AP PROJECTSINTERIOR ENGINEERING
w ww.approjects.orgwww.indiamart.com/ap-projects
Mail :[email protected]
SERVICES
PROJECT MANAGEMENT CONSULTANCY
INTERIOR ENGINEERING
CONSTRUCTION ENGINEERING
Mail :[email protected]
MR. ARVIND PUROHIT
BACK BONE
(BE, Mumbai Univ. 1975)
1. HOME TOWN (PANTALOON RETAIL (INDIA) LTD)2. EXPO PROJECTS3. HYDROCARBON INDUSTRIES4. WATER INDUSTRYAS A PROJECT MANAGER,PROJECT HEAD,GM PROJECTS ETC.
40 YEARS EXPERIENCE IN PROJECT MANAGEMENT IN BOTH CONSTRUCTION AND INTERIORS IN VARIOUS COUNTRIES
Mail :[email protected]
VISION
TO STABLISH NEW CONCEPT IN THE MARKET AS INTERIOR ENGINEERING
BEING PIONEER IN PROJECT MANAGEMENT SOLUTION
A WIDE PLATFORM FOR ENGINEERING SOLUTIONS
TO STABLISH TRIPLE POINT OF COST ,QUALITY AND TIME
Mail :[email protected]
INTERIOR ENGINEERING
PROJECT INTRODUCTION
DESIGN
IMPLEMENTATION
Mail :[email protected]
MARKET STUDY COMPETITORS
CONCEPTION
ENGG.DESIGN PRICE
PROJECT DYNAMICS
QUALITY TIME
IMPLEMENTATION
PROJECT INTRODUCTION
ROXTON’S PRODUCT
MARKET STUDY TO DESIGN SHOW ROOM FOR ROXTON
VALUE ENGINEEERING FOR ROXTON
COMPETITORS ROXTON HAS VERY TOUGH COMPETIOTRS IN THE MARKET
ROXTON REQUIRES MORE FOOTFALL OF CUSTOMERS
CUSTOMER AGE GROUP IS 18 YEARS OLD TO 40 YEARS OLD
THE SHOWROOM REQUIRES A ROUGH AND ATTRACTIVE LOOK
THE COST CUTTING HAS TO BE LESS BY 30% WITH EXISTING ONE & MANY MORE….
ROXTON SPENDS ABOUT 20 LACS ON PER STORE
SHOWROOM HAS ONLY STATIC AND FORMAL LOOK
BREAK UP OF B.O.Q. WITH DETAIL COST ANALYSIS
POINTING TOWARDS HIDDEN COST DUE TO POOR DESIGN
Mail :[email protected]
DESIGN
3D-MODELINGSOFTWARES
CATIA
COST ANALYSIS
COST CUTTING OF ALMOST 50%
STATIC + DYNAMIC 3D-MODELING AND DESIGN
PROPOSED AN AUTO-FOCUSED MODIFIED BIKE ON CEILING
A ROUND S.S. GANDOLA AT THE CENTRE
A SEMI ROUND CASH COUNTER AT THE BACK OF STORE
A ROUGH AND DARK LOOK TO OVER ALL STORE
M/S/ POWERDE COATED FIXTURES
LIGHTING WITH CALCULATED INTENSITY
IRONICALLY POSTIONING OF MIRRORS
SYMMETRICAL PLACING OF DUCTING AND FIREFIGHTING PIPIES
A VERY ATTRACTIVE BLUE ILLUMINATED TRANSPARENT LOGO
Mail :[email protected]
COSTDIFFERENCE
02468
1012141618
PREVIOUS DESIGNAP PROJECTS DESIGNCOST
IN LACS
Mail :[email protected]
FOOT FALL IN SHOWROOM
FOOT FALLIN %
THE ABOVE REPORT IS BASED ON A SURVEY CONDUCTED FOR A MONTH IN JALANDHAR VERIFIED AND APPROVED BY ROXTON
Mail :[email protected]
0
20
40
60
80
100
ROXTON'S PREVIOUS
DESIGN
AP PROJECTS DESIGN
FOOT FALL IN THE MALL
FOOT FALL IN OTHER SHOPS
FOOT FALL IN ROXTON'S STORE
DESIGN
3D - MODELING SOFTWARES
CATIA
COST ANALYSIS & VALUE ENGINEERING
DESIGNING YOUR DREAMS……..
ITEM QTY HARDWARE + FEVICOL 10%
OVER HEAD10%
LABOUR35% TOTAL RATE IN
Rs.AMOUNT
IN Rs.NEW AMOUNT
IN Rs.NEW RATE
IN Rs.18mm
PLY85 SFT 8.5 8.5 29.75 131.75 45 5930 500638
8MM GLASS
12SFT 1.2 1.2 4.2 18.6 165 3069 1860100
LAMINATE
2 NOS 2 1000 2000 1600800
PAINT 1 LTR
1LTR 290 290 200200
TOTAL 11289 8666
ONLY AN EXAMPLEMail :[email protected]
DESIGNING SOP
SITE SURVEY
SCHEDULING THE PROJECT
RESPONSIBILITY MATRIX AND ORGANOGRAM
STANDARD & UNIQUE REPORTING METHOD
DOCUMENTATION
PROJECT CLOSING REPORT
IMPLEMENTATION
Mail :[email protected]
PROJECT PLANNING AND SCHEDUING
CUSTOMER SATISFACTION
QUALITY
TIME MANAGMENT
PLANING
18-4 19/4 20/1 21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4
Material N Tool
Manpower
AP.O.P & CIVIL WORK PLAN
PLASTERING
B.O.Q.
CIVIL1,CIVIL2
TILINGB.O.
CIVIL1,CI
1 ACTUAL
Marking as per dwg, PLAN
Line
P.O.P.(PE1,P
2 ACTUAL
Griding PLAN
B.O.Q.
PE1,PH1,PH2
3 ACTUAL
Fixing of Gypsum sheet as per dwgPLAN
Drill m
PE1,PH1,PH2
4 ACTUAL
Punning of Gypsum sheetPLAN
scrature
PE1,PH1,
PH2
5 ACTUAL
T
ADD.-THANE-RAM MARUTI ROAD
Resourc
Delay due to land lord
Delay due to architectDelay due to Roxton
Planned activiteis
On scheduleDelay due to contractor
COLOUR CODES
QUALITY
TIME
COST
Mail :[email protected]
CREATIVITY IN CONCEPTION
EFFICIENCY IN PROJECT DYNAMICS
COMMITMENT IN IMPLEMENTATION
WE PROMISE YOU
Mail :[email protected]
CONCEPTION
WE SIMULATE THE WORKING OF THE STAKEHOLDERS TO CREATE A CONTEXTUALLY SATISFYING ENVIRONMENT.
MR.B.V. RAGHAVARCHITECT EXP- 5 YEARS
TEAM
SURESH TIWARIB.E. MECH EXP- 5 YEARS
PROJECT DYNAMICS
WE ENGINEER THE EFFICIENCY OF TIME AND MONEY TO ACHIEVE AN EQUILIBRIUM BETEEN THE BUILDER AND THE USER.
WE CARVE OUT A WORKING MACHINERY THAT CARVES OUT YOUR INTERIOR SPACES
ALOK CHOUDHARI B.E. MECH EXP-15 YEARS
IMPLEMENTATION
Mail :[email protected]
Looking forward to have a good Business Relation.w ww.approjects.org
www.indiamart.com/ap-projectsMail :[email protected]
NO MORE ARCHITECTSNO MORE INTERIOR DESIGNERS
THIS IS SIMPLE INTERIOR ENGINEERING