ANNEXURES
ANNEXURE-I SRPC secretariat letter dated 15.04.2015 regarding ICTs at Kozhikode S/S of PGCIL
ANNEXURE-II Status of upcoming inter-regional transmission schemes under various stages
ANNEXURE-III Pictorial form of Over loadings of various transmission lines and ICTs
ANNEXRE-IV SRLDC Presentation on the planned transmission system ISTS and important corridors in 2016-17
ANNEXURE-V SRLDC Presentation on the envisaged transformation capacity by 2016-17 in various states
ANNEXURE-VI SRPC Secretariat letter dated 12.02.2015 on Utilization of Jeypore - Gazuwaka link
ANNEXURE-VII CTU reply dated 11.03.2015 on utilization of Jeypore - Gazuwaka link
ANNEXURE-VIII Minutes of the 38th Meeting of SCPSPSR
ANNEXURE-IX SRPC Secretariat Presentation on Reserve Shut Down
ANNEXURE-X SRPC Secretariat letter dated 12.03.2015 on ERS
ANNEXURE-XI RGMO analysis for 07.04.2015 at 21:02 hrs
ANNEXURE-XII RoP (26.02.2015) in CERC Petition 420/MP/2014
ANNEXURE-XIII SRPC secretariat letter dated 15.04.2015 enclosing NLDC Letter 06.04.2015 regarding certification of line rating / equipment rating for the purpose of adopting seasonal rating
ANNEXURE-XIV Communication dated 30.01.2015 received from CEA regarding CoD certification from RPCs
ANNEXURE-XV Status of data, voice, internet communication and pending field inputs
ANNEXURE-XVI SRLDC Issued Caution / Violation messages
ANNEXURE-XVII SRTS- II Presentation regarding implementation of AMR
Annexure-I (Page1 of 2)
Impl
emen
t-ing
(c
km)/
MVA
Sc
h. C
OD
CO
D/ C
OD
Con
stra
ints
/ Rem
arks
765
KV
D/C
Nar
endr
a(N
ewK
udgi
)-
Kol
hapu
rL
ine
(Ini
tially
char
ged
at40
0K
V)
PGC
IL37
6April’15
Dec’15
Mat
chin
gw
ithK
udgi
S/S
(Lan
dac
quir
edinFeb’
14).
LILO
ofci
rcui
tsof
Kol
hapu
r–
Map
usa
400
kVD
/CK
olha
pur
PGC
IL90
Apr
il’15
Dec
’15
Com
plet
ion
mat
chin
gw
ithS/
S.
400
KV
D/C
Nar
endr
a(N
ew K
udgi
)-N
aren
dra
(Exi
stin
g) L
ine
(Qua
d )PG
CIL
354
Apr
il’15
Dec
’15
Com
plet
ion
mat
chin
gw
ithre
adyn
ess
ofS/
S
Kol
hapu
r76
5/40
0kV
S/S
(GIS
)(in
itial
lych
arge
d40
0kV
)PG
CIL
Apr
il’15
Dec
’15
Awar
dpl
aced
inFe
b,20
14an
dw
ork
isun
derp
rogr
ess
Land
acqu
ired
inFe
b-14
765/
400
KV
Nar
endr
a(N
ewK
udgi
)S/
s(G
IS)
{cha
rged
at40
0K
V}
PGC
ILA
pril’
15D
ec’1
5Aw
ard
plac
edin
Mar
ch,2
014
Land
acqu
ired
inFe
b-14
Extn
.N
aren
dra
(Exi
stin
g)40
0/22
0kV
S/S
PGC
ILA
pril’
15D
ec’1
5Aw
ard
plac
edin
Mar
ch,2
014
Kudg
i TPS
– N
aren
dra
(new
) 2x
D/C
Line
M
/s K
udgi
Li
mite
d (L
&T
Infr
astru
ctur
e D
evel
opm
ent
Proj
ects
Ltd
.)
Feb’
15Se
p’15
Nar
endr
a-K
olha
purl
ine
byD
ec’1
5
Nar
endr
a(n
ew)
-M
adhu
giri
765
kVD
/CLi
neD
ec’1
5Se
pt’1
6
Mad
hugi
ri-
Bid
adi
400
kVD
/C(q
uad)
Line
Dec
’15
Sept
’16
Stat
us o
f upc
omin
g In
ter-
Reg
iona
l lin
ks N
aren
dra-
Kol
hapu
r 765
kV
D/C
line
An
nexu
re- I
II
Impl
emen
t-ing
(ckm
)/ M
VA
Sch.
CO
DA
nt C
OD
/A
ct C
OD
Con
stra
ints
/ Rem
arks
War
dha-
Niz
amab
ad76
5kV
D/C
PGC
IL25
0
War
dha
–R
aipu
rPS
765
kVD
/CPG
CIL
713
Dec
’15
Com
mis
sion
edon
15-1
1-20
14
Extn
.ofR
aipu
r765
kVS/
SPG
CIL
Dec
’15
Com
plet
ed
Extn
.ofW
ardh
a76
5kV
S/S
PGC
ILD
ec’1
5Ju
ne’1
5Aw
ard
plac
edin
June
,20
13.W
orks
unde
rpro
gres
sW
ardh
a–
Aur
anga
bad
765
kVD
/CPG
CIL
701
Dec
’15
Fe b
’15
Line
1co
mm
issi
oned
inJu
ly14
.Lin
eII
byFe
b’15
Extn
.ofA
uran
gaba
d76
5kV
S/S
PGC
ILD
ec’1
5Fe
b’15
Awar
dpl
aced
inJu
ne,
2013
.Wor
ksun
derp
rogr
ess
Extn
.ofW
ardh
a76
5kV
S/S
PGC
ILD
ec’1
5Fe
b’15
plac
edin
June
’13.
Engg
.,su
pply
,&ar
e
Niz
amab
ad-M
ahes
hwar
amPG
(Hyd
erab
ad)7
65kV
D/C
PGC
IL25
0
Niz
amab
ad-D
ichi
palli
400
kVD
/CPG
CIL
Niz
amab
ad-Y
eddu
mai
lara
m(S
hank
arap
alli)
400
kVD
/C
This
alon
gw
ith“M
ahes
hwar
amPG
-M
ahbo
obna
gar
400
kVD
/Clin
e”w
asth
roug
hba
sed
(TB
CB
)ro
ute.
was
reco
mm
ende
dG
oIfo
r
Mah
eshw
aram
PG76
5/40
0kV
,2x
1500
MVA
S/S
PGC
IL
Niz
amab
ad76
5/40
0kV
,2x
1500
MVA
S/S
PGC
IL
W
ardh
a - N
izam
abad
765
kV D
/C li
ne
Tran
smis
sion
Ele
men
tIm
ple-
men
ting
Age
ncy
Lin
e le
ngth
(c
km)/
MVA
C
apac
ity
CO
DC
onst
rain
ts/
Rem
arks
Sch.
Ant
/ A
ct
WR
-SR
HV
DC
Bip
ole
Lin
k[R
aigh
ar(C
hhat
isga
rh)
-Pu
galu
r(T
amil
Nad
u)]
PGC
IL
The
sche
me
had
been
awar
ded
toPG
CIL
(GoI
circ
ular
date
d10
.12.
2014
)as
info
rmed
in26
thSR
PCm
eetin
g .
Rai
garh
(exi
stin
g)-R
aiga
rh(H
VD
CSt
n)–4
00kV
2xD
/C(q
uad)
lines
6000
MW
,HV
DC
Term
inal
Stat
ion
atR
aiga
rh60
00
6000
MW
,HV
DC
term
inal
Stat
ion
atPu
galu
r(o
ral
tern
ativ
ely
(i)w
ith40
00M
WH
VD
Cte
rmin
al,
and
(ii)
2000
MW
HV
DC
term
inal
atM
adak
atha
ra,a
ndin
ter-c
onne
ctio
nw
ithex
istin
g40
0kV
AC
Subs
tatio
nat
Mad
akat
hara
.
6000
Rai
garh
(HV
DC
Stn)
-Pug
alur
(HV
DC
Stn)
6000
MW
,+/
-80
0kV
HV
DC
bipo
le.
Puga
lurH
VD
Cst
atio
n-Pu
galu
rexi
stin
gS/
S40
0kV
D/C
(Q)
Line
Puga
lurH
VD
Cst
atio
n-A
rasu
rS/S
400
kVD
/C(Q
)lin
ew
ith80
MVA
Rsw
itcha
ble
line
reac
tora
tAra
sure
nd.
Puga
lur
HV
DC
stat
ion-
Thiru
vala
mS/
S40
0kV
D/C
(Q)
line
with
80M
VAR
switc
habl
elin
ere
acto
ratb
oth
ends
Puga
lurH
VD
Cst
atio
n-Ed
ayar
pala
yam
S/S4
00kV
D/C
(Q)l
ine
with
63M
VAR
switc
habl
elin
ere
acto
ratE
daya
rpal
ayam
end
Eday
arpa
laya
mS/
S-U
dum
alpe
tS/S
400
kVD
/C(Q
)Lin
e40
0/23
0kV
,2x5
00M
VA,
Eday
arpa
laya
mS/
Sw
ith2x
125
MVA
Rbu
sre
acto
rs.
2x50
0
WR-
SR 6
000
MW
HVD
C Bi
pole
Link
[Rai
garh
(Chh
atis
garh
) -Pu
galu
r/Tr
ichu
r (TN
/KER
)]
Tran
smis
sion
Ele
men
tIm
plem
entin
g A
genc
y
Lin
e le
ngth
(c
km)/
MVA
C
apac
ityC
OD
Con
stra
ints
/ R
emar
ks
Sch.
Ant
/ A
ct
Ang
ul-
Srik
akul
amPS
765
kVD
/Clin
ePG
CIL
552
Jun'
15D
ec'1
5Pr
oces
sing
of f
ores
t cas
e ve
ry sl
ow a
t sta
te g
ovt.
leve
l; C
ritic
al.
Extn
.76
5/40
0kV
Ang
ulSu
bst
atio
nPG
CIL
1x15
00Ju
n’15
Jun'
15Aw
ard
plac
edin
Aug
ust,
2013
765
kVD
/CA
ngul
-Jh
arsu
guda
line
PGC
IL57
0D
ec'1
5D
ec'1
5R
oWbe
ing
face
d
765
kVD
/CJh
arsh
ugud
a-D
hara
mja
yaga
rhlin
ePG
CIL
230
Dec
'15
Dec
’15
Awar
dpl
aced
inM
ay,2
014
Hug
efo
rest
invo
lvem
ent
Extn
.of7
65/4
00kV
Ang
ulSS
PGC
ILD
ec'1
5D
ec’1
5Aw
ard
plac
edin
Aug
,13.
Engi
neer
ing
&C
ivil
wor
ksun
derp
rogr
ess
Extn
.of
765/
400
kVJh
arsh
ugud
aSS
PGC
ILD
ec'1
5D
ec’1
5Aw
ard
plac
edin
Aug
,13.
Engi
neer
ing
&C
ivil
wor
ksun
derp
rogr
ess
Extn
.of
765/
400
kVD
hara
mja
igar
hSS
PGC
ILD
ec'1
5D
ec’1
5Aw
ard
plac
edin
Aug
,13.
Engi
neer
ing
&C
ivil
wor
ksun
derp
rogr
ess
Angu
l - S
rikak
ulam
PS
765
kV D
/C li
ne
Srik
akul
amP
P-Ve
mag
iri-
IIPo
olin
gst
atio
n76
5kV
D/C
line
M/s
Viz
ag
Tran
smis
sion
Li
mite
d(A
subs
idia
ry o
f PG
CIL
)
30.0
8.20
16
July
’16
Und
erim
plem
enta
tion
Srik
akul
amPo
olin
gSt
atio
n76
5/40
0kV
,2x1
500
MVA
PS(4
00kV
-A
IS&
765
kV–
GIS
)
PGC
IL2x
1500
Jun'
15Ju
n'15
Wor
k un
der p
rogr
ess
Srik
akul
amPo
olin
gSt
atio
n–
Gar
ivid
i40
0kV
(Qua
d)D
/Clin
ew
ith80
MVA
Rsw
itcha
ble
line
reac
tor
atG
ariv
idie
nd.
PGC
IL
The
line
hasb
een
appr
oved
asIS
TSsc
hem
efo
rim
plem
enta
tion
inSC
PSPS
R-
37.
400/
220
kVS/
Sat
Mar
adam
(Gar
ivid
i)A
PTR
AN
SCO
Tend
ers
will
beca
lled
for
shor
tlyB
ehra
mpu
r-G
azuw
aka
400
kVD
/Clin
eM
/sTa
lche
rTr
ansm
issi
onC
ompa
nyLi
mite
d(S
ubsi
diar
yof
M/s
Rel
ianc
ePo
wer
Tran
smis
sion
Com
pany
Lim
ited)
290
CER
CR
OP
(for
18.1
1.20
14)
encl
osed
CEA
lette
r17
.11.
2014
:N
oph
ysic
alpr
ogre
ssvi
sibl
eon
grou
nd.
The
sche
me
need
edto
beim
plem
ente
dw
ithou
tan
yfu
rther
dela
y
Talc
her
II–
Beh
ram
pur
400
kVD
/Clin
e22
0
Talc
her
II-
Rou
rkel
a40
0kV
D/C
Qua
dlin
e16
1
Beh
ram
pur
400/
220
kV,
2x31
5M
VAS/
S2x
315
Angu
l - S
rikak
ulam
PS
765
kV D
/C li
ne
Tran
smis
sion
E
lem
ents
Li
ne L
engt
h (c
km)/
MVA
C
apac
ity
Impl
emen
ting
Agen
cy
Sch
CO
D
Con
stra
ints
/ Rem
arks
a E
stab
lishm
ent
of76
5/40
0kV
subs
tatio
nsat
War
anga
l (N
ew)
with
2x15
00M
VAtra
nsfo
rmer
and
2x24
0M
VAR
bus
reac
tors
.
The
sche
me
exce
pt
trans
mis
sion
ele
men
t at (
g)
has
been
app
rove
d as
ISTS
sc
hem
e fo
r im
plem
enta
tion
in
SC
PS
PS
R-3
7 (h
eld
on
31.0
7.14
). Th
e sc
hem
e w
as
reco
mm
ende
d to
the
GoI
for
impl
emen
tatio
n th
roug
h TB
CB
by
the
Em
pow
ered
C
omm
ittee
in it
s 33
rdm
eetin
g he
ld o
n 30
.09.
14. T
he
sche
me
was
not
ified
by
CE
A vi
de it
s no
tific
atio
n da
ted
09.0
2.15
. The
sch
eme
is
unde
r bid
ding
with
RE
CTP
CL
as it
s B
PC
.
The
trans
mis
sion
elem
ent
at(g
)w
asid
entif
ied
for
impl
emen
tatio
nun
der
com
pres
sed
time
sche
dule
thro
ugh
regu
late
dta
riff
mec
hani
smby
PG
CIL
.
b W
aror
aP
ool-
War
anga
l(N
ew)
765
kVD
/Clin
ew
ith24
0M
VAR
switc
habl
elin
ere
acto
ratb
oth
ends
.
c W
aran
gal(
New
)–H
yder
abad
765
kVD
/Clin
ew
ith33
0M
VAR
switc
habl
elin
ere
acto
ratW
aran
gale
nd.
d W
aran
gal
(New
)–
War
anga
l(e
xist
ing)
400
kV(q
uad)
D/C
line.
e H
yder
abad
–K
urno
ol76
5kV
D/C
line
with
240
MVA
Rsw
itcha
ble
line
reac
tora
tKur
nool
end.
f W
aran
gal(
New
)–
Chi
laka
lurip
eta
765
kVD
/Clin
ew
ith24
0M
VAR
switc
habl
elin
ere
acto
rat
both
ends
.
g LI
LOof
Kurn
ool-T
hiru
vala
m76
5kV
D/C
atC
udda
pah
h C
udda
pah-
Hoo
dy40
0kV
(qua
d)D
/Clin
ew
ith63
MVA
Rsw
itcha
ble
line
reac
tora
tbot
hen
ds.
Addi
tiona
l int
er-R
egio
nal A
C lin
k fo
r im
port
into
Sou
ther
n Re
gion
, i.e
., W
aror
a-W
aran
gal -
H
yder
abad
- Kur
nool
765
kV
link
C
EA N
otifi
catio
n da
ted
06.
02.2
015,
CEA
app
oint
ed P
FC C
L as
BPC
Tran
smis
sion
E
lem
ents
Li
ne L
engt
h (c
km)/
MVA
C
apac
ity
Impl
emen
ting
Agen
cy
Sch
CO
D
Con
stra
ints
/ Rem
arks
a Ve
mag
iriII
–C
hila
kalu
ripet
a76
5 kV
D/C
line
with
24
0 M
VAR
sw
itcha
ble
line
reac
tor a
t bot
h en
ds.
The
sche
me
has
been
ap
prov
ed a
s IS
TS s
chem
e fo
r im
plem
enta
tion
in
SC
PS
PS
R-3
7 (h
eld
on
31.0
7.14
). Th
e sc
hem
e ex
cept
the
trans
mis
sion
el
emen
t at (
e) a
nd (h
) was
re
com
men
ded
to th
e G
oIfo
r im
plem
enta
tion
thro
ugh
TBC
B b
y th
e E
mpo
wer
ed
Com
mitt
ee in
its
33rd
mee
ting
held
on
30.0
9.14
. The
sc
hem
e w
as n
otifi
ed b
y C
EA
vide
its
notif
icat
ion
date
d 09
.02.
15. T
he s
chem
e is
un
der b
iddi
ng w
ith R
EC
TPC
L as
its
BP
C.
The
trans
mis
sion
elem
ents
at(e
)an
d(h
)w
ere
iden
tifie
dfo
rim
plem
enta
tion
unde
rco
mpr
esse
dtim
esc
hedu
leth
roug
hre
gula
ted
tarif
fm
echa
nism
byP
GC
IL.
b C
hila
kalu
ripet
a–
Cud
dapa
h76
5 kV
D/C
line
with
24
0 M
VAR
sw
itcha
ble
line
reac
tor a
t bot
h en
ds.
c C
hila
kalu
ripet
a –
Nar
sara
opet
a 40
0 kV
(qua
d)
D/C
line
d C
udda
pah
–M
adhu
giri
400
kV (q
uad)
D/C
line
w
ith 8
0 M
VAR
sw
itcha
ble
line
reac
tor a
t bot
h en
ds.
e C
udda
pah-
Hin
dupu
r 400
kV
(qua
d) D
/C li
ne w
ith
80 M
VAR
sw
itcha
ble
line
reac
tor a
t Hin
dupu
r end
.
f S
rikau
kula
m P
oolin
g S
tatio
n –
Gar
ivid
i 400
kV
(Q
uad)
D/C
line
with
80
MVA
R s
witc
habl
e lin
e re
acto
r at G
ariv
idi e
nd.
g E
stab
lishm
ent o
f 2x1
500
MVA
, 765
/400
kV
su
bsta
tion
at C
hila
kalu
ripet
a w
ith 2
x240
MVA
R
bus
reac
tors
.
h E
stab
lishm
ent o
f 2x1
500
MVA
, 765
/400
kV
su
bsta
tion
at C
udda
pah
with
2x2
40 M
VAR
bus
re
acto
rs.
