Annual Assessment Meeting for the
Palisades Nuclear
1
Nuclear Regulatory Commission - Region III
South Haven Michigan
March 21, 2012
PlantReactor Oversight Process – 2011
![Page 2: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/2.jpg)
Purpose of Today’s Meeting
• A public forum for discussion of the licensee’s performance in 2011
• NRC will address the performance
2
issues identified in the annual assessment letter
• Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance
![Page 3: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/3.jpg)
Agenda
• Introduction
• Review of Reactor Oversight Process
• National Summary of Plant Performance
Di i f Pl P f R l
3
• Discussion of Plant Performance Results
• Licensee Response and Remarks
• NRC Closing Remarks
• Break
• NRC available to address public questions
![Page 4: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/4.jpg)
Region III Organization
Cynthia D. PedersonActing Regional Administrator
Jennifer L. UhleActing Deputy Regional Administrator
Division of Reactor ProjectsDivision of Reactor Safety Division of Nuclear Materials Safety
4
K. Steven West, DirectorGary Shear, Deputy Director
Steven A. Reynolds, DirectorKenneth O’Brien, Deputy Director
Jack GiessnerBranch 4 Chief
Regional Specialists
Palisades Resident Inspection Staff
Tom Taylor, Senior Resident InspectorApril Scarbeary, Resident Inspector
Branch Staff
Robert Lerch, Project EngineerDiana Betancourt, Reactor Engineer
Swetha Shah, Reactor Engineer
Anne T. Boland, DirectorPatrick Louden, Deputy Director
Regional Specialists
![Page 5: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/5.jpg)
Our Mission
License and regulate nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
5
– Establishing rules and regulations– Issuing licenses– Providing oversight through inspection, enforcement, and
evaluation of operational experience– Conducting research to provide support for regulatory decisions– Responding to events and emergencies
![Page 6: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/6.jpg)
Some Nuclear Facts
• 104 nuclear power plants supply about 20 percent of the electricity in the U.S.
• Nuclear materials are used in medicine for diagnosis
6
in medicine for diagnosis and cancer treatment.
• Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
![Page 7: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/7.jpg)
The NRC Regulates
• Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
• Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use
7
• Nuclear waste – transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
• Nuclear security – physical security of nuclear facilities and materials from sabotage or attacks
![Page 8: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/8.jpg)
What We Don’t Do
• Regulate nuclear weapons, military reactors, or space vehicle reactors
8
• Own or operate nuclear power plants
• Regulate some radioactive materials, such as X-rays and naturally occurring radon
![Page 9: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/9.jpg)
Reactor Oversight Process
SafetyCornerstones
Baseline Inspection Results
Performance IndicatorResults
StrategicPerformance Areas
SafetyCornerstones
Baseline Inspection Results
Performance IndicatorResults
StrategicPerformance Areas
9
Significance Threshold
Action Matrix
Significance Threshold
Regulatory Response
Significance Threshold
Action Matrix
Significance Threshold
Regulatory Response
![Page 10: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/10.jpg)
Reactor Oversight ProcessCornerstones
Mission
Strategic P f
10
Performance Areas
Cornerstones
Cross-Cutting AreasHuman Performance--Safety Conscious Work Environment--Problem Identification &
Resolution
![Page 11: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/11.jpg)
Significance Threshold of Inspection Findings and Indicators
Safety significance NRC Response
Green (very low) Routine NRC InspectionsWhite (low to moderate) Increases NRC oversight
11
White (low to moderate) Increases NRC oversightYellow (substantial) Increases NRC oversightRed (high) Increases NRC oversight
![Page 12: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/12.jpg)
Action Matrix Concept
Licensee Response
I
Regulatory Response
II
Degraded Cornerstone
III
Multiple/RepDegradedCornerstone
IV
UnacceptablePerformance
V
12
Increasing Safety Significance
Increasing NRC Inspection Efforts
Increasing NRC/Licensee Management Involvement
Increasing Regulatory Actions
![Page 13: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/13.jpg)
National Summary of Plant Performance
Status as of 2/15/2012
I Licensee Response 88
II Regulatory Response 11
III Degraded Cornerstone Palisades now 3
13
III Degraded Cornerstone Palisades now 3
IV Multiple/Repetitive Deg. Cornerstone 1
V Unacceptable 0
Total *103
*Fort Calhoun not included - shutdown and requires NRC permission to restart
![Page 14: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/14.jpg)
National Summary
• Performance Indicator Results for 2011– Green 6585– White 9– Yellow 0
Red 0
14
– Red 0• Total Inspection Findings in 2011
– Green 846– White 13– Yellow 2– Red 0
