AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
Company / Owner
Marine Contractor
Main Contractors - JV
![Page 2: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/2.jpg)
2
OUTLINE:.1Introduction
.2Resources
.3Progress Percentage◦Construction Status
.4Financial Summary
.5Variation Orders
AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
![Page 3: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/3.jpg)
3
The project consists mainly of the detailed design and construction of LPG Jetty which includes:
•Access Trestle & Loading Platform
•2 No. Berthing Dolphins & 4 No. Mooring Dolphins & Catwalks
•Marine Loading Arms (x2)
•LPG and vapour return lines & Cathodic Protection System
•Fire fighting system & Electrical power supply and lighting
•Contractual project dates: 24-Feb-14 24-Oct-14
•Computed Completion Date :21-feb-15
1 .Introduction
AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
![Page 4: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/4.jpg)
4
2 .ResourcesAQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
Manpower 1-Nov-2014 1-Jan-2015Staff 51 54
Direct Labor 41 64Equipment Quantity Rented/
OwnedBarge 1 Owned
Flexi float barge 1 OwnedTug Boat 1 1 OwnedTug Boat 2 1 Rented
Speed Boat 1 RentedVibro Hammer 1 Owned
Diesel Hammer 1 OwnedCrawler Crane 1 OwnedMobile Crane 3 Rented
Air-Compressor 4 OwnedWelding Machine
20 Owned
Truck Mounted Crane
1 Owned
![Page 5: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/5.jpg)
5
3. Progress Percentage
AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
Status Expected Completion DateTrestle 100% CompletePlatform 100% CompleteLoading Arm 100% CompletePile Static Load Test 100% CompletePipe Line 80% 31-Jan-15Mooring Dolphins 80% 25-Jan-15Berthing Dolphins 75% 31-Jan-15Catwalks 75% 5-Feb-15Abutement & Access 50% 28-Jan-15Electrical 30% 10-Feb-15Marine Furniture (QRH,BAS,Fenders,..) 20% 12-Feb-15Commissioning 4-Feb to 18-Feb-15
Construction
![Page 6: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/6.jpg)
6
3.1 Construction of Pipe LinesAQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
Front View
10” FF Pipe4” Vapour Pipe
6” LPG Pipe2.5” Water
Pipe
U-Channel Pipe Support
Concrete Pipe Support
Pipe 13-Jan-15FireFighting 80%Vapour 80%LPG 80%Water 80%
![Page 7: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/7.jpg)
7
4 .Financial Summary
AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
Invoice No.
Description
Initial Amount (JOD)
Agreed Amount (JOD)
Issue Date
Due Date
Settlement Date
Overdue
Period (days)
Status
001Advance payment
10%1,723,255.00 1,723,255.00 5-Feb-14 6-Mar-
14 8-Jun-14 94 Closed
002 IPC-1 2,356,981.61 1,926,073.33 7-May-14 2-Jul-14 19-Aug-14
48 Closed
003 IPC-2 1,092,297.77 969,456.65 7-Jun-14 2-Aug-14 1-Sep-14 30 Closed
004 IPC-3 1,507,114.54 1,245,493.82 12-Jul-14 6-Sep-14 1-Oct-14 25 Closed
005 IPC-4 1,174,215.32 1,583,941.28 11-Aug-14 6-Oct-14 10-Nov-14
35 Closed
006 IPC-5 1,617,218.84 1,006,200.22 8-Sep-14 3-Nov-14 12-Nov-14
9 Closed
007 IPC-6 2,638,679.75 1,919,859.74 7-Oct-14 2-Dec-14 12-Nov-14
Closed
008 IPC-7 1,571,120.29 1,005,264.70 29-Oct-14 24-Dec-14
30-Nov-14
Closed
009 IPC-8 1,864,144.68 993,963.07 2-Dec-14 27-Jan-15 Not Yet Open
010 IPC-9 1,366,814.24 1,212,026.19 2-Jan-15 27-Feb-15 Not Yet Open
Issued 14-Jan-2015
![Page 8: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/8.jpg)
8
.1Steel Water Tank to feed the fire fighting system•Issued on Nov. 17th 2014 (202,425.00) JD, Progress : 30%
.2Firefighting Pumps Room•Issued on 17th 2014 (40,700.0) JD, Progress : 95%
.3LPG and Vapour Return Tie-In to Existing Networks•Issued on 17th 2014 (64,509.61) JD, Progress : 100%
.4Design, Supply and Installation of Main Power cable•Issued on Dec. 24th (18,246.99) JD, Progress : 80%
.5Design, Supply and Installation of a Standby Power Generator•Issued on Dec. 24th (18,198.69) JD, Progress : 80%
5 .Variation Orders (Issued by Employer/CM)
AQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN
![Page 9: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/9.jpg)
9
General Layout
General Layout
![Page 10: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/10.jpg)
Trestle Modules
![Page 11: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/11.jpg)
Pipe Lines on Trestle
![Page 12: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/12.jpg)
Mooring Dolphins
![Page 13: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/13.jpg)
13
Firefighting Tank + Pump Room
![Page 14: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/14.jpg)
14
Static Load Test
![Page 15: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/15.jpg)
15
Loading Arm PrecommissioningLoading Arm Construction
![Page 16: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/16.jpg)
16
Firefighting Monitor Towers
![Page 17: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/17.jpg)
17
Abutment
![Page 18: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/18.jpg)
18
Tie in at Loading Arm
![Page 19: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/19.jpg)
19
Tie in Point
![Page 20: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/20.jpg)
20
Cable Trays onshore + Trestle
![Page 21: Aqaba LPG Terminal Jordan](https://reader030.vdocument.in/reader030/viewer/2022020920/5695d03d1a28ab9b02919d74/html5/thumbnails/21.jpg)
21
Q & AAQABA LIQUIFIED PETROLEUM GAS (LPG) TERMINAL - JORDAN