Syst
em st
reng
then
ing
with
in S
R fo
r tra
nsm
ittin
g po
wer
bey
ond
Vem
agiri
CEA
Not
ifica
tion
date
d 0
6.02
.201
5, C
EA a
ppoi
nted
REC
TPC
L as
BPC
Tran
smis
sion
line
cons
trai
nts
Anne
xure
-IV
Annexure-III
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
kV
Kola
r-H
osur
D/C
Lin
e flo
w
OCT
-201
4 N
OV-
2014
DE
C-20
14
400k
V Ko
lar-
Hosu
r DC
line:
•S2
bid
are
a dr
awl i
s lim
ited
by N
-1 o
f the
se li
nes
400k
V Ko
lar-
Hosu
r DC
line
flow
in Ja
nuar
y 20
15
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dur
atio
n Cu
rve
of 4
00 k
V H
iriyu
r-N
elam
anga
la D
/C L
ine
Flow
OCT
-201
4 N
OV-
2014
DE
C-20
14
400k
V Hi
riyur
-Nel
aman
gala
DC
line:
•
With
Ful
l gen
erat
ion
at J
inda
l and
BTP
S, a
nd w
ind
gene
ratio
n hi
gh, t
he fl
ow o
n 40
0kV
Hiri
yur-
Nel
aman
gala
DC
line
con
tinuo
usly
nea
r to
550M
W.
•40
0kV
Goo
ty-M
adhu
giri-
Yela
hank
a D
Clin
e w
ill re
lieve
con
stra
int s
ome
exte
nt
•Ye
ram
arus
Eva
cuat
ion
syst
em m
ay re
lieve
the
cons
trai
nt
•22
0 kV
DC
Hiri
yur-
Gbn
ur c
omm
issi
oned
rece
ntly
- Rel
ief o
f abo
ut 3
0-40
MW
eac
h lin
e ob
tain
ed
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
kV U
dum
alpe
t-Pa
lakk
ad D
C Li
ne F
low
OCT
-201
4 N
OV-
2014
DE
C-20
14
400k
V U
dum
alpe
t-Pa
lakk
ad D
C lin
e:
•K
eral
a dr
awl i
s m
ainl
y th
roug
h 40
0kV
Udu
mal
pet-P
alak
kad
DC
line
. •
Ker
ala
draw
l cap
abili
ty w
ill b
e lim
ited
by th
is li
ne.
•D
raw
al c
apab
ility
wou
ld in
crea
se w
ith 4
00 k
V D
/C M
ysor
e-K
ozhi
kode
line
0
100
200
300
400
500
600
700
800
900
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
kV
Jinda
l-BTP
S S/
C Li
ne
OCT
-201
4 N
OV-
2014
DE
C-20
14
400k
V Jin
dal-B
TPS
SC L
ine:
•
With
the
full
gene
ratio
n at
Jin
dal,
this
line
is g
ettin
g lo
aded
bey
ond
650
MW
. •
Oth
er e
vacu
atio
n pa
ths
are
400k
V Ji
ndal
-Gut
tur a
nd T
wo
ICTs
. •
But
at 2
20kV
sid
e al
so g
ener
atio
n is
ava
ilabl
e.
•Ye
ram
arus
sys
tem
may
relie
ve th
e co
nstr
aint
ICT
load
ing
cons
trai
nts
0 25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400
425
450
475
500
525
550
0%
5%
10%
15
%
20%
25%
30
%
35%
40
%
45%
50
%
55%
60
%
65%
70
%
75%
80
%
85%
90
%
95%
10
0%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
/220
kV G
azuw
aka
ICTs
Flo
w(2
x315
MVA
)
OCT
-201
4 N
OV-
2014
DE
C-20
14
Due
to H
uhud
ICT
load
ing
was
less
0 50
100
150
200
250
300
350
400
450
500
550
0%5%
10
%
15%
20
%
25%
30
%
35%
40
%
45%
50
%
55%
60
%
65%
70
%
75%
80
%
85%
90
%
95%
10
0%
MW
% o
f Tim
e
Load
Dur
atio
n Cu
rve
of 4
00/2
20kV
Nel
lore
ICTs
Flo
w(2
x315
MVA
)
OCT
-201
4 N
OV-
2014
DE
C-20
14
0 50
100
150
200
250
300
350
400
450
500
550
600
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Load
Dur
atio
n Cu
rve
of 4
00/2
20kV
Vem
agiri
ICTs
Flo
w(2
x315
MVA
)
OCT
-201
4 N
OV-
2014
DE
C-20
14
0 50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
/220
kV S
oman
ahal
li IC
Ts F
low
(2x5
00 M
VA)
OCT
-201
4 N
OV-
2014
DE
C-20
14
0 50
100
150
200
250
300
350
400
450
500
550
600
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
/220
kV M
ysor
e IC
Ts F
low
(2x3
15 M
VA)
OCT
-201
4 N
OV-
2014
DE
C-20
14
100
150
200
250
300
350
400
450
500
550
600
0%
5%
10%
15
%
20%
25
%
30%
35
%
40%
45
%
50%
55
%
60%
65
%
70%
75
%
80%
85
%
90%
95
%
100%
MW
% o
f Tim
e
Dura
tion
Curv
e of
400
/220
kV K
aliv
enda
patt
u IC
Ts F
low
(2x3
15 M
VA)
OCT
-201
4 N
OV-
2014
DE
C-20
14
0 50
100
150
200
250
300
350
400
450
500
550
600
0%
5%
10%
15
%
20%
25
%
30%
35
%40
%
45%
50
%
55%
60
%
65%
70
%
75%
80
%
85%
90
%
95%
10
0%
MW
% o
f Tim
e
Load
Dur
atio
n Cu
rve
of 4
00/2
20kV
Pug
alur
ICTs
Flo
w(2
x315
MVA
)
OCT
-201
4 N
OV-
2014
DE
C-20
14
Futu
re N
etw
ork
2016
-17
TIM
E FR
AME
Anne
xure
- VII
Annexure-IV
Dem
and
As p
er 1
8th E
PS D
ata
and
Dem
and
cons
ider
ed fo
r 20
16-1
7 St
udie
s
•As
per
stud
ies ,
SR
is st
ill in
def
icit
of a
bout
500
0 M
W d
urin
g 20
16-1
7.
Nun
na
Tiru
vala
m
Som
anah
alli
Dhar
map
uri
Nel
lore
Goo
ty
Karn
ool
Raic
hur
Shol
apur
Mad
ugiri
Vem
agiri
PS
Kham
mam
HY
D
War
da
Plan
ned
Tran
smiss
ion
syst
em IS
TS &
impo
rtan
t cor
ridor
s in
2016
-17
Khol
apur
Tutic
orin
PS
Nag
apat
tinam
PS
Kudi
gi
Yela
hank
a
Srik
akul
am P
S
Angu
l
Sale
m
Jun1
5
Jun1
5
Jun1
5
Dec1
5
Dec1
5 TB
CB
Jun1
5
MTP
S
Mar
15
Row
Mys
ore
Kojh
ikod
e
Row
Coch
in
Edam
an
Tiru
nelv
elli
C’Pe
ta
Kada
pa
NZB
AD
Nar
endr
a
H’pu
r
ST’P
alli
Podi
li
N T
richu
r IL
&FS
Coas
tal
NTP
L
Mad
urai
Kudi
gi
(3x8
00)
Bida
di
Jun1
5 Feb1
5
Row
Aug1
6
Dec1
5
Dec1
5
Mar
15
Aug1
6
Aug1
6
Dec1
5 TB
CB
Dec1
5 TB
CB
Mar
15
Karn
ool
Mad
ugiri
Vem
agiri
AP
Shan
kara
palli
Oth
er P
lann
ed T
rans
miss
ion
syst
ems
2016
-17
H’pu
r
Hidu
ja
(104
0 M
W)
Kalp
akka
KVKo
ta
Sury
apet
M
ehab
oobn
ager
Kond
apur
U
’kon
da
Gul
barg
a
Yera
mar
us
(2x8
00)
Edla
pur
1x80
0)
NLM
Tala
gupp
a CN
Hal
li
Hass
an
BTPS
PS
BTP
S (2
x500
+1x7
00)
Jinda
l (1
200)
Man
ikon
da
SDST
PS
(2x8
00)
Nel
lore
Chitt
ur
Hin
duja
ATS
Ye
ram
arus
& E
dlap
ur
Evac
uatio
n Sy
stem
SDST
PS(2
x800
)N
ello
re
Chitt
ur
Kris
napa
tnam
ATS
Vem
agiri
AP
Shan
kara
palli
Hidu
ja(1
040
MW
)
Kalp
akka
KVKo
ta
Sury
apet
Man
ikon
da
Mad
ugiri
Gul
barg
a
Yera
mar
us(2
x800
)Ed
lapu
r1x
800)
NLM
Tala
gupp
app
CNHa
lli
Hass
an
BTPS
PS
BTPS
(2x5
00+1
x700
) Jin
dal
(120
0)
Aug1
6 Au
g16
Jun1
5 Se
p 15
Jul1
5
Jul1
5 Ju
l15
Mar
15
Oth
er P
lann
ed T
rans
miss
ion
syst
ems
2016
-17
Upe
t
Eday
apal
ayam
An
ikad
avu
Kaliv
enda
patt
u
Thap
paku
ndu
Rasi
pala
yam
Tiru
nelv
elli
Kana
rpat
ty
Kaya
thar
Kara
ikud
i
Puga
lur
Kaliv
enda
patt
u
Tiru
nelv
elli
Kana
rpat
tyKaya
thar
Kara
ikud
i
Puga
lur
TN W
ind
Evac
uatio
n Ph
ase-
II
Dhar
map
uri
Upe
t
Eday
apal
ayam
Anik
adav
uuu
Thap
paku
ndu
Rasi
pala
yamDh
arm
apur
i
TN W
ind
Evac
uatio
n Ph
ase-
I
Feb1
5
May
15
May
15
?
?
Sr. N
o.
Subs
tatio
n Dr
awl s
how
n in
20
16-1
7 St
udy
(MW
)
Pres
ent
Tras
form
er
Capa
city
(MVA
)
Appr
oved
Aum
enta
tion
(MVA
)
1 40
0kV
Gazu
wak
a 65
2 63
0 -
2 40
0kV
Kalp
akka
28
1 63
0 -
3 40
0kV
Vem
agiri
10
08
630
- 4
400k
V N
unna
35
8 63
0 50
0 5
400k
V Sa
tten
apal
li 41
1 63
0 -
6 40
0kV
Talla
palli
15
1 94
5 -
7 40
0kV
Podi
li 47
1 -
630
8 40
0kV
Hind
upur
51
5 -
630
9 40
0kV
Goot
y 44
7 63
0 50
0 10
40
0kV
Karn
ool
593
630
315
11
400k
V Ch
inak
ampa
lli
364
630
500
12
400k
V Ch
ittur
40
0 63
0 -
13
400k
V N
ello
re
685
630
-
Tota
l 63
36
7245
30
75
Andh
ra p
rade
sh:
Envi
sage
d tr
ansf
orm
atio
n ca
paci
ty in
201
6-17
An
nexu
re- V
III
Sr. N
o.
Subs
tatio
n
Draw
l sh
own
in
2016
-17
Stud
y Pr
esen
t Tra
sfor
mer
Cap
acity
(MVA
) Ap
prov
ed
Aum
enta
tion
(MVA
) (M
W)
2 40
0kV
Nor
th T
richu
r 49
8 94
5 -
3 40
0kV
Pala
kkad
49
4 63
0 -
4 40
0kV
Coch
in
382
630
- 5
400k
V Tr
iven
drum
37
6 94
5 -
To
tal
1750
31
50
Sr. N
o.
Subs
tatio
n
Draw
l sh
own
in
2016
-17
Stud
y Pr
esen
t Tra
sfor
mer
Cap
acity
(MVA
) Ap
prov
ed
Aum
enta
tion
(MVA
) (M
W)
2 40
0kV
Gut
tur
413
630
- 3
400k
V M
unira
bad
202
630
- 4
400k
V Ra
ichu
r 35
3 63
0 -
5 40
0kV
Hiriy
ur
365
630
6
400k
V M
adug
iri
396
10
00
7 40
0kV
Hass
an
292
630
8
400k
V M
ysor
e 78
2 63
0 50
0 9
400k
V Ko
lar
514
1000
10
400k
V Ye
laha
nka
948
10
00
11
400k
V N
elam
anga
la
551
1500
12
400k
V Bi
dadi
53
6 10
00
13
40
0kV
Som
anah
alli
987
1000
50
0 14
40
0kV
Hood
y 65
6 15
00
- 15
40
0kV
elec
tron
ic ci
ty
292
10
00
To
tal
7287
97
80
3000
Envi
sage
d tr
ansf
orm
atio
n ca
paci
ty in
201
6-17
Kera
la
Karn
atak
a
Sr. N
o.
Subs
tatio
n
Draw
l sh
own
in
2016
-17
Stud
y
Pres
ent T
rasf
orm
er
Capa
city
(MVA
)
Appr
oved
Au
men
tatio
n (M
VA)
(MW
) 2
400k
V Sr
iper
umbu
dur
442
1345
-
3 40
0kV
SV c
hath
ram
67
9 63
0 -
4 40
0kV
kaliv
enda
patt
u 57
0 63
0 50
0 5
400k
V Sh
olin
gana
llur
566
63
0 6
400k
V Ti
ruva
lam
79
3 63
0 -
7 40
0kV
Tric
hy
543
630
500
8 40
0kV
Kara
ikud
i 50
9 63
0 -
9 40
0kV
Puga
lur
877
630
500
10
400k
V U
dum
alpe
t 67
3 94
5 -
11
400k
V Ka
yath
ar
161
630
- 12
40
0kV
Mad
urai
45
6 63
0 -
13
400k
V Ti
rune
lvel
li 37
6 63
0 -
14
400k
V Ka
napa
tty
79
?
To
tal
6724
79
60
2130
Envi
sage
d tr
ansf
orm
atio
n ca
paci
ty in
201
6-17
Ta
miln
adu
Envi
sage
d tr
ansf
orm
atio
n ca
paci
ty in
201
6-17
Te
lang
ana:
Sr. N
o.
Subs
tatio
n Dr
awl s
how
n in
20
16-1
7 St
udy
(MW
)
Pres
ent
Tras
form
er
Capa
city
(MVA
)
Appr
oved
Aum
enta
tion
(MVA
)
1 40
0kV
Dich
ipal
li 31
1 63
0 -
2 40
0kV
Ram
agun
dam
86
6 12
15
- 3
400k
V W
aran
gal
648
630
500
4 40
0kV
Kham
mam
24
5 63
0 50
0 5
400k
V M
ehab
oobn
ager
45
6 94
5 -
6 40
0kV
Gajw
el
626
945
- 7
400k
V Gh
anap
ur
1321
94
5 50
0 8
400k
V M
amid
ipal
li 97
6 94
5 31
5 9
400k
V M
alka
ram
87
3 94
5 -
10
400k
V Sh
anka
rapa
lli
986
945
- 11
40
0kV
Sury
apet
54
0 -
630
To
tal
7848
87
75
2445
•40
0/22
0 kV
Tra
nsfo
rmat
ion
Capa
city
•
Huge
220
kV E
vacu
atio
n is
requ
ired
as p
er
tran
sfor
mat
ion
capa
city
•
Also
Tra
nsfo
rmer
aug
men
tatio
n is
appr
oved
som
e pl
aces
•
Wha
t is t
he 2
20/2
30kV
Net
wor
k Pl
anne
d fo
r ev
acua
tion
? •
How
muc
h ev
acua
tion
is po
ssib
le a
t the
se p
lace
s in
the
2016
-17
time
fram
e?
•W
hat i
s the
qua
ntum
of D
raw
l exp
ectin
g in
201
6-17
fr
om th
e G
rid b
y co
nstit
uent
s?
Annexure-VI
Annexure-VII
Annexure –VIII (Minutes of 38th Meeting of SCPSPSR)
<47 Pages>
���� �����/�Government�of�India�
��� � �����/�Ministry�of�Power�
�� ��� ��� �������/�Central�Electricity�Authority�
����� ����� � �������� ��!�� �� ���"��System�Planning�&�Project�Appraisal�Division��#� ��, $�.�# . ����,��% &'!������110066�
Sewa�Bhawan,�R.K.�Puram,�New�Delhi�–�110066���
����������������Sub:� 38th� meeting� of� the� Standing� Committee� on� Power� System� Planning� of� Southern�
Region����Minutes�of�the�meeting�� �
Sir,��The�38th�meeting�of�the�Standing�Committee�on�Power�System�Planning�of�Southern�Region�was�held�on�7th�March,��2015�in�NRPC�Committee�room,�Katwaria�Sarai,�New�Delhi.�The�Minutes�of�the�meeting�are�enclosed.��The�Minutes�are�available�at�CEA’s�website�(�www.cea.nic.in�).���
�Yours�faithfully,�
�����������������������������������������������������������������������������������������������������������
��(�'�� (� '��/Pardeep�Jindal)�
��'#)��(���� � �� ���)/Director�(SP&PA)�Division,�(Tel:��011�26198092,�Fax:�011�26102945)�
��To�
1.�The�Member�Secretary,���Southern�Regional�Power�Committee,���29,�Race�Course�Cross�Road,���Bangalore�560�009.� ������FAX�:�080�22259343�
2.��The�Director�(Projects),�������Power�Grid�Corp.�of�India�Ltd.����“Saudamini”,�Plot�No.2,�Sector�29,�����Gurgaon�122�001,�Haryana.��������FAX�:��95124�2571932�
[ISO : 9001 : 2008]
2
3.��CEO,�POSOCO,������B�9,�Qutub�Institutional�Area,�������Katwaria�Sarai,������New�Delhi�110016�
4.�The�Director�(Transmission),�����Karnataka�State�Power�Trans.�Corp.Ltd.,������Cauvery�Bhawan,������Bangalore�����560�009.�����FAX�:��080��22228367�
5.The�Director�(Transmission),����Transmission�Corp.�of�Andhra�Pradesh�Ltd.,�����(APTRANSCO)���������Vidyut�Soudha,������Hyderabad�–�500�082.�����FAX�:�040�66665137�
6.�The�Director������(Grid�Transmission�and�Management),�����Transmission�Corp.�of�Telangana�Ltd.,�����(TSTRANSCO)�����Vidyut�Soudha,�Khairatabad������Hyderabad�–�500�082.�����FAX�:�040�23321751�
7.�The�Director(Trans�&�System�op.),���Kerala�State�Electricity�Board�Ltd,���Vidyuthi�Bhawanam,�Pattom,���P.B.�No.�1028,��Thiruvananthapuram���695�004.�����FAX�:�0471�2444738�
8.�Member�(Distribution),�����Tamil�Nadu�electricity�Board�(TNEB),�����6th�Floor,�Eastern�Wing,�800�Anna�Salai,�����Chennai���600002.�����FAX�:�044�28516362�
9.�The�Director�(Power),���Corporate�Office,�Block�–�I,�����Neyveli�Lignite�Corp.�Ltd.,�����Neyveli�,�Tamil�Nadu�–�607�801.������FAX�:�04142�252650�
10.�The�Superintending�Engineer�–I,������First�Floor,�Electricity�Department,������Gingy�Salai,�����Puducherry�–�605�001.�����FAX�:�0413�2334277/2331556�
11.�Director�(Projects),�National�Thermal�Power�Corp.�Ltd.�(NTPC),�NTPC�Bhawan,�Core�7,��Scope�Complex,�Lodhi�Road,��New�Delhi�110003.������FAX�011�24360912�
12.�Director�(Operations),������NPCIL,�12th�Floor,������Vikram�Sarabhai�Bhawan,������Anushakti�Nagar,�����Mumbai�–�400�094.��������FAX�:�022��25991258������
�Copy�to:�1.� The�Director�(Projects),��
Power�Grid�Corp.�of�India�Ltd.�“Saudamini”,�Plot�No.2,�Sector�29,�Gurgaon�122�001,�Haryana.�FAX�:��95124�2571932�
2.� GM,�SRLDC,�29,�Race�Course�Cross�Road,�Bangalore�560�009�FAX�–�080�22268725��
�
3
MINUTES OF MEETING
Draft-Minutes of 38th Meeting of the Standing Committee on Power System Planning in Southern Region (SCPSPSR) held on 7th March, 2015 at NRPC, Katwaria Saria, New Delhi
1. Introduction
1.1 Chairperson, CEA welcomed the participants and informed that a total of 19 agenda points and two additional agenda items will be discussed in the meeting. He requested Chief Engineer(SP&PA) to apprise the committee on the recent development regarding implementation of transmission projects.
