DIRECTIVE 2009/148/EC OF THE EUROPEANPARLIAMENT AND OF THE COUNCIL of 30 November2009 on the protection of workers from the risks2009 on the protection of workers from the risksrelated to exposure to asbestos at work(codifiedversion).)
.
Spain transposes the Directive in 2006Spain transposes the Directive in 2006
Royal DECREE 396/2006
DIRECTIVE 2009/148/CE Royal DECREE 396/2006
1 Whereas point (13)1. Whereas: point (13)
It h ld b d th tIt should be ensured thatdemolition or asbestosremoval work is carried out No characteristic for removal work is carried outby undertakings which arefamiliar with all the
undertakings is mentioned
precautions to be taken inorder to protect workers.
DIRECTIVE 2009/148/CE Royal DECREE 396/2006
2. Articule 6 a) 3. Art. 7.a. Organizational
The number of workersmeasures
The employer in all activitiesEMPLOYERexposed or likely to beexposed to dust arising from asbestos or materials
The employer, in all activitiesreferred to in Article 3.1, shalltake the necessary
EMPLOYER
asbestos or materialscontaining asbestos must be limited to the lowest
ymeasures to ensure that:a) the number of workerslimited to the lowest
possible figure; exposed or likely to beexposed to asbestos fibersor materials containing themor materials containing themis the strict minimum.
DIRECTIVE 2009/148/CE Royal DECREE 396/2006
3 Articule 4 point 23. Articule 4, point 2
The activities referred to inA notification system is
The activities referred to inArticle 3(1) must be coveredby a notification system
not mentioned.Activities under the scope of the RD are notified when theby a notification system
administered by theresponsible authority of the
the RD are notified when the Plan of Work is presented for
approval.Member State.
approval.
DIRECTIVE 2009/148/CE Royal DECREE 396/2006
4. Articule 13, point 1 Artícule 11.1, p
A plan of work shall be The employer shall preparel f k b f
pdrawn up before demolitionwork or work on removing
a plan of work before anywork with asbestos riskexposure is startedasbestos and/or asbestos-
containing products frombuildings structures plant or
exposure is started.
buildings, structures, plant orinstallations or from ships isstarted.sta ted
DIRECTIVE 2009/148/CE Royal DECREE 396/20065 Articule 13 point 3 A tí l 11 2 d5. Articule 13, point 3
At the request of the
Artícule 11.2.d.
The plan of work mustAt the request of the competent authorities, the plan referred to in paragraph
The plan of work must include the starting date and the expected duration of the
1 must be notified to them before the start of the
j t d k
pwork.
projected work.
DIRECTIVE 2009/148/CE Royal DECREE 396/20066. Articule 15
Before carrying out WHAT IS RERA?
demolition or asbestos removal work, firms must provide evidence of their
Evidence of their ability isnot mentioned
provide evidence of their ability in this field. The evidence shall be
We have the RERA as replacementevidence shall be
established in accordance with national laws and/or
replacement
practice.
RERA: • It´s a register with no
supporting documentssupporting documents.• No cost involved.• The application form ispp
just only one page.• 20 minutes to fill in, let a
CCompany to carry outworks with asbestos riskafter the performance ofafter the performance of the Plan of Work.
Asbestos Removal Companies RD 396/2006
RERA article 17RERA article 17
Plan of Work article 11
RERA 2008 2009 2010 2011 2012 2013 2014
Companies registeredCompanies registeredfrom 1985 to 1661 2117 2408 2771 3038 3460 3713
New Companies 259 510 299 387 274 429 256Registered 259 510 299 387 274 429 256
Deregistered 75 54 8 24 7 7 3
1 1 477 COMPANIES REGISTERED IN 231. 1,477 COMPANIES REGISTERED IN 23 YEARS (1985 – 2008)
2. 2,236 NEW COMPANIES REGISTERED ONLY IN THE LAST 7 YEARSONLY IN THE LAST 7 YEARS
3. In Cataluña > 800, Andalucía > 600, Madrid > , ,250, etc.
1. No Company authorization or certification system exists in Spain, just a registering process.
2 The easy and with no cost registering process2. The easy and with no cost registering process produces a large amount of companies that may carry out works with risk of asbestos exposure.out works with risk of asbestos exposure.
3. Large amount of companies registered means a large quantity of workers exposed.
4. Large amount of companies registered means that competent Authorities have problems to control or inspectinspect.
5. The Plan of Work is a requirement established in Europe, not only in Spain. However, no other toolsEurope, not only in Spain. However, no other tools determine the ability of the Companies exist in Spain.
A d i ki ithAnedes is working with Aenor (the Spanish Association forAssociation for Standardisation and Certification) developing the Spanish Standart for the cualification of this