Agile-Scrum in QA – Case study at TraderToolsAgile-Scrum in QA – Case study at TraderTools
Amitay ItskovitchTraderTools LLCQA ManagerEmail: [email protected]: +972-9-7408880, ext. 107
2
Presentation OverviewPresentation Overview
• TraderTools – Streaming Executable Rates today
• Scrum Agile Methodology
• How TraderTools Integrated QA into Scrum Agile
3
Who are we?Who are we?
• The Company's STPlatform™ enables the streaming of executable rates
from multiple sources, enabling any bank, broker or financial institution to
become an electronic liquidity provider.
• TraderTools™ LLC (TraderTools) is one of the world's leading suppliers of
electronic Foreign Exchange (eFX) white-label, software solutions.
4
5
Current Methodology – V Model / Water FallCurrent Methodology – V Model / Water Fall
• Pros:
– Clear process
– Clear division for responsibility
– sets of requirements are predefined
• Cons:
– Not flexible :
• Change requests in last minute
• Bugs in UAT
– Full cycles when finding Bugs
– Risks at the end of the process – new system
– Less time for QA
6
Presentation OverviewPresentation Overview
• TraderTools – Streaming Executable Rates today
• Scrum Agile Methodology
• How we in TraderTools Integrated QA into Scrum Agile
7
What is Agile?What is Agile?
• Mini Projects
• Iterations
– Each iteration is an entire software project: including planning,
requirements analysis, design, coding, testing, and documentation
• Dynamic
• Flexible
8
Scrum-Agile ElementsScrum-Agile Elements
• Time box
Limited time of 30 days for Specification Reviews, Coding and Testing
Date Driven!
• Sprints
Each month there is new sprint , the contents are from the product backlogs
(list of requirements)
• Drops
Each sprint will contain X number of drops (mini pieces of the module /
function ) for testing
• Backlog – Product Backlog – list of required features– Development Backlog - sprint scope, updated every day
Scrum-Agile Elements (2)Scrum-Agile Elements (2)
10
Team members
• Responding reliably to change instead of conforming to plan
• The team is making decisions instead of taking instructions
• More individual responsibility and Self management
• Collective responsibility
Scrum-Agile Elements (3)Scrum-Agile Elements (3)
11
Scrum-Agile Elements (4)Scrum-Agile Elements (4)
• Daily Scrum Meetings
– Daily 15 minutes15 minutes status meeting
– Same place and timeSame place and time everyday
– No discussionsNo discussions
– Keep chickens QUIETchickens QUIET
– Three questions:
• Things I have done since yesterday’s meeting
• Things I am going to get done today
• Obstacles that I need someone to remove
12
The full Process CycleThe full Process Cycle
13
Presentation OverviewPresentation Overview
• TraderTools – Streaming Executable Rates today
• Scrum Agile Methodology
• How TraderTools Integrated QA into Scrum Agile
14
Facing the Agile Challenges in QAFacing the Agile Challenges in QA
• Change tests methodology: Move from V- model to Scrum
• no chronological order
• Requirements are not finalized
• No customer
• Hard to plan test scenarios
15
Sprints 1-2Sprints 1-2
16
Lessons Learnt – Sprints 1-2Lessons Learnt – Sprints 1-2
• If you can’t test it don’t deliver it!!!
• QA wasn’t part of the sprint !
• Dev had to take their own time to adjust
• Ad hock Dev time re-evaluations and extensions
• Not enough time for QA
• No time for Dev to fix bugs (only blockers)
17
Sprints 3-4Sprints 3-4
18
Lessons Learnt – Sprints 3-4Lessons Learnt – Sprints 3-4
• Not enough time for QA
– write the docs took too much time
– do we need complete docs?
• QA overload – still single person
• No time for dev to fix bugs (only blockers)
– MUST assign time for bug fixes
• Timing of sprints and drops
• QA Backlog
19
Sprint 5Sprint 5
20
Lessons Learnt – Sprint 5Lessons Learnt – Sprint 5
• Sprint final delivery (2nd drop) to QA should equal delivery to
customer
• QA write only Test cases
• Start work with drops
• Bugs from drop 1 aren't to be fix till drop 2
• 2nd drop for QA should be finalized (requirements and code)
21
More ConclusionsMore Conclusions
• Do we need STP/STD?
– No requirements
– Takes too much time
• Better define and clarify Dev 2 QA
– Insist on Dev performing unit/integration tests
• Be part of the team: P.R. QA
• Lot of automation
– Nightly builds
22
AdvantagesAdvantages
• To product - stability
• To Developers – understand the requirements
• To QA – better knowledge of the product
• Flexible /Dynamic
• Clear state of code
• Quality: finding issues at the beginning
23
DisadvantagesDisadvantages
• No final view
• Hard to implement
• Human perspective
• No Team Leaders
• Challenge in managing the product
24
SummarySummary
• It won’t reduce time of Dev/QA.
• It will increase the product stability.
• Discover major issues at early stages.
• It will increase confidence in the product .
• It will reduce customers dissatisfaction (no design issues).
THANK YOU!THANK YOU!