1.2 CE(SP&PA), CEA welcomed the participants and informed the constituents about the schemes awarded through TBCB route and Compressed time Schedule. He stated that following schemes have been allocated to PGCIL under compressed time schedule:
(i) HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu)(iii) Erection of 220 kV line to Karaikal scheme
He also informed that the said that the “Additional inter-Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765kV link” scheme would be implemented through TBCB route.
He also informed the constituents that MoP has delegated the power for grant of prior approval u/s 68 of EA 2003 to Chairperson, CEA. Further, the Ministry is also in the process of issuing an order regarding timelines for concept to commissioning of transmission schemes, and according to which, the SCPSP meetings would be held on fixed dates.
With these views he requested Director (SP&PA) to take up agenda items.
1.3 List of participants is given at Annex-I.
1.4 These Minutes may be read along with the Agenda circulated for this meeting.
4
2.0 Confirmation of the minutes of 37th meeting of the Standing Committee
2.1 Director(SP&PA), CEA stated that minutes of the 37th meeting of the Standing Committee on Power System Planning of Southern Region were issued vide. CEA’s letter No. 51/4/(37th)/ SP&PA-2014/ 1729-42 dated 22nd September, 2014. SRLDC gave their observations regarding Vemagiri rearrangement and Hinduja Plant evacuation and additional agenda related to Vemagiri- Khammam- Hyderabad corridor. POSOCO vide their letter No NLDC/Planning/761 dated 24th Sept, 2014 cited a correction in para 12.3 of the minutes regarding 400/230 kV S/S at Tirunelveli Pooling Station. POSOCO suggested ‘one and a half breaker scheme’ instead of ‘double bus scheme for increased reliability’. Accordingly, corrigendum#1 was issued vide CEA letter no 51/4/(37th )/SP&PA-2014/1796-1809 dated 09-October, 2014.
2.2 Transmission Corporation of Andhra Pradesh Ltd(APTRANSCO) vide their letter No CE(IPC&PS)/ SE(PS)/DE(SS<SS) ADE-2/ F.37thSCM/ D.No.156/2014 dated 05.11.2014 have commented that the Cuddapah-Hindupur 400kV (quad) D/c line with 80 MVAr switchable line reactor at both ends may be implemented as ISTS instead of by APTRANSCO. Accordingly, corrigendum#2 was issued vide CEA letter no 51/4/(37th )/SP&PA-2014/2417-30 dated 22-December, 2014.
2.3 TNEB requested to include 2X125 MVAr reactor at Udangudi Power Project Stage-I (2x660MW).
2.4 Accordingly, the minutes of 37th Standing Committee of Power System Planning of Southern Region along with the Corrigendums, as circulated were confirmed.
Further, the scope under Connectivity for Udangudi Power Project Stage-I (2x660MW) of Para 3.8 of the Minutes is now modified as below:
Connectivity for Udangudi Power Project Stage-I (2x660MW):
(i) 400kV DC Quad line to the Udangudi Pooling station.
(ii) 2X125 MVAr, 400kV bus reactor at Udangudi Pooling station.
3.0 Augmentation of Transformer Capacities in SR
3.1 Director (SP&PA), CEA stated that studies have been carried out for the augmentation of transformers at a number of 400kV Substations for 2018-19 time frames.
3.2 He informed that in the above studies augmentation requirement at 17 Nos. of POWERGRID substation emerges.
5
Slno
Substation Existing / Approved trf.
Transformer Augmentation
Required
Remarks
1 HYDERABAD 3*315+500=1445 1000 Space not available 2 GAZUWAKA 2x315=630 500 Space not available 3 WARANGAL 2*315+500=1130 500 Space not available 4 MUNIRABAD 2*315=630 500 Can be carried out 5 MYSORE 2*315+500=1130 500 Space not available 6 KOLAR 2*500=1000 500 Space not available 7 NARENDRA 2*500=1000 500 Space not available 8 MADHUGIRI 2*500=1000 500 Can be carried out
9 MUVATTUPUZHA (KOCHIN) 2*315=630 500 Can be carried out
10 PALAKKAD 2*315=630 500 Can be carried out
11 TRICHY 2*315=630 2*500 One unit already
approved. No space for second
12 HOSUR 3*315=945 1000 Space not available
13 PUGALUR 2*315=630 2*500 One already
approved. No space for second
14 ARASUR 2*315=630 500 Can be carried out 15 KARAIKUDI 2*315=630 500 Can be carried out 16 TIRUNELVELI 2*315=630 500 Can be carried out
17 PONDICHERRY 2*315=630 500 Can be carried out
3.3 In sub-stations where in space is not available, it is proposed that joint studies can be carried out to finalise the various options like augmentation/Replenishing the transformers, shifting of loads, creation of new stations to meet the load.
3.4 Accordingly, the following transformer additions are proposed:
Slno
Substation Existing / Approved trf.
Transformer Augmentation Required
1 MUNIRABAD 2*315=630 500
2 MADHUGIRI 2*500=1000 500
3 MUVATTUPUZHA (KOCHIN) 2*315=630 500
4 PALAKKAD 2*315=630 500
5 ARASUR 2*315=630 500
6 KARAIKUDI 2*315=630 500
7 TIRUNELVELI 2*315=630 500
8 PONDICHERRY 2*315=630 500
6
3.5 COO(CTU),PGCIL stated that transformer augmentation of 500 MVA should be accompanied with two nos. of 220kV bays. They enquired about the requirement of additional 220kV bays by the states.
3.6 Director(T), KPTCL requested to wait till next meeting for the finalization of bays requirement at Munirabad and Madhugiri.
3.7 Director(T&SO), KSEBL stated that the evacuation feeders at 220 kV level from Palakkad and Kochi are to be firmed up before enhancing the ICT capacity. The load growth as projected is not likely to occur at Palakkad and Kochi. Commissioning of Mysore Areakode feeder and HVDC link to Madakkathara are also to be considered in this regard. Hence up-gradation of existing ICT s at Palakkad and Kochi may be considered in the next meeting. PGCIL replied that their Udumalpet- Palakad line is already overloaded and even if Areakod 400kV comes it would not relieve the loading. It was decided that KSEBL would revert back after detailed system studies and evaluation of feasibility of 220kV outlets.
3.8 CEO, POSOCO stated that along with augmentation of transformer, the 220kV outlets should be planned to take benefit of the additional transformation capacity. The states agreed to give their plan to CEA before next meeting of SCPSPSR. He also opined that ratio of fault level to transformation capacity should also be indicated.
3.9 After deliberations augmentation at Arasur, Karaikudi, Tirunelveli and Pondicherry were agreed and for the rest of the four locations, the decision was postponed till the next Standing Committee meeting and based on input provided by KSEB and KPTCL.
4.0 Transmission System for Coastal Tamil Nadu Power Ltd. (4000 MW) Cheyyur UMPP in Kanchipuram of Tamil Nadu
4.1 Director (SP&PA), CEA stated that M/s Costal Tamil Nadu Power Ltd.,(CTNP Ltd.) which is a SPV of PFC had applied for connectivity and LTA to CTU for evacuation of power from Cheyyur UMPP. The beneficiaries of the project are as given below :
Southern Region (3100 MW)
Western Region (400 MW)
Northern Region (500 MW)
Tamil Nadu -1600 MWKarnataka - 800 MWAndhra Pradesh - 400 MWKerala - 300 MW
Maharastra - 400 MW Uttar Pradesh -300 MW Punjab - 200 MW
7
The project is expected to be commissioned progressively from March 2019 to 2021.
4.2 He informed that the study has been carried out for 2020-21 condition with all generations expected in that time frame and the same has been furnished with the agenda. Considering the quantum of power to be evacuated following 765kV lines have been considered
� Cheyyur UMPP - Thiruvalam 765kV D/c line � Cheyyur UMPP –Salem 765 kV D/c line � Charging of Salem - Madhugiri 765kV D/c line at its rated voltage.
4.3 CE (SP&PA), CEA said that it is learnt that the Government has presently terminated the bidding process for the generation project.
4.4 COO(CTU), PGCIL expressed that as per regulation, they may not be able to hold the application for LTA and only when the applicant withdraws the application then its LTA can be cancelled.
4.5 Chairperson, CEA said that as the Government itself has terminated that bidding process for the generation project, we may keep the transmission planning in abeyance for the time being. The transmission that we plan now may have to be revised when the bidding resumes again.
4.6 It was decided that PGCIL would ask M/s Costal Tamil Nadu Power Ltd, the PFC SPV company to inform latest status of the generation project or if they may like to withdraw their application in view of termination of the bidding process.
5.0 Converting Fixed Line Reactors into Switchable Line Reactors in Over Compensated lines
5.1 Director(SP&PA), CEA stated that due to reduction in line lengths generally after LILO at certain nodes, some lines are being overcompensated with the existing fixed Reactors.
5.2 It is proposed that fixed Line Reactors installed in these lines be converted to switchable Line Reactors so that they may be utilised as Bus Reactors, as and when needed.
Capacity (MVAr)
Switchable (S) / Fixed(F)S.N
o.
Name of the Line Length(ckt km)
End I End II End I End II
%Compensation
8
1 Malakaram - Hyderabad-II (upto LILO point) *
27.87 -- 50 -- F 326.1
2 Kurnool – Gooty ** 112.60 -- 50 -- F 80.7
* - LILO of the one circuit of RTPS – Hyderabad(Ghanapur) 400 kV line at Malkaram.
** - LILO of N.Sagar – Gooty line at Kurnool 5.3 He stated that PGCIL have also proposed following lines where the existing
fixed Line Reactor(s) is over compensating the transmission line. And hence, may be converted into switchable line reactor.
Capacity (MVAr) Switchable (S) / Fixed(F)S.No.
Name of the Line Length(ckt km)
End I End II End I End II
%Compensation
1 Gazwel-Hyderabad-II 62.5 - 50 - F 132
2 Nellore-Tiruvellam-I & II 173 50 50 f f 95
3 Sriperumbdur-chitoor 105.7 50 - F - 78
4 Thiruvananthapuram-
Tirunelvelli
160 63 - F 65
5 Trichur-Palakkad- I & II 84 50 - f - 98
6 Udumalpet-Salem -II 137 63 - F - 76
7 Madurai-Karaikudi 130 63 - F 80
8 Sriperumbadur-SV Chatram 18 50 - F 458
9 Bangalore-Gooty 302 63 63 F F 69
10 Kochi-Tirunelveli-I & II 231 63 63 90
11 Madurai-Trichy 130 50 - F 63
12 Trichy-Nagapattinam-I 159 50 F 52
13 Trichy-Nagapattinam-II 159 63 F 65
14 Salem-Hosur-II 125 50 - F 66
5.4 PGCIL said that due to over compensation in the above lines there are resonances in the fixed line reactors leading to vibration in Reactors causing damage to Reactor windings, core and bushings. There is need to make these as switchable line reactors wherever the compensation is more than 80%.
5.5 CEO, POSOCO said that whenever LILO of a line is planned at that time itself the Dynamic Over Voltage (DOV) studies should be done, especially for line length above 100km DoV studies should necessarily be performed. He also
9
informed that from system operator point of view, they may charge the line without reactor, if the reactor is switchable.
5.6 Director(SP&PA), CEA enquired about status of NGR and the issue of higher voltages across circuit breaker contacts during switching off when these reactors are used as bus reactors. PGCIL explained that the necessary arrangement for bypassing of NGR and Controlled switching of Circuit breaker would be provided at these locations.
5.7 After deliberations, it was decided that the studies will be included to substantiate the requirement of converting fixed Line Reactor(s) into switchable line reactor.
6.0 Reactive compensation at Vemagiri S/S
6.1 Director(SP&PA), CEA informed that the following scheme was agreed under Constraints in 400 kV bays extensions at 400 kV Vemagiri S/s:
(i) LILO of both circuits of Gazuwaka/Simhadri-II –Vemagiri-I(AP) 400kV D/C line at Vemagiri-II(PG)
(ii) Straighten Nunna- Gazuwaka 400kV D/C line (by disconnecting the LILO at Vemagiri-I) so as to make Nunna – Vemagiri-II (PG) 400 D/C link
(iii) Use one LILO D/C portion (of Gazuwaka-Nunna at Vemagiri-I(AP)) to connect with K.V.Kota.
(iv) Second LILO D/C portion to be extended to Vemagiri-II(PG)
6.2 He informed that PGCIL has proposed that the 2x63 MVAr line reactors at Gazuwaka end on Simhadiri-II –Gazuwaka line (11 km) are proposed to be shifted to Vemagiri-II(PG) end of Simhadiri-II-Vemagir-II(PG) 400kV D/c line (200km) instead of planning new reactors.
6.3 CEO, POSOCO said that either the line reactor be converted into fixed line reactor or study need to be furnished. After discussions it was decided that
10
though the proposal seem to be in order, however the proposal needs to be substantiated with studies.
7.0 Termination of Narendra-Madhugiri line under TBCB
7.1 Director (SP&PA), CEA informed that as a part of Transmission system for evacuation of power from Kudgi generation(3x800 MW) project, Narendra-Madhugiri 765kV D/c line, charged at 400kV, has been proposed. The transmission line is being developed through Tariff Based Competitive Bidding route and has already been awarded to M/s L&T IDPL. Narendra-Madhugiri 765kV D/c is to be charged initially at 400kV and subsequently would be charged at 765kV. As the line is to be charged at 400kV, presently only 400kV bays are being provided at both ends of line by POWERGRID.
7.2 POWERGRID stated that at a later date when line is to be charged at 765kV, lines shall have to be reoriented for termination at 765kV bus, and the 765kV bays shall have to be provided.
7.3 It was agreed that the provision of 765kV line bays and work required to re-orient the transmission lines to the 765kV bus of PGCIL would be part of ISTS.
8.0 Charging for Kurnool - Thiruvalam 765kV D/c at 400kV
8.1 Director(SP&PA), CEA stated that Kurnool-Thiruvalam 765 kV D/c line of POWERGRID shall facilitate in import of power through Raichur - Sholapur 765 kV D/c lines to the power deficit states of Southern Region. However due to certain unavoidable circumstances there is delay of about 4-5 months in supply of 765kV equipment’s at Thiruvalam end. As an interim measure, till 765kV equipment’s are available, the line was proposed to be charged at 400kV level. CEA vide its letter dated 29/10/2014 has given in-principle clearance to charge Kurnool - Thiruvalam 765kV D/c at 400kV. This line along with Thiruvalam-MTPS Stage-III 400 kV D/c line of TANTRANSCO would help in enhancement of TTC between NEW Grid-SR Grid which shall facilitate in transferring the much required power to the Southern Region states.
8.2 PGCIL has informed that they have charged the line at 400kV on 27-11-2014 and that the line is expected to be charged at 765kV level by March 2015.
8.3 TNEB informed that reactor at Kayathar end of Kayathar- Karaikudi line was not shifted and instead a new reactor was installed at Mettur Stage III end of Thiruvelum- MTPS Stage III 400kV D/C line.
8.4 Members noted.
11
9.0 Re-orientation of Nellore –Vijayawada 400kV D/c line
9.1 Director(SP&PA), CEA stated that most of the works in VijayawadaPG (Nunna).-Nellore 400kV D/c has been completed. However, severe ROW problem is being encountered in termination of line at Vijayawada PG (Nunna). PGCIL has proposed to commission the line by reorientation of one circuit of Vijayawada TPS-IV –Vijayawada 400kV D/c.
9.2 He informed that PGCIL has proposed to terminate this line at Vijayawada end by LILO of one circuit of the VTPS-Nunna link of APTRANSCO. Study was carried out with original arrangement and with proposed arrangement. It is seen that the power flow on Nellore - Vijayawada 400kV lines is identical in both the cases
9.3 He informed that APTRANSCO while conveying its agreement has stated that PGCIL would need to do the following:
- Land to be acquired by PGCIL from APGENCO on payment for market value.
- Any short falls such as PIR for breakers at Vijayawada TPS and, PLCC equipment and any other civil structure works/shortfalls if required, to be borne by PGCIL.
- One 63 MVAr line reactor shifting to Vijaywada TPS (APGENCO switchyard) and of Vijaywada TPS - Nellore 400 kV line to be implemented by PGCIL.
9.4 After further deliberation re-orientation of Nellore –Vijayawada 400kV D/c line was agreed and it was decided that the issues raised by APTRANSCO would be mutually resolved by APTRANSCO and PGCIL.
12
10.0 Tapping of Uravakonda- Jammalamadagu D/c Quad line with Gooty –Madhugiri 400kV D/c line:
10.1 Director (SP&PA), CEA informed that Transmission Corporation of Andhra Pradesh Ltd. has proposed to tap Gooty - Madhugiri twin moose D/C ISTS line with their Uravakonda- Kondapur (Jammalamadugu) 400kv Quad moose line for one wind season i.e. from Apr 2015 to Oct 2015.
10.2 He informed that Uravakonda400kV S/s is expected to be commissioned by March’15 for evacuation of about 400MW wind generation expected in the similar time frame. However 400kV lines, envisaged from Uravakonda to Jammalmadugu and Mahaboobnagar substations, would not be completed by this time frame.
10.3 He stated that according to CEA’s safety standard Para 44.6 tapping of transmission line for any purpose is not allowed. He enquired about the commissioning schedules of Uravakonda –Jammalamadugu, Uravakonda - Mehboobnagar, Uravakonda- Hindupur 400kV lines to which APTRANSCO informed the schedule as August 2015, October 2015 respectively for the first two lines while for Uravakonda –Hindupur line tendering process has started.
10.4 Director, APTRANSCO said that they would bunch the D/C line from Uravakonda and connect it with portion of the Gooty –Madhugiri line at the place where the two lines cross.
10.5 PGCIL raised its concern about the effect of tapping after the commissioning of Gooty- Madhugiri 400kV line, to which APTRANSCO replied that they would make LILO of one circuit of the Gooty- Madhugiri 400kV D/C line at Uravakonda.
10.6 PGCIL then cited the issue of metering and transmission charges for use of the ISTS line.
10.7 DGM,SRLDC said that the tapping of Gooty – Madhugiri 400kV line may adversely effect the import capacity from New Grid. He suggested to perform system study for the Monsoon period.
10.8 KSEB said that injection at Gooty will affect the schedule through the 765kV
Raichur – Sholapur link and reduce the import capability of SR. The injection
proposed is only for short duration upto October 2015. However, this is
inclusive of the high demand period in SR. He further said that as per Clause
4.2 ( c ) of IEGC “Any new or modified connections, when established, shall
neither suffer unacceptable effects due to its connectivity to the ISTS nor
impose unacceptable effects on the system of any other connected User or
13
STU”. Therefore, when power is injected to Gooty transmission system, it will
adversely affect the import of power from WR, hence the proposal cannot be
accepted by KSEB.
10.9 KPTCL suggested that tapping the said line is in fact direct injection of 400MW at Gooty.
10.10 After further deliberations, it was decided that joint studies including SRPC, SRLDC, PGCIL and CEA would be performed and the issue would be re-discussed in the next SCPSPSR.
