Schedules Definition: A schedule is an organized
arrangement of notes or information usually lettered within a ruled enclosure, conveniently placed, and coordinated with other drawings
Schedules are continuations of the floor plan Categories or types of schedules
Door Footing Electrical SymWindow Foundation AbbreviationsRoom Finish Electrical Fixture Header/lintel
![Page 3: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/3.jpg)
Schedules
Information going into schedules come from manufacture catalogs, brochures, etc.
Each line of schedule includes all information about item indicated.
Any duplicated information from line to line is indicated by the letters “DO” referring to duplicate. The quote marks (“) get lost in drawing and look to much like a blip on the drawing, therefore quote marks are not used.
![Page 4: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/4.jpg)
Schedules
Schedules should always be placed so the lettering is readable from the bottom of the sheet.
Avoid the crowded look, leave “breathing room” for your lettering and don’t crowd things.
Lettering in schedule is normally 1/8” high, however titles and categories are usually bigger.
Large schedules may include two identification columns, placed on the extreme right and left of the schedule.
Outline the schedule with double lines or bold line.
![Page 5: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/5.jpg)
Door Schedules Headings or information include:
identification (symbol or mark)usually numerically size (width, height, and thickness) type--SC, HC, panel, also included in this area is the way
the door operates: hinged, sliding, pocket, bifold, etc. material of door and fire rating quantity frame type, material of frame hardware/threshold design manufacturer of door and catalog/model number remarks
![Page 6: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/6.jpg)
Coordination With Floor Plan
Door Types:Sliding
HC-Flush
![Page 7: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/7.jpg)
Coded Door Symbol Method
Coded Symbol--An architectural office takes items and assigns them a code designation
Coded symbol is placed on the drawing A listing is also placed on drawing to give description
of coded items
![Page 8: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/8.jpg)
Simplified Door Designations
Used on simple floor plans Only stock doors & windows are used Designations are given along plan symbols
![Page 9: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/9.jpg)
Elevation Schedules
Used primarily for doors and windows Elevations give pictures, dimensions(size), and
information(material) about the doors or windows Complex drawing may include both type of schedule
![Page 10: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/10.jpg)
Door Types by Construction--panel
![Page 11: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/11.jpg)
Door Type by Operation--Bifold
![Page 12: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/12.jpg)
Door Type by Operation--sliding
![Page 13: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/13.jpg)
Door Type by Operation—french/swinging
![Page 14: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/14.jpg)
Door Type by Operation—garage/overhead
![Page 15: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/15.jpg)
Window Schedules Headings or information include:
identification (symbol or mark)usually alphabetical size (width, height, usually no thickness) can be listed as (nominal,
actual, or rough openings size) type and material, double hung, sliding, casement, etc. quantity or count of each type of windows mullions--type, material, and/or number glazing--special information about glass size and how it is set in the
window frame manufacturer of window and catalog/model number remarks
![Page 16: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/16.jpg)
Coordination With Floor Plan
![Page 17: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/17.jpg)
Simplified Door and Window Designations
Used on simple floor plans Only stock doors & windows are used Designations are given along plan symbols
![Page 18: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/18.jpg)
Window Type--casement
![Page 19: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/19.jpg)
Window Type—double hung
![Page 20: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/20.jpg)
Window Type—Horizontal Sliding
![Page 21: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/21.jpg)
Window Type—Awning (upper)
![Page 22: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/22.jpg)
Window Type—Awning (lower)
![Page 23: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/23.jpg)
Window Type—Bow and Bay
![Page 24: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/24.jpg)
Window Type—Special Shape
![Page 25: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/25.jpg)
Window Type—Special Shape
![Page 26: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/26.jpg)
Example: Door and Window Schedule
DO
DO
DO
DO
DO
DO
DO
DO
DO
DO
DO
DOBASEMENT
![Page 27: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/27.jpg)
Special Project Schedules(Use the Research/Work Sheet outlining the
data you need to research)
Add lines
Add line
![Page 28: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/28.jpg)
Review Wall Section Terms
1--Slope and Pitch
2—Fascia Trim
3—Fascia
4—Soffit
5—Sub-Floor and Finish Floor
6—Sole Plate
7—Header
8—Sheathing & Siding
9—Anchor Bolt
10—Foundation clearance
11—Ground cover
12—Rebar Spacing
13—horizontal Rebar
![Page 29: Architectural Schedules](https://reader030.vdocument.in/reader030/viewer/2022013106/56815f6d550346895dce74a3/html5/thumbnails/29.jpg)