At-Berth Regulation webinar for Terminal and Vessel Plan Updates
April 29, 2013
![Page 2: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/2.jpg)
2
Agenda
Vessel Plan Overview
Terminal Plan Overview
Status of Terminal Upgrades
Questions & Answers
![Page 3: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/3.jpg)
3
Vessel Plan Requirements
• Plan is due to ARB July 1, 2013• Forms available at Shorepower page at
arb.ca.gov• Submit Plan to [email protected]
![Page 4: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/4.jpg)
4
Who is Affected
• Affects fleets making 25 or more visits annually to a California port
• What is affected fleet?– Vessels owned or chartered– Liner may have separate fleets for each port– Ports of Los Angeles and Long Beach considered
one port
![Page 5: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/5.jpg)
5
Example Fleet
![Page 6: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/6.jpg)
6
Form 1 General Information
Table 1A
![Page 7: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/7.jpg)
7
Form 1 General Information
Table 1B
![Page 8: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/8.jpg)
8
Form 2 – Vessel InformationReduced Onboard Power Generation
Table 2A
![Page 9: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/9.jpg)
9
Form 2 – Vessel InformationReduced Onboard Power Generation
Table 2B
![Page 10: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/10.jpg)
10
Vessel Plan Summary
• Plan is due to ARB July 1, 2013• Form is available online:
– www.arb.ca.gov/ports/shorepower/forms/forms.htm
• Form can be submitted by either:
Mail:California Air Resources BoardStationary Source DivisionProject Assessment Branch,Energy SectionP.O Box 2815Sacramento, CA 95812
E-Mail:[email protected] the following subject: “Terminal Plan Update for (Terminal Operator) at the Port of (Port)” and fill in the (parentheses)
![Page 11: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/11.jpg)
11
Agenda
Vessel Plan Overview
Terminal Plan Overview
Status of Terminal Upgrades
Questions & Answers
![Page 12: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/12.jpg)
12
Purpose of Terminal Plan
• Outlines the infrastructure required for fleets to comply
• Provides terminal operators an opportunity to coordinate effort with vessel operators.
• Ensures terminals understand the compliance needs of a fleet
• Update checks that the projects are on schedule.
![Page 13: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/13.jpg)
13
Who must submit the plan
• Terminals that receive 50 visits or more from any of the following:– Container– Passenger– Refrigerated-cargo
• Ports may submit the plan on behalf of the terminal
![Page 14: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/14.jpg)
14
Confidentiality
Confidentiality Agreement Form available onlinewww.arb.ca.gov/ports/shorepower/forms/forms.htm#terminal
![Page 15: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/15.jpg)
15
Table 1 – General Information
![Page 16: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/16.jpg)
16
Table 2 – Terminal Visits
![Page 17: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/17.jpg)
17
Table 3 – Summary of 2009 Terminal Plan
![Page 18: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/18.jpg)
18
Table 4 – Status of Shore Power Implementation
![Page 19: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/19.jpg)
19
Terminal Plan Summary
• Form is available online:– www.arb.ca.gov/ports/shorepower/forms/forms.htm
• Plan is due to ARB July 1, 2013• Form can be submitted by either:
Mail:California Air Resources BoardStationary Source DivisionProject Assessment Branch,Energy SectionP.O Box 2815Sacramento, CA 95812
E-Mail:[email protected] the following subject: “Terminal Plan Update for (Terminal Operator) at the Port of (Port)” and fill in the (parentheses)
![Page 20: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/20.jpg)
20
Agenda
Vessel Plan Overview
Terminal Plan Overview
Status of Terminal Upgrades
Questions & Answers
![Page 21: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/21.jpg)
21
Shore Power Infrastructure
• Electrifies 3 berths on Wharf 1• 2 Tenants share 3 berths • $11.7 million Project Cost• Construction on Schedule
![Page 22: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/22.jpg)
22
Shore Power Construction Schedule
Project ScheduleJanuary 2013 Start of ConstructionJuly 2013 Switchgear delivery and installationOctober 2013 Finish Construction November 2013 Load Bank TestingDecember 2013 Project Completed
![Page 23: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/23.jpg)
23
AMP Berths Currently Operational
![Page 24: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/24.jpg)
24
Berths to be Constructed
![Page 25: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/25.jpg)
25
AMP Construction Schedule
![Page 26: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/26.jpg)
26
Total AMP Berths
![Page 27: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/27.jpg)
27
Shore Power Schedule
Terminal Berth Ready for Commissioning*
Pier A – SSA Marine
A90 October 2013A92 October 2013A94 October 2013
Pier G – ITS G236 August 2013
Pier J – Pacific Container Terminal
J245 December 2013J247 December 2013J266 November 2013J270 November 2013
Pier T – Total Terminals International
T132/134 December 2013T136 December 2013T138 September 2013T140 September 2013
*All shore power infrastructure and acceptance testing complete, including load bank testing
![Page 28: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/28.jpg)
28
Phase 1Berths: 56, 57, 58Construction Period: March 2011 – June 2012Grants: TIGER,MSIF
Phase 2ABerths: 25, 35, 37, 55, 59, 68Construction Period: May 2012 – June 2013Grants: Prop 1B
Phase 2BBerths: 30, 32Construction Period: May 2012 – June 2013Grants: Prop 1B, MTC
Shore Power Program
![Page 29: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/29.jpg)
29
Schedule of Key Activities – As of 4/29/13
Phase Construction Shore-Side Testing / Berth Commissioning
Vessel Commissioning Starts*
1(B56-58)
Completed Completed Dec 2012
2A(B25, 35, 37, 55, 59, 68)
May 2012 –Jun 2013
Jun – Aug 2013 Aug – Sept 2013
2B(B30-32)
May 2012 – Jun 2013
Jun – Aug 2013 Aug – Sept 2013
Berths 61/62 (constructed by APL/EMS)
Completed Completed Completed
Berth 24(constructed by Ports America)
In progress TBD TBD
* Depends on completion of berth commissioning and availability of vessels – could be earlier or later than shown here
![Page 30: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/30.jpg)
30
Cruise Ship Terminal
• Operational December 2010• Provides 12MW of power at three ship
berthing locations – B St. Pier – North – B St. Pier – South– Broadway Pier – North
![Page 31: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/31.jpg)
31
Tenth Avenue Marine Terminal
• Provide 3500 kW Power to Berth 10-2 or 10-3
Project ScheduleInfrastructure Construction December 2013 SDGE Service Construction November 2013 Testing and Commissioning December 2013 Project Completion January 2014
![Page 32: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/32.jpg)
32
Tenth Avenue Marine Terminal
![Page 33: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/33.jpg)
33
Agenda
Vessel Plan Overview
Terminal Plan Overview
Status of Terminal Upgrades
Questions & Answers
![Page 34: At-Berth Regulation webinar for Terminal and Vessel Plan Updates](https://reader036.vdocument.in/reader036/viewer/2022062323/568163e6550346895dd54916/html5/thumbnails/34.jpg)
34
Questions?
ARB: [email protected] or (916) 327-1512 Ports:• Hueneme: [email protected]• Los Angeles: [email protected] or (310) 732.7649• Long Beach: [email protected] or (562) 283-7750• Oakland: Delphine Prévost (510) 627-1141• San Diego: [email protected]• San Francisco: [email protected]