11.0 YTPS- Providing start-up power for Boiler light up and commissioning activities of unit 1:
11.1 Director(Trans), KPTCL informed that 100 MVA start up power would be required to start boiler light up and other commissioning activities of Yermarus TPS. KPTCL also informed that EPC contract has been awarded for executing work of LILO’ing the existing SC line between RTPS and Davanagere to facilitate drawl of power at 400kV level. The said LILO line crosses RTPS-Gooty 400kV Quad D/c line at a distance of 4.5 km from YTPS. Therefore, KPTCL has requested for permission for tapping/LILO’ing of RTPS-Gooty 400kV Quad D/c line, owned by PGCIL.
11.2 Director(SP&PA), CEA said that Tapping/LILO’ing of RTPS-Gooty 400kV Quad D/c line for start up power may have adverse implication on TTC and ATC and also involves commercial issues, metering, reduction of dispatch at Raichur TPS etc.
11.3 DGM, SRLDC said that the issue of Tap Connection from Raichur New-Gooty line for Yermaras startup cannot be agreed due to reliability risk and Protection issues and commercial constraints as well.
11.4 Director(SP&PA), CEA also said that presently one of the main constraints in import of power is loading on Gooty-Neelmangla and Gooty- Somanhalli lines.
11.5 KPTCL informed that as Edlapur TPS is not coming in the near future therefore, Yermarus to Gulbarga 400kV line is not taken up. He also said that they have carried out the studies and the result shows that 800 MW of power can be pumped without any constraints except issue of fault level at Raichur 220kV bus. He informed that the work at Bellary PS has been started and the transmission line from Yermarus to Bellary Pool would take another 24 months.
14
11.6 KSEBL opined that as requested by KPTCL, only start up power may be
allowed to draw from this for the commissioning activities and no injection from
YTPS should be allowed in ISTS without commissioning of their complete
evacuation system. The injection of power from YTPS reduces the import
capability of SR. As per Clause 4.2 ( c ) of IEGC “Any new or modified
connections, when established, shall neither suffer unacceptable effects due to
its connectivity to the ISTS nor impose unacceptable effects on the system of
any other connected User or STU”. Further, as per Clause 8 . 6 of CERC
connectivity regulations “connectivity does not mean that the utility can inject
power” KPTCL may avail start up power through the temporary LILO
arrangement. However, for injection of power the originally planned ATS has to
be in place.
11.7 After further deliberations, it was decided that joint studies including SRPC,
SRLDC, PGCIL and CEA would be performed and the issue would be re-
discussed in the next SCPSPSR. This can be taken up along with studies of
Uravakonda as mentioned above in these minutes.
12.0 Provision of space at various substations of POWERGRID
12.1 Director (SP&PA), CEA informed that TANTRANSCO has approached POWERGRID for execution of line bays at POWERGRID substations, agreed during the 37th Standing committee meeting of Southern Region held on 31/7/2014 :
� Kayathar – Koilpatty(PG) (Tuticorin Pooling point) 400kV DC � Kamuthi – Karaikudi(PG) 400kV D/c � Ariyalur – Thiruvalam(PG) 765kV D/c � Two no of 230kV Bays at Arasur � Two no of 230kV Bays at Shoolagiri (Hosur) � One no of 230kV Bays at Abhishekpatty
12.2 After discussions it was agreed that termination of the line from Kayathar may be considered at Tirunelvelli(PG) in place of Koilpatty(PG).
12.3 It was also agreed that after provision of above bays at Karaikudi, no further space would be available for any future line bays at Karaikudi 400kV. The bays for Thiruvalam(PG) 765kV line can be accommodated.
12.4 It was also decided that the bays for Abhishekpatty 230kV line can be
15
accommodated. Further it may be mentioned after provision of above bays no further space would be available for future line bays at Arasur 230kV.
12.5 At Shoolagiri (Hosur) 2nos of 230 kV line bays can be accommodated.
13.0 Evacuation of SEPC IPP(1x525 MW) –Proposed by TNEB:
13.1 SE, TNEB informed that M/S SPIC Electric Power Corporation Private Ltd (SEPC) has proposed to establish 1X525 MW power plant in Tuticorin as an IPP. To evacuate power from this project, TNEB has proposed following transmission system:
“400kV D/C line to the proposed Ottapidaram 400/230-110kV substation ”.
He said TNEB had informed that the earlier envisaged Udangudi projects (2x660 MW+ 1x800 MW) are being reviewed.
13.2 Director(SP&PA), CEA said that during 37th SCPSPSR, following transmission system was agreed for Udangudi projects:
a. 400kV D/C Quad line to the Kayathar 400kV S/S. b. 400kV D/C Quad line to the proposed Samugarengapuram 400/230-110
kV S/s c. 400kV D/C Quad line to the proposed Ottapidaram 400/230-110 kV S/s.
13.3 SE, TANGEDCO informed that Udangudi Phase-II is dropped as of now. Udangudi Phase-II and Phase-III will come later and their evacuation would be planned at 765kV level. He said that since the evacuation scheme of Udangudi is approved for the entire capacity of 2X660 MW+1X800 MW, SEPC of 1X525 MW may be accommodated in already approved evacuation system of Udangudi project taking the capacity to 2X660 MW+ 1X 525 MW.
13.4 MS, SRPC pointed out that the change in bus voltages are not exhibited in the studies furnished by TANGEDCO. Director(SP&PA), CEA said that in the load flow results sent by TNEB there is overloading in the Kanarpatti – Tirunelveli 400kV line.
13.5 After deliberation, following was decided
i) Prima-facie the transmission system that was earlier agreed for Urangudi Stage I and II may be sufficient to evacuate power from Udangudi 2x660 MW and SEPC 1x525 MW.
ii) TANGEDCO will furnish fresh studies.
13.6 Further CEA urged that TNEB should comply with the regulations of TNERC while planning and implementing the above transmission system. Specially
16
they should comply with “(i) Tamil Nadu Electricity Grid Code dated 19.10.2005 and its amendment from time to time, (ii) Tamil Nadu Electricity Regulatory Commission-intra-State Open Access Regulations 2005 and its amendment from time to time, (iii) Grid connectivity and intra-State Open Access Regulations 2004 and its amendment from time to time of TNERC and its amendments from time to time. TNEB would also ensure that they would follow the “Technical standards for connectivity to the grid Regulation 2007” of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system
14.0 Modifications for the Pulianthope 400/230kV S/s:
14.1 Director (SP&PA), CEA stated that the following scheme was approved for Pulianthope 400/230kV S/s during 37th SCPSPSR:
“400kV D/C Quad line from the proposed North Chennai Pooling Station and 400kV D/C line from Manali 400/230-110kV S/s”
14.2 SE, TANGEDCO stated that to cater the future load demand of Chennai city Pulianthope 400/230kV S/s has been proposed. The North Chennai Pooling Station may take some time to materialize, thus 400 kV SC line is proposed from North Chennai Stage II power plant to Pulianthope as a temporary measure.
14.3 Director (SP&PA), CEA suggested 400 kV DC line may be erected from North Chennai Stage II power plant to Pulianthope so that the same could be used subsequently.
14.4 MS, SRPC pointed out that no load flow has been furnished for the changed scheme of Pulianthope 400/230kV S/s, by TANGEDCO.
14.5 After deliberation, it was decided that TANGEDCO will furnish the studies considering 400kV D/C line from North Chennai Stage II power plant to Pulianthope. The studies will also show the complete 220kV and above transmission network in and around Chennai area under various operating scenarios.i.e peak, off peak, low wind, high wind etc.
14.6 Further CEA urged that TNEB should comply with the regulations of TNERC while planning and implementing the above transmission system. Specially they should comply with “(i) Tamil Nadu Electricity Grid Code dated 19.10.2005 and its amendment from time to time, (ii) Tamil Nadu Electricity Regulatory Commission-intra-State Open Access Regulations 2005 and its amendment from time to time, (iii) Grid connectivity and intra-State Open Access Regulations 2004 and its amendment from time to time of TNERC and its
17
amendments from time to time. TNEB would also ensure that they would follow the “technical standards for connectivity to the grid Regulation 2007 of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system
15.0 New 400kV Load Substation at Usilampatty
15.1 Director (SP&PA), CEA stated that TANTRANSCO has proposed 400kV load substation at Usilampatty with the following connectivity:
a. 400kV D/C connectivity with Kamuthi 400 kV S/s. b. 400kV D/C connectivity with Thappagundu 400 kV S/s.
15.2 SE, TANGEDCO stated that 400kV Load Substation at Usilampatty is not needed as of now, he requested 400kV Usilampatty S/s to be deferred.
16.0 Edayarpalayam 400/230-110kV S/s under the scope of TANTRANSCO:
16.1 Director (SP&PA), CEA stated that during the 37th SCPSPSR held on 31st
July, 2014, the following scheme was agreed under The scheme - “ HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu) :
(i) Raigarh(HVDC Stn) – Pugalur (HVDC Stn) 6000 MW HVDC bipole
(ii) Establishment of Raigarh HVDC Stn with 6000 MW HVDC terminals
(iii) Establishment of Pugalur HVDC Stn with 6000 MW HVDC terminals (or Alternatively: (i) with Pugalur HVDC Stn with 4000 MW terminal, and (ii) Madakkathara, in Kerala HVDC Stn with 2000 MW terminal and inter-connection with existing 400kV AC S/S at Madakkathara)
(iv) Raigarh HVDC Station – Raigarh(Existing) 400kV (quad) 2xD/c lines (or with bay extension)
(v) Pugalur HVDC Station – Pugalur (Existing) 400kV (quad) D/c line.
(vi) Pugalur HVDC Station – Arasur 400kV (quad) D/c line with 80 MVAr switchable line reactor at Arasur end.
(vii) Pugalur HVDC Station – Thiruvalam 400kV (quad) D/c line with 80 MVAr switchable line reactor at both ends.
18
(viii) Pugalur HVDC Station – Edayarpalayam 400 kV (quad) D/c line with 63 MVAr switchable line reactor at Edayarpalayam end.
(ix) Edayarpalayam – Udumalpet 400 kV (quad) D/c line.
(x) Establishment of 400/220kV substation with 2x500 MVA transformers at Edayarpalayam and 2x125 MVAr bus reactors.
In respect of above TANGEDCO has proposed establishment of Edayarpalyam 400/230-110 kV substation will be under the scope of TANTRASCO.
16.2 SE, TANGEDCO stated that for establishment of Edayarpalyam S/s, land has been purchased and the tendering work is under progress and the establishment of Edayarpalyam 400/230-110 kV substation will be under the scope of TANTRASCO. Also, there is no scope for 400kV bay extension at Udumalpet S/s as earlier communicated by PGCIL. Therefore, TANGEDCO has suggested that Udumalpet- Anikadavu 400kV S/c line may be LILOed at Edayarpalyam S/s. Thus TANGEDCO, has requested following works under their scope:
a. LILO of Udumalpet- Anikadavu 400kV S/c line at Edayarpalyam S/s. b. Establishment of 400/230-110 kV substation with 2x500MVA transformer
at Edayarpalyam and 2x125 MVAr bus reactors.
16.3 PGCIL informed that the space for bays at 400kV Udumalpet S/s is available and 400kV bays for Edayarpalyam- Udumalpet line can be accommodated. COO(CTU), PGCIL stated that delay in establishment of Edayarpalyam 400/230-110 kV substation and Edayarpalyam- Udumalpet line would effect the dispersal of power from Pugalur HVDC and the power may be bottled up.
16.4 In this regard it was suggested that if there is delay in commissioning of Edayarpalyam S/S , the Pugalur- Edayarpalyam line can be connected with Edayarpalyam- Udumalpet bypassing Edayarpalyam for the interim period.
16.5 After deliberations, following was decided:
i) Following will be in the scope of TANTRANSCO/TANGEDCO:
a. Establishment of 400/230-110 kV substation with 2x500MVA transformer at Edayarpalyam and 2x125 MVAr bus reactors
(The LILO of Udumalpet- Anikadavu 400kV S/c line at Edayarpalyam S/s is dropped for the time being in view of availability of bays at Udumalpet and the Edayarpalyam – Udumalpet 400kV D/C line, as in the scope of PGCIL).
19
ii) Edayarpalyam- Udumalpet D/C line would remain in the scope of PGCIL as ISTS
iii) TANGEDCO will commission Edayarpalyam S/S in the time frame matching with the requirement of Raigarh- Pugalur HVDC system.
iv) PGCIL will prepare a list of all the existing, under construction 400kV and above substations in SR indicating the number of transformers, reactors, lines, bays occupied, space for future bays for the 765kV, 400kV and 220kV buses. The format for this information may be decided in consultaion with CEA. Similar list may be prepared by other state also for their network. This list would be helpful for planning future transmission systems.
17.0 Construction of 400kV Quad D/C line from UPCIL (Karnataka) to Kasargod( Kerala).
17.1 Director (SP&PA), CEA stated that during the 35th meeting of SCPSPSR the following scheme was discussed and agreed:
Mangalore(Udipi PCL) – Kasargode – Kozhikode 400kV Link
(i) Mangalore(Udipi PCL) – Kasargode, 400kV quad D/c line
(ii) Kasargode – Kozhikode(Areacode), 400kV quad D/C line
(iii) Establishment of 2x500 MVA, 400/220kV GIS substation at Kasargode
17.2 In the 31st Empowered Committee recommended the schemes for implementation through TBCB subject to the commitment from the Kerala Government that the land compensation only for Right of Way (RoW) for the tower footing area will be paid, instead of the entire corridor. EC also suggested that firm commitment from UPCL for providing 400 kV bays at Mangalore (UPCL) switchyard may be obtained.
17.3 Director (SP&PA), CEA further said that UPCL has communicated the following:
“a) UPCL facility do not have any surplus land where 2 nos. of 400 kV bays can be erected as desired by you.
b) Under the provision of Power Purchase Agreement entered into between UPCL and ESCOM’s of Karnataka, UPCL and Punjab State Power Corporation Limited, Punjab, power is sold to the Buyers ex our switchyard and transmission facility is the responsibility of the Buyers.
20
c) Any additional Capital expenditure required to be incurred by UPCL needs to be approved by the Buyers as per the provisions of Power Purchase Agreement referred to above.
17.4 He informed that during site visit to UPCL generation switchyard, it was observed that there is space for additional two nos. of 400 kV line bays. These line bays can be constructed by extending the existing generation switchyard and dismantling some of the civil structures for creating gantry for the proposed 400 kV DC transmission line. During this visit it was also observed that the route from Kozikode to Kasargode has a thick plantation of coconut, rubber and beetle nut trees. Building transmission lines having sufficient clearance over and above these tall trees would require high rise transmission towers or cutting of these trees under the shadow of transmission lines
17.5 PGCIL said that these bays can be built as ISTS on Deposit work basis and there will not be any tariff impact on Karnataka DISCOMs because of these bays.
17.6 KSEB informed that the route between UPCL to Kasargode is comparatively better for laying transmission line.
17.7 Director(Trans),KPTCL said that the proposed 400 kV DC line to link UPCL to Kasargod may not serve the purpose of strengthening S1-S2 corridor. KPTCL further observed that since UPCL is an ISGS with 90% share of Karnataka, with the construction of 400kV line from UPCL to Kasargode, the 400kV D/C line from UPCL to Hasan will be under utilized. Also, Manglore( Udupi PCL)- Kasargod, 400kV D/C Quad line would not relieve S1-S2 congestion since the upstream 400kV lines beyond Hassan are not having capacity.
17.8 KSEBL informed that once the Kasaragod substation is commissioned adjacent to 220kV substation, Mylatty where land is available, the Kasaragod – Areakode portion can be constructed by extending the RoW of the existing 220kV line and constructing 400/220kV multi circuit multi voltage line. KSEBL do not expect much difficulty in extending the RoW to that of 400kV requirement.
17.9 KPTCL wanted more time and informed that their views will be communicated within two weeks after getting the views of the ESCOMs also.
17.10 It was decided that implementation of the UPCL- Kasargode 400kV D/C line can be initiated after considering views of Karnataka ESCOMS, if communicated within a month.
18.0 Start up power requirement of under construction NCC PPL Power Plant.
21
18.1 Director (SP&PA), CEA informed that as per NCC Power Projects Limited(NCCPPL) the NCCPPL (2X660MW) and Thermal Powertech Corporation India Ltd(2X660MW) (TPCIL) are geographically located adjacent to each other. The evacuation system for TPCIL (TPCIL- Nellore 400kV (QUAD)D/C) is already commissioned in Aug,2013.. They have informed that TPCIL is expected to commission in December, 2014 and NCCPPL by the end of 2015. NCCPPL- Nellore 400kV D/C (Quad) line, to be built by PGCIL, is expected to commission in Dec, 2015. However, back charging of 400kV switchyard of NCCPPL is expected in May, 2015. As a solution, NCCPPL have proposed LILO of one of the existing TPCIL- Nellore 400kV D/C line at NCCPPL bus bar to meet the start up power requirement.
18.2 COO(CTU), PGCIL informed that TPCIL- Nellore 400kV D/C line and NCCPPL- Nellore 400kV D/C (Quad) line would cross each other at one point. He suggested that PGCIL can construct NCCPPL- Nellore 400kV D/C (Quad) line from NCCPL switchyard upto this meeting point and connect it with one circuit of TPCIL- Nellore 400kV D/C line.
18.3 The above was agreed.
19.0 Cost impact of new and ongoing transmission schemes in Southern Region
19.1 Director (SP&PA), CEA informed that during the 37th Meeting of the Standing Committee on Power System Planning in Western Region held on 5.9.2014, it was decided that the tentative cost of new schemes would be included in the agenda/ minutes. In this meeting, the WR constituents have also expressed that it would be prudent if impact of new schemes on the transmission tariff is indicated in the agenda/minutes of the meeting. Accordingly the estimated costs of various transmission schemes were given in the agenda. This includes (i) list of transmission schemes that were discussed in the recent meetings of the Empowered Committee, (ii) list of schemes under construction by PGCIL and (iii) list of schemes that were awarded through TBCB and which are under construction.
19.2 COO (CTU), PGCIL observed that there is quiet a variance per unit/per km cost of the transmission elements as given in the agenda and the cost of some of the schemes were on higher side. She also observed that the comparison of the levellised YTC with the levellized YTC as per regulated tariff mechanism does not reflect the true picture and therefore may be avoided. She expressed that this difference may be due to unreasonable cost estimates and also because of the fact that the schemes which are being implemented through
22
TBCB had only transmission line elements and no Substation elements. The levellized tariff for substation and transmission lines is different.
19.3 CE(SP&PA), CEA said that the cost were based on CERC cost benchmarking(2010) as base cost and the costs Matrix as developed by the “cost committee” consisting of CEA, PGCIL, RECTPCL and PFCCL and these are tentative costs. He further informed that CEA is collecting the cost data from states and manufacturers and the cost matrix is being reviewed. Moreover, CERC benchmark cost does not include 765kV D/c and HVDC lines/terminal costs etc.
19.4 Based on the discrepancies indicated by PGCIL the revised cost estimates are given below:
List (i): Transmission schemes that were discussed in the recent meetings of the Empowered Committee
Sl.No.
