Annulus Monitoring & ControlDeep, High-Pressure Class I Wells
Stephanie Hill, P.G.
![Page 2: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/2.jpg)
Project BackgroundNew Geologic Area for Class I Wells
• “Wildcat” Wells• No Operator Experience• Limited Regulatory Experience• No Program Guidance
2
![Page 3: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/3.jpg)
Project BackgroundDownhole Construction
• >10,000 ft TD Wells• Manage Coal Mine Wastewater• >7,500’ Packer Seat• Packers set under Compression• New P110 Tubing (~200 joints)
• Torqued on Joints to API Specs• Pressure Tested during Installation
• Large Annular Volumes• 7,000 – 14,000 Gallons
3
v
LS Casing 7”
Tubing 5 ½”
v
LS Casing 9 5/8”
Tubing 4 ½”
![Page 4: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/4.jpg)
Project Background
Typical Low Pressure Seal Pot with Nitrogen Blanket
4
![Page 5: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/5.jpg)
Project BackgroundOperating Constraints/Conditions
• Permit Limits• Injection Pressures ~1700 psi• Annulus Pressures ~300 psi
• Annulus Pressures < Injection Pressures• Large Pressure Differential on Downhole Components
• >1600 psi• Large Temperature Differentials
• 70 - 90 °F• Potential Fluids Migration not Protective of USDW
5
cv
Injection Pressure2000 psi
Annulus Pressure400 psi
![Page 6: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/6.jpg)
ChallengesOperating Scenarios
1. Injection Under Pressure & Adding fluid2. Injection Under Pressure & Removing Fluid3. Post Injection Shut-in
6
![Page 7: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/7.jpg)
Challenges
• Injectate Temp 70°F < Annulus Temp
• Tubing and Annular Fluid Contracts, Pressure Decreases
• Must Add Fluid to Seal Pot due to Annular Volume Change
7
cv
Injection Pressure2000 psi
Annulus Pressure400 psi
1 - Injection Under Pressure, Adding Fluid
![Page 8: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/8.jpg)
• Injectate Temp Warms• Dynamic Tubing Conditions
Create One-Way Micro Leak• Must Remove Fluid from Seal
Pot due to Volume Change
8
Challenges
cv
Injection Pressure2000 psi
Annulus Pressure400 psi
2 - Injection Under Pressure, Removing Fluid
![Page 9: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/9.jpg)
9
Challenges
• Injectate Temp Cools after Shut-In• Injection P Decreases to <100 psi
• Tubing/Annular Fluid Continues to Expand• Annulus P Increases to > 3,000 psi
3 – Post Injection Shut-In
Operator bled off annulus P
![Page 10: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/10.jpg)
• Few Comparable Situations• Inquired with Academia, UIC Industry & Operators
• Need to Limit Pressure Swings in Annulus• Need to Allow for Monitored Fluid Movement• Need Real Time Measurement and Monitoring
Defining the Solution
10
![Page 11: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/11.jpg)
SolutionSkid-Mounted Annulus Monitoring & Control System• Non-Pressurized Vessel• Operates Delta P: Annulus >
Injection• Small Piston Pump w/ VFD
• Meters Flow in/out of Annulus• Low Volume Flow Meters• Level Sensors• Pressure Relief Valves
11
![Page 12: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/12.jpg)
Solution
• Injectate Temp 70°F < Annulus
12
New Scenario - Injection Under Pressure
• Injectate Temp 70°F <Annulus
• PLC Set Points Track Annular Pressure to Operate 150 psi Above Injection Pressure
• Piston Pump Adds/Removes Fluid to Annulus to Maintain Delta P Above Injection Pressure
![Page 13: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/13.jpg)
13
Solution
• Fluid in Tubing Cools• Annular Fluid Contracts as it
Cools• Skid Automates Pressure
Decrease to Track Tubing Pressure
cv
Injection Pressure
50 psi
Annulus Pressure200 psi
New Scenario – Post Injection Shut-In
![Page 14: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/14.jpg)
14
cv
Injection Pressure2000 psi
Annulus Pressure400 psi
cv
Injection Pressure2000 psi
Annulus Pressure2150 psi
OLD: Annulus P < Injection P NEW: Annulus P > Injection P
Protection of USDWPositive Impacts on Operation
![Page 15: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/15.jpg)
Positive Impacts on Operation• No Labor Intensive Fluid Additions or Removals• Eliminates High Pressure Micro Leaks at Joints• No Costly Workovers• Reduces Differential Stresses on Well Components• Protection of USDW from Potential Fluids Migration• Clients Love it!
15
![Page 16: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/16.jpg)
Positive Impacts on OperationLeak Detection
16
Shut-in
Loss of annulus fluid (~2 gpm) Exhausted annulus fluid from skid system
Annulus P ~150 psi > Injection P
![Page 17: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/17.jpg)
Results• New Permit Conditions
•Annulus Pressure 100 - 200 psi > Injection Pressure• No More Micro Leaks at Tubing Joints• Strict Control of Annular Fluid Volumes• Well can Operate Continuously
•Skid System Cycles on/off at Start-Up •Settles once Temperatures and Pressures Stabilize
• Annular Pressure Tracks ~150 psi > Injection Pressure
17
![Page 18: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/18.jpg)
Conclusions• ~200 Tubing Joints can Experience Significant Stress
under Wide Operational Temps/Pressures• Micro Leaks can be One Way• High Pressure Wells Require Alternate Annulus
Monitoring Approach• Solution Relatively Straight Forward• Avoided Costly Workover/Compliance Issues
18
![Page 19: Annulus Monitoring & Control - GWPC · 2020. 2. 21. · • Micro Leaks can be One Way • High Pressure Wells Require Alternate Annulus Monitoring Approach • Solution Relatively](https://reader036.vdocument.in/reader036/viewer/2022071117/600150039654d672e94a5fd9/html5/thumbnails/19.jpg)
DiscussionStephanie Hill, P.G.(618) [email protected]