairs
4 Shahganj Lucknow/NR 2 pairs 13 pairs 4 pairs
5 Jaunpur Lucknow/NR 3 pairs 2 pairs 2 pairs
6 Varanasi Lucknow/NR 1 pair 16 pairs Nil
7 Allahabad City Allahabad/NCR 7 pairs 18 pairs Nil
Interchange Points
Notice Stations for Caution Orders
Varanasi Division (N.E.Railway) ( 16 stations )
Chhapra Jn. Indara Jn. Kaptanganj Jn.
Siwan Jn. Ballia Manduadih
Bhatni Jn. Aundihar Jn. Duraundha Jn.
Thawe Jn. Varanasi Jn. Azamgarh
Mau Jn. Allahabad City Varanasi City
Salempur Jn.
Other Division & Railways (05 station)
Gorakhpur Jn.
(LJN,NER)
Shahganj Jn.
(LKO,NR)
Narkatiaganj
(SPJ,ECR)
Allahabad Jn.
(ALD,NCR)
Jaunpur (NR ,LKO)
Contd…
Contd…
10
Items No. of location Stations
CMS Integrated 3 (A-Class ) BSB, CPR, MAU
CMS handled by
SM/ASM
2 BUI , BTT
7 (Sanctioned)
( Work in progress)
THE,CPJ,SV,ALY,MUV,ARJ,BCY
FOIS 2 CPR , BSB Control
TMS 12 DEOS , KHM , BALR , SV , CPR , MAU ,
BUI , AMH , MUV , GCT ,IAA , MBS
COIS 3 MUV , CPR , Control (BSB)
COA 1 Control room ( Connected to NTES)
Contd…
11
Coaching Operations
Contd…
12
Type Org.Trains Through Remarks
ME 26
73
Pa
irs
02
pai
rs t
o b
e
intr
oduce
d
Passengers BG 52 Nil --
DMU BG 03 Nil
Passengers MG Nil Nil --
DMU MG 05 Nil --
Total 86 73 Pairs --
Contd…
Contd…
M/EXP PASS Total
GKP-BTT 41 4 45
BTT-SV 32 4 36
SV-DDA 32 10 42
DDA-CPR 32 8 40
GKP-PNYA GKP-PNYA 11 8 19 13 Pairs 8 Pairs
BTT-SRU 13 6 19
SRU-IAA 13 4 19
IAA-MAU 22 7 29
MAU-ARJ 11 6 17
ARJ-BSB ARJ-BSB 27 9 36 22 Pairs 8 Pairs
BSB-MUV 20 3 23
MUV-ALY 20 3 23
ARJ -PEP 18 4 22
PEP-BUI 28 7 35
BUI-CPR 29 4 33
CPR-SEE CPR-CI 53 5 58 30 Pairs 15 Pairs
PEP-IAA PEP-IAA 10 3 13 8 Pairs 2 pairs
MAU-SHG MAU-SHG 13 4 17 10 Pairs 2 Pairs
CPJ-THE CPJ-THE - 4 4 4 Pairs 1 Pair
THE-SV THE-SV - 7 7 7 Pairs 2 Pairs
ARJ-JNU ARJ-JNU 2 2 4 4 Pairs 3 Pairs
SRU-BHJ - 4 4 4 Pairs Nil
HTW-PLWR - 1 1 1 Pairs Nil
DDA-MHZ - 5 5 5 Pairs Nil
IAA-DIT(MG) - 4 4 4 Pairs Nil
CPR-THE(MG) - 6 6 6 Pairs Nil
BG: 55 84
MG:05 (42 Pairs) per day
No. of trains in pairs Average
Coaching
Traffic Daily
(Pairs)
Average Goods
Traffic Daily
Total 99 15988(44 Pairs) per
day
Other Small
sections
25 Pairs 12 Pairs
14 Pairs
(MAU-IAA 20
Pairs)
13 Pairs
(BSB-MUV 15
Pairs)
18 Pais
4 Pairs
7 Pairs
7 Pairs
CPR-GKP
BTT-ARJ
BSB-ALD
CPR-ARJ
Section Sub Section
Stations No. of Mail/Exp No. Of Pass.
Allahabad City 1 3
Manduadih 7 4
Aurihar Jn. NIL 2
Ballia 1 3
Chhapra. 12 9
Varanasi 1 1
Mau 1 1
Azamgarh 2 1
Varanasi City 1 9
Salempur Nil 2
Bhatni Nil 6
Siwan Nil 11
Thawe Nil 6
Kaptanganj Nil 2
Ghazipur City Nil 1 (DMU)
Barhaj Bazar Nil 4
Indara Nil 4 RAIL BUS(MG)
Dohri Ghat Nil 4 RAIL BUS(MG)
Duraundha Nil 7
Bathua Bazar Nil 1
Maharaj Ganj Nil 5
Contd…
Contd…
Freight Movement
Features
Average No. of Goods Trains Interchange Per Day 100 per day
Average No. of Inward Rakes Per Month(2014-15) 260 per month
Average No. of Inward Rakes Per Day(2014-15) 9
Average No. of Jumbo Interchange (Thr. + Org.) 30 per day
No. of Rake Handling Terminals Major 13
Minor 8
Contd…
15
Geo Map of Varanasi Area
16
Varanasi Cantt Rly Station (NR)
To Lohta Station (NR)
To Manduadih NER
Existing Unused Alignment
Contd…
Contd…
To Shivpur (NR)
Plan in progress
1. Development of BSB area (BCY-BSB-MUV) in an integrated manner combining
traffic requirements and Land availability of NR & NER.
2. Decongestion of BSB & development of adequate through capacity so that BSB
Yard would not become a bottle neck after doubling and electrification.
3. Direct connectivity of MUV with LOT side so that terminating trains of RPC-IV and
PF return can be dealt directly at MUV without requiring them to be dealt at BSB .
17
Contd…
Thanks
18