Name of Transmission Scheme Est.Cost
(RsCrore)
Yearly Trans. Charges(YTC)
(Levelized) Rs Crore
(@17% of cost) 1 Constraints in 400kV bays extensions at 400
kV Vemagiri S/S 439 75
2 Additional inter-Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765kV link
8570 1457
3 HVDC Bipole link between Western region (Raigarh, Chhattisgarh) and Southern region (Pugalur, Tamil Nadu)
HVDC part(as agreed earlier upto TN and Ker) – Rs. 16402 CroreAC Part (in TN only, as agreed earlier) – Rs.3461 Crore
19862 3376
4 Strengthening of transmission system beyond Vemagiri
7032 1195
5 System Strengthening-XXIV in Southern Region
1010 172
6 Connectivity for Kudankulam 3&4 (2x1000MW) with interstate transmission system.
45 8
7 Erection of 220 kV line to Karaikal 50 9
8 Transmission System for evacuation of power from 2x500 MW Neyveli Lignite Corp. Ltd. TS-I (Replacement) (NNTPS) in Neyveli, Tamil Nadu
15 3
23
Sl.No.
Name of Transmission Scheme Est.Cost
(RsCrore)
Yearly Trans. Charges(YTC)
(Levelized) Rs Crore
(@17% of cost) 9 Connectivity lines for Maheshwaram
(Hyderabad) 765 / 400kV Pooling S/S 396 67
Total (A) 37419 6362
List (ii): Transmission schemes that are under construction by PGCIL
Sl.
No.
Name of Project Cost, in Rs Crore
Yearly Trans. Charges(YTC)
(Levelized) Rs Crore
(@17% of cost)1 Transmission System associated with
KRAISHNAPATNAM UMPP-Part-B. 1927.16
2 Common System associated with East Coast Energy Pvt. Ltd. and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam – Part-A.
1909.24
3 System Strengthening – XVII in Southern Regional Grid
1508.74
4 Common System associated with East Coast Energy Pvt. Ltd. and NCC Power Proj. Ltd. LTOA Gen. Proj. in Srikakulam – Part-C.
514
5 Common System Associated with ISGS Projects in Krishnapatnam area of Andhra Pradesh
1637.34
6 Common System Asociated with Costal Energen Pvt. Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part-B.
1940.13
7 System Strengthening – XIII SR Grid 487.49 8 System Strengthening in SR – XIV 297.33 9 Common System associated with East coast
energy and Private Ltd. and Ind-Barath Powe (Madras) Ltd. (LTOA) Gen. Poj. in Tuticorin area Part-A.
90.44
10 Transmission System Associated with Krishnapatnam UMPP – Par – C1
324.33
11 Common transmission Scheme associated with ISGS Project in Vemagiri Area of Andhra Pradesh – Part – A1
206.44
12 System Strengthening in SR – XVIII 1263.26 13 System Strengthening in SR – XIX 1935.35 14 common transmission scheme associated with
ISGS Projects in Nagapattinum/Cuddalore area of Tamil Nadu
182.8
15 Transmission System Associated with Contingency plan for Evacuation of Power from II&FS (2x600MW)
97.95
16 System Strengthening in SR – XXII 243.53 17 Sub station Extn. Works associated with Trans. 167.4
24
Sl.
No.
Name of Project Cost, in Rs Crore
Yearly Trans. Charges(YTC)
(Levelized) Rs Crore
(@17% of cost)System Required for evacuation of Power from Kudgi TPS (3x800 MW-PhI) of NTPC
18 Trans. System for connectivity for NCC Power Project Ltd.
188.75
19 System Strengthening in SR – XX 288.49 20 Common Transmission Scheme Associated
with ISGS Projects in Nagapattinum/Cuddalore area of Tamil Nadu – Part – A(b)
74.29
21 Sub station works associated with System Strengthening in SR for Import of Power from ER
972.42
Total (B) 16257 2763
List (iii): Transmission schemes that were awarded through TBCB and which are under construction
Sl.No.
Name of Transmission Scheme Est.Cost
(RsCrore)
DiscoveredLevelized YTC
Rs Crore
1 Transmission system associated with IPP’s of Nagapattinam/Cuddalore area – Package ‘A’ (PGCIL)
1025 98.7
2 Raichur – Sholapur line
(Patel Consortium)
440 29.4
3 Vemagiri Package – ‘A’ (PGCIL) 1300 119.7
4 System Strengthening in Southern Region (PGCIL)
1180 231.1
5 Transmission system for evacuation of power from Kudgi TPS (L&T)
1240 179.6
6 Connectivity lines from Maheshwaram
(Bidding is in cess)
396 65
(Indicative only @ 17%)
Total (A) 5581 723
19.5 To have a broad idea of cost impact, following table gives monthly transmission charges(MTC) of Southern Region for the months of March 2014 and January 2015:
25
(all figures are in Rs. Crore) Sl.�No.�
MTC�/�YTC��
Southern�Region�
All�India��
1� Monthly�charges�for�the�month�of�March�2014�
142� �
2� Monthly�charges�for�the�month�of�January�2015�
172� �
� � �3� Approximate�YTC�for�2013�14�
(12x�Monthly�charges�of�March�2014)�1708� �
4� Approximate�YTC�for�2014�15�(12x�Monthly�charges�of�January�2015)�
2059� �
19.6 The additional Yearly Transmission Charges (YTC) on account of the above three lists might be of the order of Rs 9850 crore per annum. Comparing it with the YTC of SR for 2014-15 i.e. about Rs 2050 crore, the YTC for Southern Region may go up to about 11900 crore in next 4-5 years i.e. is a jump of about more than five(5.5) times.
19.7 COO, POSOCO said that along with the increase in transmission charges, the increase in MW deliverable in SR over the ISTS would give the true impact of cost of transmission. He informed that for 2014-15, the quantum of MW over ISTS is of the order of 13000 MW in SR.
19.8 Accordingly, it was observed that if the MW deliverable also increases five (5) times then the cost impact would remain same. During the discussion it was pointed out that the new transmission schemes that have been planned are based on higher reliability criterion, so part of increase in cost of transmission may be attributed to higher reliability criterion also. Director (SP&PA), CEA said that in the absence of GNA (General Network Access) or a similar mechanism, presently, many of the schemes are planned as system strengthening where, the MW deliverable to the states is not known.
20.0 Transmission system for evacuation of power from Ghani/Panyam Solar project (1000 MW) and in Aspiri Wind project (1000 MW) in Andhra Pradesh
20.1 Director(SP&PA), CEA stated that APTRANSCO has informed following transmission systems for new wind (Aspiri-1000 MW) and solar projects Panayam- 1000 MW) coming in the State of Andhra Pradesh by 2017.
Transmission Scheme for Solar Power Park at Ghani/Panyam (1000 MW )
Phase-I Works:
26
1) 400/220kV Substation at Gani/Panyam – 3x500 MVA. 2) 400kV QMDC Line from Kurnool to proposed 400kV Gani/Panyam SS–35
km.3) 400kV Bay Extensions at Kurnool SS – 2 Nos.
Phase-II works :
4) 400kV QMDC Line from Jammalamadugu/ Kondapuram to the proposed 400kV Gani/Panyam SS – 90 kM.
Transmission Evacuation Scheme for 1000MW Wind Power at Aspiri:
1) 400/220kV Substation with 3x315 MVA 2) 400kV QMDC line from Aspiri to 400kV Uravakonda SS.
20.2 Director, APTRANSCO informed that the both the phases at Panyam would be of 500 MW each and are scheduled to be commissioned by March 2017. He also proposed that a + 100 MVAr STATCOM at Panayam would be required which would help in the event of Fault /Low Voltage near the Panyam bus.
20.3 COO, POSOCO asked if APTRANSCO is also planning to connect these projects with nearby 220kV sub-stations for meeting load. APTRANSCO informed that they are planning such connectivity. He also said that the wind machines and the Solar inverters should have LVRT capability and must not depend on grid based equipments like STATCOM etc for this requirement.
20.4 Director(SP&PA),CEA said that if the both phases in Panyam are to be commissioned by March 2017 and only a few months of difference between each phase, the transmission system may be implemented as one scheme. He also enquired whether the Aspiri wind machines and Panyam solar inverters meet the LVRT requirements. He also asked about details of sub-pooling of wind and solar power in Aspiri and Panyam at 220kV and that how they are being connected with the proposed main 400kV Pooling Station(s).
20.5 Director, APTRANSCO said the Aspiri machines would be of Type-3 and thus would meet LVRT requirements. Regarding the inverters at Panyam, he said that tendering for the solar panels and invertor stations are yet to be done and the specifications would be similar to those which NTPC is doing for NPKunta project. He also informed that for Aspiri there are no 220kV S/Ss in the vicinity, however, for Panyam, they would plan to connect with a few of the nearby 220kV S/Ss. He also said that the Panyam phases can be combined for the purpose of transmission infrastructure. Regarding sub-pooling of wind and solar power in Aspiri and Panyam at 220kV, he said that the details are being
27
worked out.
20.6 MS, SRPC suggested to include 2x125 MVAr Bus reactors at Aspiri and Panyam. He also emphasized that these 220kV Pooling Stations at Aspiri and Panyam should have LVRT capability for secure and stable operation of the grid.
20.7 After discussions, following was decided:
(i) Following would be transmission system for evacuation of power from Solar Power Park at Ghani/Panyam (1000 MW ) – to be implemented by APTRANSCO
1) 400/220kV Substation at Gani/Panyam – 3x500 MVA. 2) 400kV QMDC Line from Kurnool to proposed 400kV Gani/Panyam
SS–35 km. 3) 400kV Bay Extensions at Kurnool SS – 2 Nos. 4) 400kV QMDC Line from Jammalamadugu/ Kondapuram to the
proposed 400kV Gani/Panyam SS – 90 km 5) 2x125 MVAr Bus reactors at Panyam
(ii) Following would be transmission system for evacuation of power from Wind projects at Aspiri (1000 MW) – to be implemented by APTRANSCO
1) 400/220kV Substation with 3x315 MVA at Aspiri 2) 400kV QMDC line from Aspiri to 400kV Uravakonda SS 5) 2x125 MVAr Bus reactors at Aspiri
(iii) APTRANSCO would inform CEA the details of 220kV sub-pooling stations within a month, both for the Aspiri and the Panyam projects. They would also inform the connections with nearby 220kV Substations.
(iv) APTRANSCO would submit the studies for the proposed + 100 MVAr STATCOM at Panyam. The studies would consider the alternative locations like Urvakonda and Hindupur S/S which are better connected with the regional grid. They may also consider having a higher rating (the same as planned for STATCOMs in Southern Region for PGCIL under ISTS) for studies.
(v) While planning and implementing the above transmission system APTRANSCO should comply with the regulations of APERC, specially the “Terms and conditions of Open Access Regulations, 2005” of APERC and its amendments from time to time. APTRANSCO would also ensure that they would follow the “Technical standards for connectivity to the grid
28
Regulation 2007” of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission systems.
21.0 Transmission system for evacuation of power from NP Kunta Solar project (1500 MW) in Andhra Pradesh
21.1 PGCIL informed that M/s AP Solar Power Corporation Pvt Ltd (APSPCL) has applied for Connectivity and LTA under the CERC regulation for the 1500 MW N.P.Kunta Solar park. Out of this, 90% is for transmitting to AP DISCOMS and rest 10% to Southern Region as target region.
21.2 They further said that M/s APSPCL has informed that NP Kunta Solar park in distt. Anantpur, AP (1500 MW) is being developed in three phases. First and second phases are being developed with 250 MW and 750 MW capacities and target commissioning schedules are December 2015 and September 2016, respectively. The third phase of balance 500 MW capacity is targeted for December 2016. M/s APSPCL has also indicated that NP Kunta Solar park shall be aggregating power from NP Kunta Site (1000 MW) and Galiveedu Site (500 MW), which are contiguous to each other and both shall be connected to the 220/400kV NP Kunta Pooling Station for further dispersal of power. It was also clarified that total six (6) nos. 250 MW blocks (sub-pools) are proposed to be interconnected to 220/400 kV NP Kunta Pooling station through a 220kV D/C zebra transmission line from each sub-pooling station.
21.3 PGCIL also informed that APSPCL who is developing this solar park has entrusted the development of generation projects in Phase I and Phase II of 1000 MW in NPKunta Solar Park to M/s NTPC.
21.4 M/s NTPC informed that they have issued tenders for 250 MW for which price bid have also been opened. For additional 500 MW block also they had issued tenders recently. NTPC also confirmed that they shall abide by the present regulation regarding Technical standards for connectivity to Grid regulation.
21.5 Regarding STATCOM, POWERGRID said that the identified 400kV STATCOM at NP Kunta pooling station shall not only provide Grid Support but also help in voltage ride through support to solar generation. In addition, as NP Kunta is proposed to be connected to 400kV Hindupur, a major wind complex interconnected with other Wind generation pockets in Andhra Pradesh, this STATCOM shall also extend voltage support to generation projects in the event of contingency scenarios. The issue of placement of STATCOM at 220kV or 400kV NP Kunta Pooling Station was also deliberated. POWERGRID
29
clarified that as STATCOM is primarily identified to provide Grid Support, its effectiveness at 400kV shall be more w.r.t its placement at 220kV. On CEA query, POWERGRID confirmed that other proposed STATCOMS in Southern region viz. at 400 kV Udumalpet, Trichy and Hyderabad have been taken into consideration in studies.
21.6 PGCIL proposed following transmission system for NP Kunta ultra mega solar power park (1500 MW) in three phases.
Phase-I (250 MW)a. Establishment of 3x500 MVA, 400/220KV Substation at NP Kunta
Pooling Station b. LILO of 400KV Kadapa(Cuddapah) - Kolar S/c line at NP Kunta Pooling
Stationc. 2 nos. 220kV line bays at NP Kunta Pooling Station d. 1x125 MVAR Bus Reactor at NP Kunta Pooling Station e. ±100 MVAR STATCOM at 400kV NP Kunta Pooling Station
Estimated Cost – Rs 320 Cr
Phase-II (750 MW)a. LILO of Kadapa(Cuddapah) – Hindupur 400kV D/c (Quad) line at NP
Kunta Pooling Station b. 6 nos. 220kV line bays at NP Kunta Pooling Station
Estimated Cost – Rs 185 Cr
Phase-III(500 MW)a. Augmentation of transformation capacity at NP Kunta station with 4th,
1x500 MVA, 400/220kV transformer b. 4 nos. 220kV line bays at NP Kunta Pooling Station
Estimated Cost – Rs 40 Cr
21.7 Director(SP&PA),CEA said that if these phases in NPKunta are to be commissioned by December 2016 and only a few months of difference between each of the phases, the transmission system may be implemented as one scheme. He also said that, the proposed STATCOM, if required, may be shifted to phase-II. PGCIL said that they would prefer to order the complete transmission system for all the three stages together but with different delivery schedules matching with each phase. The delivery of STATCOM also can be matched with phase-II.
21.8 During discussions it was observed that the present CEA connectivity standards have do not have provision for LVRT compliance for solar power generations. The amendments in CEA technical standards may take one to two years. As being projected, a number of solar power plants/parks may be
30
implemented within 2 years, therefore, it was suggested that the solar projects coming in this intervening period may have STATCOM at each of their pooling or sub-pooling stations. It was also observed that merit of a ±20 MVAr or similar rating of STATCOM at each of six 220kV sub-pooling stations in the NP Kunta solar park may be evaluated in place of a single ±100 MVAr STATCOM at 400kV level because it being close to the generation inverters.
21.9 CEO, POSOCO stated that each inverter should be treated as a separate generating unit and it is the LVRT characteristic of the inverter which will hold the machine/generator and not STATCOM at 400kV level, as suggested in the evacuation system of N P Kunta. CEA added that if the STATCOMs are being proposed for grid support, as stated by PGCIL, we need to plan next set of STATCOMs (or combination of MSC and STATCOM) in the all-India grid, considering the new enhanced plans of wind and solar additions. CEA also requested PGCIL to submit status of implementation of the STATCOMs that have already been planned and urged them to speed up implementation of STATCOMs planned in September 2013 at Hyderabad, Udumalpet and Trichy for Southern Region grid.
21.10 NTPC replied that they are following German Technical guidelines, for the development the NP Kunta generation project. They also furnished copies of the German technical guidelines and relevant extract of the specifications (Annex-II) that they have requested in the tendering for N P Kunta project. As such NTPC stated that the NPKunta inverters would have LVRT capabilities. After discussions, it was noted that there should be a mechanism to test LVRT capabilities, as stated by Solar generation developers or wind developers.
21.11 KSEBL sought clarification on the cost sharing of the new system being proposed as ISTS. The solar energy was exempted from payment of transmission charges and losses vide CERC regulation from 2011. Hon. CERC vide order dated 2.3.2015 in Petition No 3/SM/2015 stated that the Commission is in the process of finalizing the issue of exemption vide third amendment to the regulation and till then the present exemption could continue. The exemption from sharing of transmission charges and losses by solar generators is based on the CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010 which was notified on 15th June 2010 and came into effect from 01-07-2011. The status of solar energy industry has seen sea changes during this intervening period. KSEBL apprehended that the impact of the proposed schemes like that of NP Kunta UMSP with huge capacity of 1500 MW on the transmission charges of users of ISTS could be appreciable if the developer is continued to be exempted from paying the transmission charges. KSEB wanted to place on record the concerns in the
31
matter of exempting the transmission charges of solar evacuation especially when the installed capacity is at par with conventional generating stations. Further KSEBL supported the suggestion of CEO POSOCO to have the evacuation possibilities at 220kV level during the initial phase
21.12 Director (SP&PA), CEA asked whether the 220kV substations and transmission lines within N P Kunta Solar Park are being implemented by APTRANSCO or APSPCL. The LTA and connectivity application indicates that these works are being implemented by APTRANSCO.
21.13 APTRANSCO clarified that the internal transmission system at 220kV level is being carried out by them on deposit work basis from M/s APSPCL.
21.14 Director (SP&PA), CEA further enquired whether APSPCL is a transmission licensee in AP who is implementing these transmission works or whether they would be implementing these 220kV transmission systems as ‘dedicted transmission line’ in the capacity of a generator. He also enquired about eligibility of APSPCL to apply for connectivity and LTA with respect to the CERC regulations. He also enquired whether a PPA has been made with the AP DISCOMs for the 90% of the Capacity as given in the LTA application.
21.15 PGCIL clarified that till date they have not received PPA information from the applicant i.e. APSPCL. So, practically, the 90% part of the applied LTA is also a target State (to AP). APTRANSCO said that the PPA may be signed either by the APSPCL or by the generation developer e.g. NTPC in case of phase-I and II. Accordingly, it was observed that whether the LTA, in this case, should be applied by NTPC, or by APSPCL.
21.16 Regarding eligibility of APSPCL to seek ‘Connectivity’ or ‘LTA’, it was decided that CTU would approach CERC in this matter.
21.17 An issue of multiple injections at the 400kV S/S of PGCIL by the APSPCL was also raised, as in the ‘LTA’ application of CERC, more than one injection is allowed only for Drawl and not for Injection. In case of NPKunta, multiple injections are being proposed (six number of injections at the proposed 220/400kV S/S). On this issue also, it was decided that CTU would approach CERC.
21.18 COO, POSOCO asked if APTRANSCO is also planning to connect the 220kV sub-pooling stations with their nearby 220kV sub-stations for meeting load. He opined that as the solar power would not be available after evening, the 400kV S/s and the 220kV infrastructure in the park can meet loads in the local area. Also, if there is some disruption in the 400kV network, these 220kV interconnections can meet local loads. APTRANSCO informed that they are
32
planning such connectivity.
21.19 In regard to above, following extracts of the MNRE letter are worth considering:
As per Implementation scheme for Development of Solar Parks and Ultra Mega Solar Power Projects in the country commencing from 2014-15 and onwards (i.e. from the year 2014 – 15 to 2018 – 19) issued by the Government (MNRE) vide their letter No. 30/26/2014-15/NSM dated 12-Dec-2014, the following are mentioned:
“The Implementing Agency will also be entrusted with providing the following facilities to the solar project developers:
vii. Transmission facility consisting pooling station (with 400/220, 220/66 KV switchyard and respective transformers) to allow connection of individual projects with pooling station through a network of underground cables or overhead lines.”
