Transcript
Contract No. EP/SP/66/12
Integrated Waste Management Facilities, Phase 1 Keppel Seghers – Zhen Hua Joint Venture
Acuity Sustainability Consulting Limited
Appendix H Noise Monitoring Equipment Calibration Certificate
Contract No. EP/SP/66/12
Integrated Waste Management Facilities, Phase 1 Keppel Seghers – Zhen Hua Joint Venture
Acuity Sustainability Consulting Limited
Appendix H Noise Monitoring Equipment Calibration Certificate