Download - AP233 Overview
AP233AP233STEP Systems Engineering STEP Systems Engineering
ProjectProject
Jim U’RenJim U’RenSeptember 29, 2005September 29, 2005
Scope of AP233Scope of AP233
Systems Engineering from a “Big Systems Engineering from a “Big Picture” Point of ViewPicture” Point of View
RequirementsRequirements Functional structureFunctional structure Physical structure and allocationPhysical structure and allocation Configuration and traceabilityConfiguration and traceability Project and data managementProject and data management
– ScheduleSchedule– CostCost– RiskRisk
Consistent with INCOSE’s vision of Systems EngineeringConsistent with INCOSE’s vision of Systems Engineering
AP233 ApproachAP233 Approach
AP233 uses a modularized approachAP233 uses a modularized approach– Partitioned a large problem spacePartitioned a large problem space– Allows sequential deliveriesAllows sequential deliveries– Develope APIs and Reference Develope APIs and Reference
ImplementationsImplementations Work with other standards organizationsWork with other standards organizations
– OMG’s SysML TeamOMG’s SysML Team– INCOSEINCOSE
Scope of AP233Scope of AP233Planned Module SetsPlanned Module Sets
Requirements--completeRequirements--complete Structural Models Structural Models Behavioral ModelsBehavioral Models
– Function-basedFunction-based– State-basedState-based
Project ManagementProject Management– WBSWBS– SchedulingScheduling– CostCost– Organizational StructureOrganizational Structure
Risk Analysis*Risk Analysis* Rules*Rules* Validation and VerificationValidation and Verification PDM ExtensionsPDM Extensions SecuritySecurity Data RepresentationData Representation
Legend:Green-complete, Yellow italics-in process, White-TBD*Active collaboration with other teams: Risk with AP239, Rules with AP210
Systems EngineeringSystems Engineering
ParticipantsParticipants NASA - NASA - H. Frisch, G. SiebesH. Frisch, G. Siebes
Eurostep – Eurostep – J. U’Ren D. Price, P. SpibyJ. U’Ren D. Price, P. Spiby
OSJTF – OSJTF – D. HardyD. Hardy
BAE SYTEMS - BAE SYTEMS - J. JohnsonJ. Johnson
NIST - NIST - P. Denno, A. Barnard-FeeneyP. Denno, A. Barnard-Feeney
Georgia Tech - Georgia Tech - R. Peak & Co.R. Peak & Co.
Boeing - Boeing - G. SmithG. Smith
John Deere - John Deere - R. BurkhartR. Burkhart
IBM - IBM - L. BalmelliL. Balmelli
MoD UK – MoD UK – M. GibsonM. Gibson
Lockheed Martin - Lockheed Martin - S. FriedenthalS. Friedenthal
General MotorsGeneral Motors - - M. LoefflerM. Loeffler
Volvo - Volvo - M. LindebladM. Lindeblad
United Technologies - United Technologies - R. CohenR. Cohen
Northrop Grumman – Northrop Grumman – R. WoodR. Wood
Motorola – Motorola – R. Bruce, T. Robar R. Bruce, T. Robar
EADS – EADS – H. Eisenmann, R. EckartH. Eisenmann, R. Eckart
Syntell – Syntell – Erik HerzogErik Herzog
Vendors ParticipatingVendors Participating:: UGS – UGS – TeamCenter RequirementsTeamCenter Requirements
ThreeSL - ThreeSL - CradleCradle
i-Logixi-Logix - - Statemate, RhapsodyStatemate, Rhapsody
Artisan – Artisan – Real-time StudioReal-time Studio
Vitech - Vitech - CORECORE
TelelogicTelelogic – – DoorsDoors
ITI –ITI – QFDQFD
INCOSE - INCOSE - D. Oliver, M. DickersonD. Oliver, M. Dickerson
OMG - OMG - SE DSIG, SysML, DODAF TeamsSE DSIG, SysML, DODAF Teams
NDIA - NDIA - J. HollenbachJ. Hollenbach
Systems EngineeringSystems Engineering
Near-term PlansNear-term Plans
Release AP233 WD2 in Oct 2005Release AP233 WD2 in Oct 2005– Work BreakdownWork Breakdown– ScheduleSchedule– Structure (system breakdown)Structure (system breakdown)– Function-based BehaviorFunction-based Behavior– State-based BehaviorState-based Behavior
Test Test – Test data exchanges using AP233/STEP modules Test data exchanges using AP233/STEP modules
Complete mapping of STEP/AP233 to DODAF Complete mapping of STEP/AP233 to DODAF database database
Work with AP239 to get Risk Modules to ballotWork with AP239 to get Risk Modules to ballot
Systems Engineering ProjectSystems Engineering Project Challenges Challenges
SC4 Management and Rules ChangesSC4 Management and Rules Changes– Recent changes in SC4’s timeframes between Recent changes in SC4’s timeframes between
stages (NWI, WD, CD, DIS, FDIS, IS) have created stages (NWI, WD, CD, DIS, FDIS, IS) have created thresholds that could threaten project cancellationthresholds that could threaten project cancellation
ResourcesResources– Marketing SE project and PDES, Inc. capabilities to Marketing SE project and PDES, Inc. capabilities to
potential sponsors - need to close “the deal”potential sponsors - need to close “the deal” Infrastructure Support for AP233Infrastructure Support for AP233
– Resource constraints limiting updates and bugfixes Resource constraints limiting updates and bugfixes of key infrastructure pieces.of key infrastructure pieces.
Systems EngineeringSystems Engineering
Project AssessmentProject Assessment
AP233 continues to gain visibilityAP233 continues to gain visibility Vendor involvement in implementations Vendor involvement in implementations
continuescontinues Industry groups (e.g., INCOSE, NDIA) show Industry groups (e.g., INCOSE, NDIA) show
interestinterest Testing is important—initial plans made for a Testing is important—initial plans made for a
Systems Engineering Implementors Forum Systems Engineering Implementors Forum (SE-IF)(SE-IF)
Resources to complete the Project are tightResources to complete the Project are tight
OSJTF Sponsored WorkOSJTF Sponsored Work(Open Systems Joint Task Force)(Open Systems Joint Task Force)Linking DODAF-SysML-STEPLinking DODAF-SysML-STEP
SV4
AP233
OMG SysMLOther SE Views
Operational
Systems
Technical
DODAF
AP2xx
Detailed Design,Manufacturing,Life Cycle Support,…
ISO 10303STEP Standardsspecifies requirements for
AP233
DARS
CADM
CA
DM
CADM = Core Architecture Data ModelDARS = DoD Architecture Repository System