“8. Transmission and evacuation of power from solar park
Interconnection of each plot with pooling stations through 66 KV /other suitable voltage underground or overhead cable will be the responsibility of the solar project developer.
The designated nodal agency will set up the pooling stations (with 400/220, 220/66 kV or as may be suitable switchyard and respective transformers) inside the solar park and will also draw transmission to transmit power to 220 kV/400 kV sub-station.
The responsibility of setting up a sub-station nearby the solar park to take power from one or more pooling stations will lie with the Central Transmission Utility (CTU) or the State Transmission Utility (STU), after following necessary technical and commercial procedures as stipulated in the various regulations notified by the Central/State Commission.
If the State Government is willing to buy over 50% of the power generated in the solar park, preference will be given to STU, which will ensure setting up of sub-station and development of necessary infrastructure for transmission of power from substation to load centres.
The designated implementing agency will intimate POWERGRID and CEA at least 6 months before so that the planning and execution can be carried out in time.
If the state is not willing to buy at least 50% of the power generated in the solar park, then CTU may be entrusted with the responsibility of setting up 400 KV or bigger sub-station right next to the solar park and its connectivity with the CTU.”
21.20 In this regard, as per letter no. 11/64/2014-PG dated 08-01-2015 of Ministry of Power regarding implementation of work related to transmission system for evacuation of power from 9 Solar Parks with a total capacity of 7020 MW being set up in seven states viz. Gujarat, Madhya Pradesh, Andhra Pradesh, Karnataka, UP, Meghalaya and Rajasthan, following has been stated:
33
“(i) The transmission line connecting solar parks to ISTS be declared as part of ISTS. (ii) PGCIL is assigned to take up construction of transmission lines including pooling stations from the solar generating parks on compressed time schedule basis.”
21.21 In view of above discussions it was agreed that though the proposed scheme is technically in order, however, it can be firmed up subject to resolving the regulatory issues. Regarding the proposed STATCOM at N P Kunta the same was agreed due to urgency in the matter as a special case, however, its delivery would be along with Phase-II of the project. Regarding the regulatory aspects, CTU would get clarification on - (i) eligibility for LTA, Connectivity, (ii)the issue of Multiple Injections, (iii) whether the proposed 400/220kV S/s which is in the premises of the solar park should be under scope of park developer or in STU/CTU, and (iv) whether LTA should be applied by actual generation developers who may sign PPA with AP DISCOMs or the APSPCL.
It was also decided that APTRANSCO would study planning of connecting its nearby 220kV S/S with the 220kV sub-pooling stations in NP Kunta Park.
CTU would carry out studies with CEA and respective STUs for finding optimum size and location of other STATCOMs in Southern Region that would provide grid support in view of upcoming wind and solar projects.
22.0 Modification for the System Strengthening-XXIV in Southern Region – GIS for Cuddapah 765kV S/s
22.1 Director(SP&PA), CEA stated that during 37th Standing Committee Meeting in SR held on 31/07/2014 System Strengthening-XXIV in Southern Region was agreed which covered: (i) Establishment of 765/400kV substation at Cuddapah with 2x1500 MVA transformers and 2x240 MVAr bus reactors.(ii) LILO of Kurnool-Thiruvalam 765 kV D/c at Cuddapah along with associated bays and (iii) Cuddapah-Hindupur 400 kV (Quad) D/C line along with associated bays and 80 MVAr switchable line reactor at Hindupur.
22.2 COO(CTU), PGCIL stated that the new 765/400KV substation at Cuddapah is proposed to be established in the land available adjacent to the existing substation. Keeping in view the requirement of 765kV and 400kV under present scope of work, it is not possible to accommodate these works as AIS in the available land. Acquisition of new land for Cuddapah Substation with the above scope of work would take considerable time. Keeping in view the
34
system requirement above works are to be implemented under compressed time schedule, therefore POWERGRID proposed that the new Cuddapah765/400kV S/s may be implemented as GIS type in the land available adjacent to the existing 400/220kV Cuddapah substation.
22.3 PGCIL informed that at Cuddapah the total land area is 106 Acres(existing 50 Acres and vacant 56acres). The additional land required for building AIS type would be 70acres and if it is built as GIS 50 acres more would be required. The difference in cost of establishing AIS and GIS would be Rs 50 crore only.
22.4 The matter was discussed and it was agreed that POWERGRID would implement the 765kV part as GIS and the augmentation of 400kV part as AIS for the Cuddapah765/400kV S/s.
23.0 ATS Tuticorin JV (2x500 MW) TPS of M/s NTPL
23.1 Director, CEA stated for power evacuation from the Tuticorin JV TPS, a 400 kV Tuticorin JV TPS – Chekkanurani (Madurai) D/C Quad line with 2 x 315 MVA, 400 kV/220 kV ICT at Tuticorin JV TPS had been agreed. Accordingly, M/s. PGCIL has erected 2 nos. of 400kV NTPL - Madurai DC Quad feeder lines. For evacuation of power from Coastal Energen, LILO of one circuit of the NTPL – Madurai D/C line was agreed as an interim arrangement.
23.2 Further, as per NTPL’s letter M/s. PGCIL is scheduled to commission 400kV system of its 400kV/765kV pooling station at Ettayapuram, near Tuticorin shortly with 4 nos. of 400 KV bays. The existing 400kV NTPL – Madurai and 400kV Coastal Energen – Madurai feeders will be shifted to pooling station. However, the 400kV tie between NTPL and M/s Coastal Energen would continue. So, with only 2 nos. of 400kV Ettayapuram PS – Madurai feeders being available, stability of power evacuation system of NTPL would be of concern.
23.3 PGCIL informed that as per the agreed scope of power evacuation system of Costal Energen is to construct a 400kV Quad D/C line from its switchyard to Tuticorin Pooling Station. As an interim arrangement, this line has been part completed by making LILO of one circuit of the NTPL – Madurai D/C line. After commissioning of the Costal Energen - Tuticorin P.S. 400kV Quad D/C line, the NTPL – Madurai/ Tuticorin Pooling Station D/C line would be restored.
23.4 Accordingly, the NTPL apprehension regarding the tie line between NTPL – Coastal Energen line, it was clarified that this tie line would be disconnected after commissioning of Costal Energen - Tuticorin P.S. 400kV Quad D/C line.
35
24.0 Change in SCCL Evacuation scheme:
24.1 Director(SP&PA),CEA said that M/s TSTRANSCO (Transmission Corporation of Telangana Limited) had proposed that SCCL – Nirmal 400 kV D/c line which was planned as evacuation system for 2x600 MW of SCCL, may be planned as Quad Moose line instead of Twin Moose line for evacuation of power from 3rd unit of 1x600 MW at the Singareni TPS at Jaipur location near Nirmal in Telangana.
24.2 The proposal was discussed and it was felt that to evacuate power from SCCL having total capacity of 1800 MW and meeting the reliability requirements as per the Transmission Planning Criteria, detailed system studies are needed.
24.3 To go ahead, the SCCL –Nirmal 400 kV Twin Moose D/C line may be planned as Quad D/C instead of Twin as envisaged earlier.
24.4 Additional transmissions system strengthening beyond Gajwel and Nirmal may be needed. Thus the transmission system for evacuation of power from the 3rd
unit may be firmed up only after the detailed studies.
24.5 TSTRANSCO agreed to carry out the required studies and bring the matter in the next meeting of Standing Committee.
24.6 CEA urged that TSTRANSCO should comply with the regulations of Telangana State Electricity Regulator Commission and the regulations of APERC as applicable to them in accordance with TSERC (adoption Regulation 2014) i.e of Regulation no. 1 of 2014 while planning and implementing the above transmission system. Especially, they should comply with the “Terms and conditions of Open Access Regulations, 2005” of APERC and its amendments from time to time. TSTRANSCO would also ensure that they would follow the “Technical standards for connectivity to the grid Regulation 2007 of Central Electricity Authority and its amendments from time to time while planning and implementing the above transmission system.
25.0 Additional Agenda from PGCIL - following was decided:
25.1 Procurement of ERS substation: It was decided that PGCIL would discuss this issue with CEA and thereafter, the matter would be taken up in next meeting.
25.2 Converting Fixed Line Reactors into Switchable Line Reactors in Over Compensated lines: This item has already been covered earlier in the Minutes.
25.3 Replacement of 50 MVAr bus reactor with 125 MVAr at Mysore: This
36
matter would be re-discussed in the next meeting of this committee.
25.4 Procurement of 500 MVA ICT as spare instead of 315 MVA ICT approved under Ramagundum Transmission System, and Procurement of 3 NOS. 125 MVAr reactors instead of 3 NOS. 50 MVAr Reactors approved under Ramagundum Transmission System: This matter would be re-discussed in the next meeting of this committee.
26.0 Modifications in the scope of Raigarh – Pugalur – Kerala 6000 MW HVDC transmission system
In the meeting, it was noted that PGCIL has proposed modifications in the scope of the Raigarh – Pugalur - North Trichur 6000 MW HVDC system. The change in scope mainly is having a set of 2000 MW HVDC terminals at Pugalur and North Trichur in addition to the set of 6000 MW terminals at Raigarh and Pugalur. Also, the Pugalur – N.Trichur terminals have been proposed to be built using VSC based technology instead of the earlier conventional HVDC technology. The part of the Pugalur – N. Trichur is proposed to be built using DC cables. It was decided that PGCIL would provide detailed note on this modification along with documents on the new VSC technology.
37
Annex-I
List of participants for the 38th Standing Committee on Power System Planning in Southern Region held on 07-03-2015 at NRPC Office, Katwaria Sarai, New Delhi
Sl. No. Name and Organization Designation
Central Electricity Authority (CEA)
1. Major Singh Chairperson (I/c) and Member (PS) 2. K K Arya Chief Engineer(SP&PA) 3. Pardeep Jindal Director (SP&PA) 5. Manjari Chaturvedi Deputy Director (SP&PA) 6. Shivani Sharma Deputy Director (SP&PA)
Southern Region Power Committee (SRPC)
1. S.R.Bhat Member Secretary 2. Anil Thomas EE
Power Grid Corporation of India Ltd (PGCIL)
1. Seema Gupta COO-CTU 2. Y K Sehgal ED 3. Rakesh Prasad GM(Commercial) 4. Subir Sen GM(STF-SG) 5. Mukesh Khanna AGM(CTU-Plg.) 6. B. B. Mukherjee DGM 7. Anil Kumar Meena DCDE(SG) 8. Kashish Bhambhani Manager(SS) 9. Ankita Singh Sr. Engineer(CTU-Plg.)
10. G. Venkatesh Engineer(CTU-Plg.)
Power System Operation Corp. Ltd (POSOCO)
1. S K. Sonee CEO 2. S. R. Narasimhan AGM(SytemOp) (NLDC) 3. N Nallarasan DGM (SO)NLDC
38
Sl. No. Name and Organization Designation
4. S.P. Kumar DGM(SRLDC) 5. G Madhukar Dy. Manager(SRLDC)
National Thermal Power Corp. (NTPC)
1. Sagarika Mohanty AGM AGM2. Vinod Kumar Jain DGM(Commercial) 3. Vinay Garg Sr. Manager(Commercial) 4. Abhishek Khanna Dy. Manager
Transmission Corp. of Andhra Pradesh Ltd. (APTRANSCO)
1. S. Subramanyan Director (Projects) 2. K. Surendra Babu CE/IPC&PS 3. C H V S Subbarao SE/PS 4. B. Srinivasa Rao DE/System Studies 5. Y V Ramakrishna ADE/System Studies
Karnataka Power Transmission Corp. Ltd. (KPTCL)
1. S Sumanth Director(Transmission) 2. A J Hosamani CEE (P&C)
Kerala State Electricity Board (KSEB limited)
1. K Venugopal Director(T&SO) 2. S R Anand EE 3. S S Biju AEE/PSE
Tamil Nadu Electricity Board (TNEB)/Tamil Nadu Transco1. S Ravichandran SE/System Studies(TANGEDCO) 2. R Santhana Kumar EE/System Studies(TANGEDCO) 3. R Kumuda AEE/System Studies(TANGEDCO)
TSTRANSCO
39
Sl. No. Name and Organization Designation
1. T Jagat Reddy Director(GTM) 2. K Ashok DE/SS 3. M Sheshagiri ADE/SS
Electricity Department, Puducherry
1. K Mathivanan SE 2. R Murali EE
��������� � ��� ������������������
�������������������������������������������������������� ���� �����������������
������������� !!���"�# ������� �$%&�#�'(�"�)
��������������*�����
�'+�,� �'-./0/'-/-�� �-/0� ������ 1233� 4'-1/10� '(� /-5�,0�,� 3'-�� +/02�11'4/0�.� 4'-0,'3� 6� 7,'0�40/'-8� (/30�,/-�8�9�1:,/-�� /-10,:9�-01�-.� .0�3'��/-��.�5/4�1��2������1233�;��.�1/�-�.�0'�1:773<�02��02,���721�����7'+�,�0'�02���,/.�4'-(',9/-��0'�02��,�=:/,�9�-0�'(� ��������8��������>�',� �=:/53�-0� 10-.,.� ��2�� 7'+�,� 4'-./0/'-/-�� :-/0� 1233� ;�� 47;3�� 0'�.?:10� 02�� ':07:0� 5'30���6� (,�=:�-4<� 0'�1:/0� 02���,/.� 4'-./0/'-��0/-�� '(��42�����1233�-'0�;��3�11�02-�����@���-.�02��4'9;/-�.�@���,0/-��'(�33� ���1� 1233� -'0� ;�� 3�11� 02-� ������ @��� 0� 9A/9:9� '7�,0/-��0�97�,0:,���-3<�/-.'',�0<7������1233�;��44�70�.�
!��� � �����������������
�������� �2'0'5'30/4� ����� 1<10�91� �� �2,40�,/10/41� '(� 02��:0/3/0<�/-0�,(4��
������>B� �2'0'5'30/4�1<10�9�,'4�.:,��(',�9�1:,/-���((/4/�-4<�
��������� �9/11/'-C� 99:-/0<�,�=:/,�9�-0��,9'-/41 �������� ��4'99�-.�.� �,40/4�1� -.� ��=:/,�9�-01� (',�
�,9'-/4��'-0,'3�/-��3�40,/43��'+�,��<10�91� �������>� �-5/,'-9�-03���10/-�� ��������� �0/3/0<�/-0�,4'--�40�.� 72'0'5'30/4� /-5�,0�,1� �� ��10�
7,'4�.:,��'(�/13-./-��7,�5�-0/'-�9�1:,�1� ��������� �(�0<� '(� 7'+�,� 4'-5�,0�,1� (',� :1�� /-� 72'0'5'30/4�
7'+�,�1<10�91�����B�B�� �5�,33� �((/4/�-4<� '(� �,/.� 4'--�40�.� 72'0'5'30/4�
/-5�,0�,1��������>� ��42-/43� :/.�3/-�1� (',� �-�,0/-�� 73-0� 4'--�40�.�
0'�!�./:9�5'30���-�0+',D�
���� � *��������E���������
�� ����9:10� 25�� 7,'5/1/'-� 0'� ;�� /1'30�.� (,'9��,/.� 02,':�2��/,��/,4:/0��,�D�,1�+2/42�1233�;��/-;:/30�+/02�02��/-5�,0�,�',�1�7,0��10-.3'-��7-�3�
�� ����1233�4'-(/,9�0'� ���������',��=:/53�-0�/-0�,-0/'-3�10-.,.�(',�4'973/-4�� 0'� ,�=:/,�9�-01� (',� �3�40,'9�-�0/4� 4'970/;/3/0<� -.� 0'� ������>��� ',� �=:/53�-0� /-0�,-0/'-3� 10-.,.� (',� ,�=:/,�9�-0� '(��-5/,'-9�-03�0�10/-��
��������>� ��42-/43� :/.�3/-�1� (',� �-�,0/-�� 73-0� 4'--�40�.0'�!�./:9�5'30���-�0+',D�
�������>�
��������� � ��� ������������������
�������������������������������������������������������� ���� �����������������
������������� !!���"�# ������� �$%&"��'(�"�)
B� �2�� 9/-/9:9��:,'� �((/4/�-4<� '(� 02������1� 7�,� ������>B� 1233� ;����F� �2�� ;/..�,� 1233� 17�4/(<� 02�� 4'-5�,1/'-� �((/4/�-4<� 0� ('33'+/-��3'.� 4'-./0/'-1� /�� ��F8� ��F8� ��F� -.� ���F� .:,/-�� .�0/3��-�/-��,/-�8�+2/42�1233�;��4'-(/,9�.�;<�0<7��0�10�,�7',01�
#� �2������ 1233� ,�9/-� 4'--�40�.� 0'� 02�� �,/.� 1� 7�,� -./-� 0�42-/43�10-.,.1�(',�4'--�40/5/0<�0'��,/.������+/02�33�30�10�9�-.9�-01�-.�/01�4'97'-�-01�1233�;��.�1/�-�.�44',./-�3<��
�� �2������1233�25��7,'0�40/'-��/-10�-<�1:10/-�.�(:30�/-�02��(��.�,�3/-��-.��/-10�3/�20-/-��./142,���/-�02��(��.�,�3/-��
�� �2�� ���� 1233� 31'� 25�� 02�� .�=:0�� 7,'0�40/'-� �/-10� �,02�3�D���(:301�
�� �2�� /-4'9/-����� (��.�,�'(�����1233�25��1:/0;3<�,0�.� /1'30',1� 0'�33'+� 1(�� 10,0� :7� -.� 12:0� .'+-� '(� 02�� 1<10�9� -.� /01� 0�,9/-31�12':3.� ;�� 12,':.�.� �2����� (��.�,� 1233� 0�,9/-0�� /-� 02�� (:1�� ;'A�02,':�2��1:/0;3��(:1��,0/-���2������(:1��;'A�1233�25��'-��17,��0�,9/-3� +/02� (:1�� -.� 2'3.�,� (',� 02�� (:0:,�� :1�� �2�� 4'--�40/'-�;�0+��-� 02�� (:1�� ;'A�-.� /-5�,0�,� 1233� ;�� 02,':�2� 4'77�,� ;:1� ;,1�'-3<
>� -0�,-3��:,����,'0�40/'-���5/4�� ������1233� ;�� 7,'5/.�.� /-� 02������'-����-.����1/.�� 0�1233�4'-1/10�'(�!�03��A/.���,/10�,��!����0<7��,,�10',1��2��./142,���47;/3/0<�'(�02������1233�;��0�3�10���D��0�>C���9/4,'�1�4'-.�+5��1�7�,� ������#B�����:,/-���,02�(:30�-.�(/3:,�� '(�!��8� 02������ 1233� 1(�3<� ./14'--�40� 02�� 2�302<� 1<10�9����� 1233� 25�� 02�,93� ./14'--�40',� 0'� /-0�,,:70� 02�� 1:,��� 4:,,�-0�,/1/-�� (,'9� /-0�,-3� -.� �A0�,-3� (:301� -� ',.�,� 0'� 5'/.� 02�� (/,��2G,.� .:�� 0'� 7'11/;3�� ��� ,4/-�� /-� 02�� ���� .:�� 0'� '7�,0/'-� '(�02�,93�./14'--�40',8�02������1233��A0/-�:/12�02��,4��
�� �2������ 12':3.� ;�� .�1/�-�.� (',� 7,33�3� '7�,0/'-� 02,':�2� �35-/4�/1'30/'-� �'3/.� 100�� �3�40,'-/4� .�5/4�1� 1233� ;�� 7,'0�40�.� 0'� �-1:,��19''02�(:-40/'-/-��1�+�33�1��-1:,��3'-��3/(��'(�02��/-5�,0�,�
����2�� ���� 1233� 25�� -0/�/13-./-�� 7,'0�40/'-� 1� 7�,� ��� ������ ',��=:/53�-0�/-0�,-0/'-3�10-.,.