![Page 15: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/15.jpg)
Palisades Assessment Results
January 1 - December 31, 2011
• In the fourth quarter of 2011 NRC
15
qplaced Palisades in Column III –Degraded Cornerstone Column
![Page 16: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/16.jpg)
Summary of Safety Significant Findings
Plant continues to operate safely, but performance has degraded
• Operator leaves his post – Confirmatory Order
• An Auxiliary Feed Water pump failed to function –
16
An Auxiliary Feed Water pump failed to function (low to moderate safety significance)
• Service Water pump coupling failure –(low to moderate safety significance)
• Complicated shutdown caused by fault during work on an electric panel -(substantial safety significance)
![Page 17: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/17.jpg)
Cornerstones
Mission
Strategic P fPerformance Areas
Cornerstones
SW pump failure
DC bus failure
AF pump failure
![Page 18: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/18.jpg)
NRC’s Response to Issues2011
• Routine inspections ~ 2500 hours
18
• Additional inspections to address plant issues – over 1000 hours
![Page 19: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/19.jpg)
Palisades Inspection Activities
January 1 - December 31, 2011
• Routine Inspections
• Special Inspection Team – Service
19
p pwater coupling failure
• Special Inspection Team – Complicated shutdown caused by electrical fault
![Page 20: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/20.jpg)
Assessment Summary
• Palisades continues to operate safely• NRC placed Palisades in Column III of the
Action Matrix (Degraded Cornerstone) in 4th
quarter 2011• Substantive Cross-cutting Issues (SCCIs) -
20
• Substantive Cross-cutting Issues (SCCIs) -three in human performance area– Conservative Assumptions– Adequate Procedures– Effective Oversight
• If the NRC determines the plant is not operating safely, we will shut down the plant
![Page 21: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/21.jpg)
NRC’s Response to Issues2012
• NRC will do routine/baseline activity
• NRC will do follow-up inspections on all three greater than green findings and confirmatory order
• NRC will independently evaluate the issues
21
• NRC will independently evaluate the issues
– Adequate actions to prevent the issue from occurring again
– Determine if the condition that existed could exist in other equipment
– Determine the root/underlying causes and evaluate if those causes could lead to other events
– Determine if problems with safety culture caused or significantly contributed to the events
![Page 22: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/22.jpg)
Licensee Response and Remarks
Entergy Nuclear Operations
22
Entergy Nuclear Operations
Palisades Nuclear Plant
Remarks
![Page 23: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/23.jpg)
Closing Remarks
Cynthia Pedersony
Acting Regional Administrator, RIII
23
![Page 24: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/24.jpg)
Questions/Comments
24
![Page 25: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/25.jpg)
Open to the Public
• The NRC places a high priority on keeping the public and stakeholders informed of its activities.
25
• At www.nrc.gov, you can:– Find public meeting dates and transcripts;– Read NRC testimony, speeches, press releases,
and policy decisions; and – Access the agency’s Electronic Reading Room
to find NRC publications and documents.
![Page 26: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/26.jpg)
Contacting the NRC
• Report an emergency– (301) 816-5100 (call collect)
• Report a safety concern
26
– (800) 695-7403
• General information or questions– www.nrc.gov
– Select “What We Do” for Public Affairs
![Page 27: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/27.jpg)
NRC Representatives
• Viktoria Mitlyng, Office of Public Affairs, RIII- (630) 829-9662
• John “Jack” Giessner, Branch Chief, Division of Reactor Projects
27
j- (630) 829-9619
• Tom Taylor, Senior Resident Inspector- (269) 764-8971
• April Scarbeary, Resident Inspector- (269) 764-8972
![Page 28: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/28.jpg)
Reference Sources
• Reactor Oversight Process– http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html
• Public Electronic Reading Room
28
Public Electronic Reading Room– http://www.nrc.gov/reading-rm.html
• NRC Information Digest– http://www.nrc.gov/reading-rm/doc-
collections/nuregs/staff/sr1350/
• Public Document Room– 1-800-397-4209 (Toll Free)
![Page 29: Annual Assessment Meeting for the Palisades Nuclear Plant · Annual Assessment Meeting for the Palisades Nuclear 1 Nuclear Regulatory Commission - Region III South Haven Michigan](https://reader035.vdocument.in/reader035/viewer/2022063001/5f1fb8d2dfb96e70c11d4d3e/html5/thumbnails/29.jpg)
NRC Social Media Channels
• Blog: http://public-blog.nrc-gateway.gov/
• Flickr: http://www.flickr.com/photos/nrcgov/
• Twitter: https://twitter.com/#!/nrcgov
• YouTube: http://www.youtube.com/user/NRCgov
• RSS: http://www.nrc.gov/public-involve/listserver.html#rss
29