��� -41��'(��,/.�(/3:,�8�02������1233�;��,��1<-42,'-/G�.�+/02��,/.�(0�,�,�5/53�'(�7'+�,�1:773<���-.',�0'�(:,-/12�02��0/9��0D�-�;<�����0'�;���,��1<-42,'-/G�.� (0�,� ,�10',0/'-� '(� �,/.� 1:773<� .:,/-�� .�0/3�.��-�/-��,/-�
The PCU shall remain connected to the grid as per Central Electricity AuthorityTechnical (standards for connectivity to the grid) regulation 2007 with all latestamendments and its components shall be designed accordingly.
as per Central Electricity Authoritygrid per ElectrTechnical (standards for connectivity to the grid) regulation 2007 all latest
Authority
amendmentswith
ctricitylectr007 ith
ity
Technical Guideline „Generating plants connected to the medium-voltage network“
© BDEW, June 2008 page 21/130
2.5.1.1 Steady-state voltage control
Steady-state voltage control means voltage control within the medium-voltage network un-
der normal operating conditions, where slow voltage changes in the distribution network are
kept within acceptable limits.
If required by the network operator and to meet network requirements, generating plants
must participate in steady-state voltage control within the medium-voltage network.
2.5.1.2 Dynamic network support
Dynamic network support means voltage control in the event of voltage drops within the
high and extra-high voltage network with a view to avoiding unintentional disconnections of
large feed-in power, and thus network collapse.
In the light of the strong increase in the number of generating plants to be connected to the
medium-voltage network, the integration of these plants into the dynamic network support
scheme is becoming ever more important. Consequently, these generating plants must gen-
erally participate in dynamic network support even if this is not required by the network op-
erator at the time of the plant’s connection to the network. That means that generating
plants must be able in technical terms
not to disconnect from the network in the event of network faults,
to support the network voltage during a network fault by feeding a reactive current
into the network,
not to extract from the medium-voltage network after fault clearance more inductive
reactive power than prior to the occurrence of the fault.
These requirements apply to all types of short circuits (i.e. to single-phase, two-phase and
three-phase short circuits).
Just like in the Transmission Code 20077, a distinction is made in these guidelines between
type-1 and type-2 generating plants with regard to their behaviour in the event of network
disturbances. A type-1 generating unit exists if a synchronous generator is directly (only
through the generator transformer) connected to the network. All other plants are type-2
generating units.
6 „Tonfrequenz-Rundsteuerung, Empfehlung zur Vermeidung unzulässiger Rückwirkun-gen“, 3rd edition 1997, published by VDEW 7 TransmissionCode 2007 „Network and System Rules of the German Transmission System Operators“, August 2007, published by VDN
Technical Guideline „Generating plants connected to the medium-voltage network“
© BDEW, June 2008 page 22/130
Concerning type-1 plants, the Transmission Code 2007 is put more precisely in the following
respect:
If the voltage drops at values above the red border line in figure 2.5.1.2-1, generating
plans must not be disconnected from the network.
0 150 1.500
100%
70%
Zeit in ms
Zeitpunkt eines Störungseintritts
700
unterer Wert desSpannungsbandes
3.000
15%
45%
Grenzkurve Spannungsverlauf
U/Uc
Figure 2.5.1.2-1: Borderline of the voltage profile at the network connection
point of a type-1 generating plant
The following conditions shall apply to type-2 generating plants, taking the Transmission
Code 2007, Section 3.3.13.5, into account:
Generating units must not disconnect from the network in the event of voltage drops
to 0 % Uc of a duration of 150 ms.
Below the blue line shown in Figure 2.5.1.2-2, there are no requirements saying that
generating plants have to remain connected to the network.
Technical Guideline „Generating plants connected to the medium-voltage network“
© BDEW, June 2008 page 23/130
0 150 1.500
100%
70%
Zeit in ms
Zeitpunkt eines Störungseintritts
700
unterer Wert desSpannungsbandes= 90% von Uc
3.000
15%
45%
Grenzlinie 1Grenzlinie 2
Unterhalb der blauen Kennlinie bestehen keine Anforderungen hinsichtlich des Verbleibens am Netz.
30%
Grenzkurven Spannungsverlauf
U/Uc
Figure 2.5.1.2-2 Borderlines of the voltage profile of a type-2 generating plant at
the network connection point
Note: U means the lowest value of the three line-to-line voltages
Voltage drops with values above the borderline 1 must not lead to instability or to the dis-
connection of the generating plant from the network (TC2007; 3.3.13.5, section 13; ex-
tended to asymmetrical voltage drops).
If the voltage drops at values above the borderline 2 and below the borderline 1, generating
units shall pass through the fault without disconnecting from the network. Feed-in of a
short-circuit current during that time is to be agreed with the network operator. In consul-
tation with the network operator, it is permissible to shift the borderline 2 if the generating
plant’s connection concept requires to do so. Also in consultation with the network operator,
a short-time disconnection from the network is permissible if the generating plant can be
resynchronized 2 seconds, at the latest, after the beginning of the short-time disconnection.
After resynchronization, the active power must be increased with a gradient of at least
10% of the nominal capacity per second (TC2007; 3.3.13.5, section 14).
Below the borderline 2, a short-time disconnection of the generating plant may be carried
out in any case. Prolonged resynchronization times and lower gradients of the active power
Technical Guideline „Generating plants connected to the medium-voltage network“
© BDEW, June 2008 page 24/130
increase after resynchronization as compared to those admissible above the borderline 2 are
permitted if they are agreed with the network operator (TC2007, 3.3.13.5, section 15).
The behaviour of type-2 generating plants in the case of automatic re-closure is described
more precisely in Annex B.3.
Depending on the concrete technical network conditions, the actual duration of the generat-
ing facility’s connection to the medium-voltage network can be reduced by requirements of
the network operator in terms of protection equipment.
For all generating plants, the rule shall apply that a current according to the Transmission
Code 2007 is to be supplied to the network for the duration of a symmetrical fault. Concern-
ing unsymmetrical faults, it is not permissible that during the duration of the fault reactive
currents be fed into the network which give rise to voltages higher than 1,1 Uc in non-faulty
phases at the network connection point.
As a matter of principle, the requirements in terms of dynamic network support apply to all
facilities irrespective of their type and connection variant. They shall be implemented
through setting of the generating plants’ or units’ control equipment.
The network operator shall determine the extent to which generating plants must partici-
pate in dynamic network support. A distinction is made between connections
directly via a separate circuit breaker bay to the bus-bar of a transforming station and
in the system operator’s medium-voltage network.
A general basic requirement is however that all generating plants remain connected to the
network in the case of voltage drops above the borderline in figure 2.5.1.2-1 or the border-
line in figure 2.5.1.2-1. Consequently, the network operator only determines whether or to
which extent a reactive current is to be supplied to the network by the generating facility in
the event of voltage drops.
Customer plants with generating plants turning into isolated operation in the event of dis-
turbances in the higher-voltage network to cover the customer’s own energy demand must
participate in network support until they are disconnected from the system operator’s me-
dium-voltage network. Isolated operation scheduled by the customer has to be agreed by
contract with the network operator.
Annexure –IX (Reserve Shut Down - PPT)
<10 Pages>
Rese
rve
Shut
D
own
SRPC
, Sec
reta
riat
Rese
rve
Shut
Dow
n-(R
SD)
�It
ma
y be
eco
nom
ica
l to
shut
dow
n un
it(s)
if t
otal
an
ticip
ated
URS
of
the
regi
on is
mor
e th
an t
he e
x-bu
s in
stal
led
cap
acity
of
an U
nit
or m
ultip
le u
nits
w
ith in
the
regi
on ,
prov
ided
dur
atio
n of
such
surp
lus
is m
ore
than
the
min
imum
tim
e pe
riod
req
uire
d f
or
econ
omic
al s
hut
dow
n st
art
up o
pera
tion
of t
he
unit(
s).
�Th
e Un
it(s)
sel
ecte
d s
hall
be s
uch
that
it s
houl
d n
ot
impa
ct t
he d
raw
al s
ched
ule
of a
ny b
enef
icia
ry
afte
r ta
king
into
RSD
. If
Dra
wal
sch
edul
e is
getti
ng
affe
cted
con
curre
nce
of t
he a
ffect
ed u
tility
nee
d
to b
e ta
ken
�Th
e Un
it(s)
w
ith
max
imum
va
riabl
e ch
arge
an
d
satis
fyin
g a
bove
crit
eria
ca
n be
sele
cted
for R
SD.
Requ
irem
ents
�
Ad
vanc
e as
sess
men
t of U
RS b
y th
e be
nefic
iarie
s. �
Intim
atio
n fo
r RSD
Pros
and
Con
s �
Man
agin
g Hu
ge V
aria
tion
Bet
wee
n M
axim
um a
nd
Min
imum
URS
. �
High
URS
dur
ing
Nig
ht (
Up t
o 20
00 M
W)
Hour
s an
d
Virt
ually
no
URS
dur
ing
Peak
Hou
rs.
�A
vera
ge U
RS g
reat
er t
han
200
MW
ava
ilabl
e fo
r C
ontin
uous
3 d
ays
�In
Wes
tern
Reg
ion
Min
imum
per
iod
requ
ired
for R
SD is
3
Da
ys.
�Lo
ad m
anag
emen
t to
be d
one
dur
ing
peak
Hou
rs.
�Tr
ade
off
Betw
een
Econ
omic
s V
s O
pera
tiona
l C
onst
rain
t/Fl
exib
ility.
MW
M
W
MW
22-O
ct-1
4- to
24-
Oct
-14
507
657
1573
25-O
ct-1
4- to
27-
Oct
-14
85
556
1262
Min
URS
A
vg. U
RS
Max
URS
� 2
6 Sl
ots o
f con
tinuo
us th
ree
Day
s whe
n av
erag
e
URS
wa
s mor
e th
an
200
MW
�
5 Sl
ots o
f con
tinuo
us th
ree
Day
s whe
n av
erag
e
URS
wa
s mor
e th
an
500
MW
RS
D Po
ssib
ility
Jan
201
4- J
an 2
015
Perio
d
Freq
uenc
y C
hart
June
201
4 to
Jan
201
5
CG
S Po
wer
Pur
chas
e co
st p
er u
nit d
etai
ls fo
r the
Mon
th o
f JAN
UA
RY 2
015
C
ost i
n R
s/K
WH
r
CG
S Fi
xed
cost
Va
riabl
e co
st
Tota
l
NTP
C- R
STP
S 1
&2
0.53
2.
544
3.07
NTP
C- R
STP
S S
tage
3
0.95
2.
707
3.66
NTP
C -T
alch
er S
TPS
0.
80
1.46
5 2.
27
NTP
C -S
imha
dri S
TPS
1.
64
2.73
7 4.
38
NTE
CL-
Val
lur S
TPS
2.
12
2.08
1 4.
20
NLC
-TP
S-I (
Exp
ansi
on)
1.63
2.
125
3.76
NLC
-TP
S II
Sta
ge-1
0.
57
2.22
1 2.
79
NLC
-TP
S I
I Sta
ge-2
0.
60
2.22
1 2.
82
NPC
IL -
MAP
S 2.
057
NPC
IL -
KG
S U
nits
1 -4
3.
020
NPC
IL -
Kud
anku
lam
NPP
3.
545
Estim
ated
Los
s Du
e to
Und
er D
raw
al
Annexure-X
�
������������ ���������������������������������� �������������������������������������
�������������� ���� ������� ��
����� ��������� ���
��� ��������� ���
��������� ����� ������ �������
������
�
��������� ����������
�������� ���������� ��� �!� "� �!�����"���� ���#$� ����� $��$�%�����"���� ���&� ���$� #����'�(�)!����*+�� ����&� �#��#� ���#����)�"���,��*+� $#��-� �-���� ����#���.�.*�/� ������ $��&-� ������'.�.�/� �-�&�� ���-� ���$&�0.�1�2�/� $����� ��-�� �����1/03. � �#��#� ����� &�$��4*+�� �$���� ���#� ���#���*+�� �$�$�� $���� ��-��%+5 � ����#� ����� �����/33%66/� $��#�� $���-� ����#��0 5�*�� -����� ��-&� �������3�� ������ &�$�� �$��&��/��*�� ������ 7��-�� 7&�#��'. %�� $��$�� $-���� ��$�����*+�� �$��#� ���&�� $&��#�05*+�� ������ ������ �&�#��05*+��� �$��#� $�-�� -�#��*���������*+�� �#���� #���� �-����6�8���)��*+�� ������ ����� �����6��������,�*+�� ������ ������ ���$��*���"� �������� ����-�� ����-�
�
*���������� ������������9� ����� ������������������������������������������:��������������;����<����"������<�"�!� ���<������=���"�>�����?�
�
�
Annexure-XI
�
�
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
$��
$��
$��
$��
$-�
$-�
$��
$��
$#�
#���
����+�
#���
����+�
#���
����+�
#���
����+�
#���
����+�
#��$
����+�
#���
����+�
#���
����+�
#���
����+�
#��-
����+�
#��-
����+�
#���
����+�
#��#
����+�
#��#
����+�
#��&
����+�
&���
����+�
&���
����+�
&���
����+�
&���
����+�
&���
����+�
&��$
����+�
&���
����+�
&���
����+�
&���
����+�
&��-
����+�
&��-
����+�
&���
����+�
&��#
����+�
&��#
����+�
&��&
����+�
#����� $
�9�
@��A
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
$��
$��
$-�
$-�
$��
$��
$#�
$#�
#���
����+�
#���
����+�
#���
����+�
#���
����+�
#���
����+�
#��$
����+�
#���
����+�
#���
����+�
#���
����+�
#��-
����+�
#��-
����+�
#���
����+�
#��#
����+�
#��#
����+�
#��&
����+�
&���
����+�
&���
����+�
&���
����+�
&���
����+�
&���
����+�
&��$
����+�
&���
����+�
&���
����+�
&���
����+�
&��-
����+�
&��-
����+�
&���
����+�
&��#
����+�
&��#
����+�
&��&
����+�
�9�
@��A
#�!! %� &
� �
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
$��
$�-
$��
$�#
$�&
$-�
$-�
$-�
$-$
$-�
$-�
#���
�$��+�
#���
����+�
#���
��&�+�
#���
��#�+�
#��$
����+�
#��$
��-�+�
#���
����+�
#���
����+�
#���
��$�+�
#��-
����+�
#���
����+�
#���
����+�
#��#
��&�+�
#��#
��#�+�
#��&
�$��+�
&���
��-�+�
&���
����+�
&���
�$��+�
&���
��$�+�
&���
����+�
&��$
�$��+�
&���
����+�
&���
��&�+�
&���
��#�+�
&��-
����+�
&��-
��-�+�
&���
����+�
&��#
����+�
&��#
��$�+�
&��&
����+�
&���
����+�
'. %��%$
�9$
@��A
�&���
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�����
�����
��-��
��#��
�����
�����
�����
��-��
��#��
�����
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
�9�
�����@��A
��3��%�
�
�
�
�
�
�&���
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�����
��#��
�����
�����
�����
��-��
��#��
�����
�����
�����
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
�9�
�����@��A
��3��%�
�&���
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�����
�#���
�#���
�&���
�&���
�����
�����
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
�9� �����@��A
��3��%�
�
�
�
�
�
�&���
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�����
�&���
�����
�����
�����
�����
�����
�����
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
������#
���
������#
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
�������
���
�������
���
�������
���
������-
���
�9-
�����@��A
��3��%-
�&��
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
��#
��&
���
���
���
��$
���
���
��-
���
��#
����-���
�������$
��������
��������
����#���
����#��&
����#�$#
����#���
����&��-
����&�$�
����&���
�������$
������$�
��������
��������
�������&
�������#
��������
�������-
��������
����$���
����$��$
����$���
��������
��������
������$&
�������#
��������
������$-
��������
����-���
����-�$$
'���� (�)� $*
�.37B�C�9D �.37/B�C�9D @�2E%205F�C�GD
�
�
�
�
�
�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
��-
��#
���
���
���
��-
��#
���
���
���
��������
������$�
����#���
����#�$�
����&���
����&�$�
��������
������$�
��������
������$�
��������
������$�
����$���
����$�$�
��������
������$�
��������
������$�
����-���
����-�$�
��������
������$�
�9$
@��A����)
05*+��%H$
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�&#
���
���
���
��-
��#
���
���
���
��-
��#
��������
������$�
����#���
����#�$�
����&���
����&�$�
��������
������$�
��������
������$�
��������
������$�
����$���
����$�$�
��������
������$�
��������
������$�
����-���
����-�$�
��������
������$�
�9�
@��A����)
05*+���%H�
�
�
�
�
�
�&���
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�����
�&�
�&�
�&�
�&-
�&#
���
���
���
��-
��������
�������&
�������#
����-���
����-��-
��������
��������
����#��$
����#���
����&���
����&���
�������&
�������#
��������
�������-
��������
��������
����$��$
����$���
��������
��������
�������&
������$#
����-���
����-�$-
��������
������$�
����#��$
����#�$�
����&���
����&�$�
����&��&
@�2E�9
�*+�7%H�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�#�
�&�
�&�
���
���
�����
������
�������$
�������-
����-��&
����-�$�
����-���
�������#
��������
����#���
����#���
����#���
����&��$
����&�$-
����&��&
��������
��������
�������#
������$�
��������
��������
��������
����$��$
����$��-
����$��&
��������
������$�
�������#
��������
��������
����-���
����-�$�
����-��$
�������-
������$&
�*+�7%H$
�9
@�2E
�
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�#�
�&�
�&�
���
���
���
���
��������
��������
�������#
����-���
����-�$-
��������
��������
�������#
����#���
����#�$-
����&���
����&���
����&��#
��������
������$-
��������
��������
�������#
��������
������$-
����$���
����$���
����$��#
��������
������$-
��������
��������
�������#
����-���
����-�$-
��������
��������
�������#
�9
�*+�7%H�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�&�
�&�
���
���
���
���
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
������#
���
������#
���
������&
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
������$
���
�������
���
�������
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
�9�
@�2E
**+�7%�
�
�
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
���
���
���
��-
��#
���
���
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
������#
���
������#
���
������&
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
������$
���
�������
���
�������
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
�9�
@�2E
**+��%�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
���
���
���
��-
��#
���
���
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
������#
���
������#
���
������#
���
������&
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
������$
���
������$
���
�������
���
�������
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�9$
@�2E
**+��%$
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�&�
�&�
�&-
�&#
���
���
���
��-
��#
���
���
������
����
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
������#
���
������#
���
������&
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
������$
���
�������
���
�������
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
�9�
@�2E
**+�7%�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
��#
��#��
��&
��&��
���
�����
���
�����
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
������#
���
������#
���
������&
���
������&
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
������$
���
������$
���
�������
���
�������
���
�������
���
�������
���
�������
���
������-
���
������-
���
�������
���
�������
���
�������
���
�9�
@�2E
�**+�7%�
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�&�
�&�
�&�
�&-
�&#
���
���
���
��-
�������
���
�������
��-
�������
�$�
�������
��#
������#
���
������#
���
������#
�$-
������#
���
������&
��#
������&
���
������&
���
������&
��-
�������
���
�������
��#
�������
���
�������
���
�������
��-
�������
�$�
�������
��#
�������
���
�������
���
�������
�$-
�������
���
������$
��#
������$
���
������$
���
������$
��-
�������
���
�������
��#
�������
���
�������
���
�������
��-
�9
@�2E
'*+�7%�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
����
�##
�#&
�&�
�&�
�&�
�&$
�&�
�&����
����
���
�������
��-
�������
�$�
�������
��#
������#
���
������#
���
������#
�$-
������#
���
������&
��#
������&
���
������&
���
������&
��-
�������
���
�������
��#
�������
���
�������
���
�������
��-
�������
�$�
�������
��#
�������
���
�������
���
�������
�$-
�������
���
������$
��#
������$
���
������$
���
������$
��-
�������
���
�������
��#
�������
���
�������
���
�������
��-
�9
@�2E
'*+��%H�
�&���
�&�#�
�&�#�
�&�&�
�&�&�
�����
�����
�����
�--��
�-#��
�����
�����
�����
��-��
��#��
��������
�������#
������$-
��������
����#���
����#�$�
����#��#
����&��-
����&���
����&���
��������
�������#
������$-
��������
��������
������$�
�������#
�������-
��������
��������
����$���
����$��#
����$�$-
����$���
��������
������$�
�������#
�������-
��������
��������
����-���
�9
@��A����)
'*+�7%�
�
�
�
�
�
�&���
�&�#�
�&�#�
�&�&�
�&�&�
�����
�����
�����
�&����
�&����
�&����
�&$���
�&����
�&����
�&-���
��������
�������&
������$#
��������
����#��-
����#�$�
����#���
����&��$
����&�$�
����&���
��������
�������&
�������#
��������
�������-
��������
��������
�������$
��������
����$���
����$���
����$�$&
����$��#
��������
������$-
��������
��������
������$$
��������
�9
@��A����)
'*+� %-
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
�-�
�-�
���
���
�#�
�#�
��������
��������
������$&
�������#
����#���
����#�$-
����#���
����&���
����&�$$
����&���
��������
������$�
�������&
�������#
��������
�������-
��������
��������
�������$
����$���
����$���
����$���
����$��&
�������#
������$�
�������-
��������
������$�
�������$
����-���
����-�$�
����-���
�9
@�2E
�F*+��%�
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
���
���
���
�-�
�-�
���
�����
������
��������
������$&
�������#
����#���
����#�$-
����#���
����&���
����&�$$
����&���
��������
������$�
�������&
�������#
��������
�������-
��������
��������
�������$
����$���
����$���
����$���
����$��&
�������#
������$�
�������-
��������
������$�
�������$
����-���
����-�$�
����-���
�9
@�2E
�F*+��%�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
���
��#
��&
���
���
���
��$
���
���
��-
���
��������
��������
������$$
�������&
����#���
����#���
����#�$�
����#��$
����&��&
����&���
����&���
����&���
�������$
�������&
��������
��������
��������
������$$
�������&
��������
��������
������$�
�������$
����$��&
����$���
����$���
����$���
�������$
�������&
��������
��������
��������
�F*+��%$
�
�
�
�
�
�&��
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
��#
�-�
�-�
�-�
�--
�-#
���
���
���
��-
��#��
������
��������
������$$
�������&
����#���
����#���
����#�$�
����#��$
����&��&
����&���
����&���
����&���
�������$
�������&
��������
��������
��������
������$$
�������&
��������
��������
������$�
�������$
����$��&
����$���
����$���
����$���
�������$
�������&
��������
��������
��������
�9
@�2E
�F*+� %�
�&�$
�&��
�&��
�&�-
�&��
�&�#
�&�&
��
����
���
���
���
�-�
�-�
���
���
�#�
�#�
�&�
�&�
����-���
����-���
����-�$&
����-��#
��������
������$-
��������
����#���
����#�$$
����#���
����&���
����&�$�
����&��&
�������#
��������
�������-
��������
��������
�������$
��������
��������
��������
�������&
����$��#
����$�$�
����$��-
��������
������$�
�������$
��������
������$�
��������
�9
@�2E
�F*+��%�
�
�
�
�
�
�
�
�
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
���
��#
��&
���
���
���
��$
���
���
��-
���
��#
������#
���
�������
���
�������
��-
�������
���
�������
���
�������
��&
�������
��$
�������
��#
�������
�$�
�������
�$-
�������
���
�������
���
�������
��&
�������
���
�������
��#
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
��#
�������
�$�
�������
�$�
�������
���
�������
���
�������
���
�������
���
�������
��#
�9�
@��A
�/��.3�/7%�
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
���
���
���
��$
���
���
��-
������#
���
�������
���
�������
��-
�������
���
�������
���
�������
��&
�������
��$
�������
��#
�������
�$�
�������
�$-
�������
���
�������
���
�������
��&
�������
���
�������
��#
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
��#
�������
�$�
�������
�$�
�������
���
�������
���
�������
���
�������
���
�������
��#
�9�
@��A
�/��.3�/7%�
�
�
�
�
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
�-�
���
�#�
�&�
���
���
���
������#
���
�������
���
�������
��-
�������
���
�������
���
�������
��&
�������
��$
�������
��#
�������
�$�
�������
�$-
�������
���
�������
���
�������
��&
�������
���
�������
��#
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
��#
�������
�$�
�������
�$�
�������
���
�������
���
�������
���
�������
���
�������
��#
�9$
@��A
�/��.3�/7%$
�&�$�
�&���
�&���
�&�-�
�&���
�&�#�
�&�&�
�����
�����
���
���
��-
���
��#
��&
���
���
���
��$
���
������#
���
�������
���
�������
��-
�������
���
�������
���
�������
��&
�������
��$
�������
��#
�������
�$�
�������
�$-
�������
���
�������
���
�������
��&
�������
���
�������
��#
�������
���
�������
���
�������
���
�������
���
�������
���
�������
���
�������
��#
�������
�$�
�������
�$�
�������
���
�������
���
�������
���
�������
���
�������
��#
�9�
@��A
�/��.3�/7%�
______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 1 of 3
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI
Petition No. 420/MP/2014
Subject : Endangering grid security due to non-implementation of contingency demand disconnection scheme for sudden loss of wind generation as per CERC order dated 22.2.2014 in Petition No. 120/MP/2011, non-availability of LVRT protection, non scheduling of wind generation as per Regulation 6.5.23 (j) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010, Regulation 5.3 regarding lack of necessary demand estimation and not providing real time SCADA data to LDC.
Date of hearing : 26.2.2015
Coram : Shri Gireesh B. Pradhan, Chairperson Shri A.K. Singhal, Member Shri A.S. Bakshi, Member
Petitioner : Southern Regional Load Despatch Centre
Respondents : Tamil Nadu State Load Despatch Centre
Parties present : Shri V. Suresh, SRLDC Shri Pankaj Batra, CEAShri S. Vallinayagam, Advocate, SLDC, Tamilnadu Shri S.K.Sonee, POSOCO
Record of Proceedings
The representative of Southern Regional Load Despatch Centre (SRLDC) submitted as under:
(a) Regulation B (3) of the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007 provides that Low Voltage Ride Through (LVRT) is compulsory for machines installed after 15.4.2014 but for existing wind power generating stations, LVRT should be mutually discussed. It does not exempt any station from installing LVRT.
(b) The issue of installing LVRT has been discussed from the time when the installed capacity of wind in Sothern Regioin was 3000 MW.
Annexure-XII
______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 2 of 3
Presently, the installed capacity is around 13,000 MW. Out of this, 9000 MW wind capacity does not have LVRT.
(c) No tangible action has been taken with regard to installation of LVRT. The responsibility of monitoring installation LVRT has not been fixed under any Regulation.
2. The representative of CEA submitted as under:
(a) At the time of framing Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007, it was thought that installation of LVRT on existing machines will have an implication on tariff. Since, ADMS scheme has not been implemented by the States, the grid becomes vulnerable due to emergency situations such as sudden variation of load/loss of wind generation or forced outages are there etc. Therefore, availability of LVRT is very important.
(b) STU/SLDC should be responsible to monitor installation of LVRT. LVRT should fall under the Connectivity Regulations of respective State.
3. In response to the Commission’s query regarding availability of LVRT on new generators, the representative of CEA submitted that status of LVRT on new generators will be filed after checking with generators.
4. The representative of POSOCO submitted that installation of LVRT needs to be ensured at the time of “connection” of the wind generators itself. The strictness of LVRT is necessary.
5. After hearing the parties, the Commission directed to admit the petition and issue notice to the respondents. The Commission directed to issue notice to Wind Energy Association and Solar Power Association of Southern Region.
6. The Commission directed the petitioner to implead Wind Energy Association and Solar Power Association of Southern Region as party to the petition and file revised memo of parties.
7. The Commission directed the petitioner to serve copy of the petition on the respondents, Wind Energy Association and Solar Power Association of SouthernRegion immediately. The respondents were directed to file their replies by 27.3.2015with an advance copy to the petitioner, who may file its rejoinder, if any, on or before17.4.2015.
______________________________________________________________________________ ROP in Petition No. MP/420/2014 Page 3 of 3
8. The Commission directed the respondents to submit on affidavit by 27.3.2015 status of LVRTs on wind generators in their respective States.
9. The petition shall be listed for hearing on 23.4.2015.
By order of the Commission
Sd/- (T. Rout)
Chief (Law)
Annexure-XIII
Annexure-XIV
Stan
dby
Dat
a C
hann
el S
tatu
s
SCAD
A�&
�CO
MM
UN
ICAT
ION
Ann
exur
e-X
VII
Non
-ava
ilabi
lity
of st
andb
y da
ta c
hann
eat
Nel
aman
gala
,Tal
cher
,Koc
hi,
LAN
CO
& N
ello
rePS
,Nel
lore
SAS,
TPC
IL,N
TPL
Voi
ce C
omm
unic
atio
n st
atus
.N
on-a
vaila
bilit
y of
voi
ce c
omm
unic
atio
n at
Pug
alur
,K
olar
HV
AC
,Hiri
yur.K
aliv
athn
apat
tu,M
ysor
e,N
aren
dra,
Triv
andr
um,T
alch
erH
VD
C,H
assa
n,K
ochi
,Pal
akka
duPu
duch
ery,
Mun
iraba
d,N
TPC
Kay
amku
lam
,MA
PS,K
aiga
,NLC
ST2,
y,
,g
,,
NLC
TS
1Exp
ansi
on.&
NLY
TS
2Exp
ansi
on, N
TEC
L V
ALL
UR
Inte
rnet
com
mun
icat
ion
Rel
iabl
e/ D
edic
ated
inte
rnet
com
mun
icat
ion
for
eb
e/
edc
ede
eco
uc
oo
Syst
em o
pera
tion-
Stat
us o
f con
firm
atio
n.G
atew
ayPr
ovid
ing
Mai
n&
Stan
dby
gate
way
fora
llne
w/u
pcom
ing
stat
ions
Prov
idin
gM
ain
&St
andb
yga
tew
ayfo
rall
new
/upc
omin
gst
atio
ns.
Sum
mar
y�of
�Pen
ding
�Fie
ld�In
puts
Con
stitu
ent
Des
crip
tion
Pend
ing
as o
n 5th
Febr
uary
-20
15Po
ints
Add
edPo
ints
Atte
nded
Pend
ing
as o
n 6th
April
-201
5
Anal
og P
oint
s6
00
6SR
-I
(PO
WER
GR
ID)
gSt
atus
Poi
nts
00
00
Tota
l6
00
6
NTP
C R
amag
unda
mAn
alog
Poi
nts
00
00
Stat
us P
oint
s0
00
0To
tal
00
00
Anal
ogPo
ints
100
010
SR -
II (
POW
ERG
RID
+HVD
C
TALC
HER
)
Anal
ogPo
ints
100
010
Stat
us P
oint
s18
00
18To
tal
280
028
NTP
C T
ALC
HER
STP
PAn
alog
Poi
nts
480
048
Stat
us P
oint
s21
00
21To
tal
690
069
Al
Pi
t0
00
0N
TPC
KAY
AM
KU
LAM
Anal
ogPo
ints
00
00
Stat
us P
oint
s0
00
0To
tal
00
00
NPC
IL-M
APS
Anal
og P
oint
s12
00
12St
atus
Poi
nts
10
01
Tota
l13
00
13A
lP
it
100
10N
PCIL
-KAI
GA
Anal
ogPo
ints
100
010
Stat
us P
oint
s0
00
0To
tal
100
010
NPC
IL-K
KN
PPAn
alog
Poin
ts13
00
13St
atus
Poi
nts
00
00
Tota
l13
00
13A
lP
it
00
00
NLC
Anal
ogPo
ints
00
00
Stat
us P
oint
s0
00
0To
tal
00
00
APAn
alog
Poin
ts0
00
0St
atus
Poi
nts
00
00
Tota
l0
00
0An
alog
Poin
ts0
00
0TE
LAN
GA
NA
Anal
ogPo
ints
00
00
Stat
us P
oint
s0
00
0To
tal
00
00
KAR
NA
TAK
AAn
alog
Poin
ts4
00
4St
atus
Poi
nts
00
00
Tota
l4
00
4An
alog
Poi
nts
00
00
Ann
exur
e-X
IX
Ale
rtE
ME
RG
EN
CY
NC
Ale
rtE
ME
RG
EN
CY
NC
Ale
rtE
ME
RG
EN
CY
NC
Ale
rtE
ME
RG
EN
CY
NC
Ale
rtE
ME
RG
EN
CY
NC
Ale
rtE
ME
RG
EN
CY
NC
Dec
embe
r-14
78
15
100
00
027
201
167
00
00
Janu
ary-
152
70
47
02
10
713
06
90
03
0
Febr
uary
-15
921
15
243
01
111
100
86
00
30
Mar
ch-1
511
221
613
05
30
1017
09
60
00
0
Dec
embe
r-14
119
08
120
11
010
71
2127
20
00
Janu
ary-
153
80
58
05
50
54
112
264
01
0
Febr
uary
-15
915
07
162
22
07
60
1516
10
00
Mar
ch-1
513
273
65
15
20
86
014
282
00
0
Dec
embe
r-14
20
03
00
10
07
92
910
20
00
Janu
ary-
152
30
01
02
30
1329
014
271
00
0
Febr
uary
-15
32
01
30
13
05
120
413
00
00
Mar
ch-1
50
20
02
07
50
629
05
230
00
0
Dec
embe
r-14
26
02
40
02
04
50
410
00
00
Janu
ary-
150
60
18
00
10
14
01
111
00
0
Febr
uary
-15
23
01
20
10
00
10
12
00
00
Mar
ch-1
52
51
14
01
10
31
03
50
00
0
Dec
embe
r-14
76
07
60
46
00
00
76
00
00
Janu
ary-
155
70
47
00
20
02
06
112
01
0
Febr
uary
-15
42
04
10
00
02
00
32
00
00
Mar
ch-1
57
10
51
01
40
60
01
10
00
0
Vol
tage
Vio
latio
n M
essa
ges
Mon
thA
PTR
AN
SCO
TST
RA
NSC
OK
PTC
LK
SEB
TA
NT
RA
NSC
OPU
DU
CH
ER
Y
Zer
o C
ross
ing
Vio
latio
n M
essa
ges
Dev
iatio
n V
iola
tion
Mes
sage
s
Loa
ding
Vio
latio
n M
essa
ges
Freq
uenc
y V
iola
tion
Mes
sage
s
Annexure-XVI
Annexure –XVII (SRTS-II- PPT on AMR)
<12 Pages>
POPULATION OF SEMS
• NO OF SEMS > 900 (EXPECTED TO INCREASE BEYOND 1000 IN ONE YEAR)
• NO OF LOCATIONS > 150
• NO OF MAKES: AT PRESENT AROUND 4 MAKES (SML, L&T, WALLABY, ELSTER) OF METERS OF DIFFERENT
SERIES ARE INSTALLED AT DIFFERENT LOCATIONS OF SR
CURRENT METHOD OF RELAY OF DATA TO RLDC
• DATA FROM EACH METER IS DOWNLOADED IN TO A HAND HELD DEVICE (DCD) THROUGH THE OPTICAL
PORT
• THE DATA IS FURTHER DOWNLOADED ON TO THE LOCAL PC USING MANUFACTURER PROPRIETARY
SOFTWARE.
• THIS DATA IS THEN TRANSMITTED TO SRLDC AS EMAIL ATTACHMENT
• SRPC APPROVED IMPLEMENTATION OF THE AMR SCHEME BY POWERGRID IN THE 24TH MEETING HELD ON
15-03-2014 AT CHENNAI.
• IT WAS ALSO AGREED THAT POWERGRID COULD FIRM UP APPROPRIATE TECHNOLOGY FOR
IMPLEMENTATION, BASED ON THE EXPERIENCE IN OTHER REGIONS/UTILITIES
• ACCORDINGLY THE SYSTEMS BEING IMPLEMENTED IN NORTHERN REGION AND EASTERN REGION WERE
STUDIED
• ALSO NECESSARY INPUTS AND FEEDBACK WAS TAKEN FROM THE IMPLEMENTING AGENCIES (M/S
KALKITECH & M/S TCS)
PROPOSED AMR IN SR
• THE AMR PROPOSED FOR SR IS ALSO ON THE SIMILAR LINES OF THE SCHEME THAT IS IMPLEMENTED IN NR
& ER WITH FEW MODIFICATIONS
• THE MAJOR ENHANCEMENT SOUGHT IN THE SCHEME IS TO HAVE A BETTER COMMUNICATION CHANNEL
MAJOR COMPONENTS OF AMR
• DATA CONCENTRATOR UNIT (DCU) – TO BE INSTALLED AT EACH LOCATION
• COMMUNICATION CHANNEL
• CENTRAL DATA COLLECTION SYSTEM – TO BE ESTABLISHED AT RLDC
PROPOSED HIRARCHY OF AMR IN SR
ARCHITECTURE OF
THE PROPOSED AMR
SCHEME IN SR
AMR IN SR
• ESTIMATED COST OF IMPLEMENTATION IS AROUND RS. 4.0-4.5 CRORE
• SYSTEM TO COVER AMC OF 4 YEARS AFTER THE EXPIRY OF WARRANTY OF ONE YEAR
• MAJOR ENDEAVOUR IS TO USE THE BANDWIDTH FROM THE EXISTING FIBER OPTIC NETWORK WHEREVER
POSSIBLE
• EXISTING BROADBAND CONNECTIVITY, IF AVAILABLE, TO INTERNET CAN ALSO BE USED FOR AMR
• GPRS WILL BE THE LAST OPTION WHERE BOTH FIBER/BROADBAND IS NOT AVAILABLE
AMR IN SR
• AS AGREED IN THE 24TH SRPC MEETING, COORDINATION, OPERATION & MAINTENANCE SUBSEQUENTLY
AFTER THE INSTALLATION OF AMR INFRASTRUCTURE TO BE LOOKED AFTER BY THE RESPECTIVE UTILITY
• RECURRING COMMUNICATIONS EXPENDITURE, IF ANY (GPRS CHARGES) ARE TO BE BORNE BY THE OWNER
OF PREMISES WHERE THE INFRASTRUCTURE IS INSTALLED.
AMR IN SR
• DETAILED TECHNICAL SPECS AND SCOPE AND EXECUTION GUIDELINES ALONG WITH THE ESTIMATE ARE
UNDER PREPARATION AND SAME SHALL BE FORWARDED TO BENIFICIARIES AND SRLDC.
• AFTER THE RECEPT OF CONCURRENCE OF STAKEHOLEDERS, NECESSARY ACTION FOR TENDERING AND
AWARD SHALL BE TAKEN UP.
COOPERATION FROM ALL THE STAKEHOLDERS IS HIGHLY SOLICITED
THANK YOU