Transcript
Page 1: B1 UNIT 3 B1 UNIT 4 B1 UNIT 5 · 2020. 7. 15. · 1 0 0 0 clear 1000 clear opening B1 UNIT 3 B1 UNIT 4 B1 UNIT 5 LIFT TERRACE TERRACE TERRACE 3 ROOF PLAN 2nd fl window added 29.03.10

in responce to right of light

APPROX. FLOOR AREAS:

B1 UNIT 3: 131 SQ M (72+59)

B1 UNIT 4: 130 SQ M (70+60)

B1 UNIT 5: 200 SQ M (109+91)

NOTE:

OPTION AVAILABLE TO EITHER HAVE 3 DUPLEX OFFICE UNITS OR 6 SEPARATE OFFICE UNITS (3 ON EACH FLOOR)

Serv

ice

Ris

er

8 Person lift1500 x 1500 m

m

(Part M m

in. requirem

ents)

1500 x 1500 mmunobstructedturning space

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000 clear opening

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000 clear opening

B1 UNIT 3 B1 UNIT 4 B1 UNIT 5

LIFT

TERRACE

TERRACETERRACE

PROJECTORANGE

t 020 7566 0410 f 020 7566 0411

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

Date Init. Revision

2nd Floor Block E Morelands,5–23 Old Street, London EC1V 9HL

NOTES

THE COPYRIGHT DESIGN AND PATENTS ACT 1988THIS DRAWING IS THE COPYRIGHT OF PROJECTORANGE Ltd AND MUST NOT BE COPIED OR REPRODUCED, IN WHOLE OR PART, BY ANYMETHOD WHATSOEVER, WITHOUT THE PRIORWRITTEN APPROVAL OF PROJECT ORANGE Ltd

ALL SETTING OUT MUST BE CHECKED ON SITEALL LEVELS MUST BE CHECKED ON SITEALL DIMENSIONS MUST BE CHECKED ON SITEDO NOT SCALE FROM THIS DRAWINGTHIS DRAWING MUST NOT BE USED ON SITEUNLESS ISSUED FOR CONSTRUCTION

192 SHOREHAM STREETSHEFFIELD, S1 4SQ

SECOND/ THIRD FLOOR & ROOF

RC 19.03.101:200 @ A31:100 @ A1

0905 P 201 C

PROPOSED PLANS

SECOND FLOOR PLAN1

THIRD FLOOR PLAN2

Serv

ice

Ris

er

8 Person lift1500 x 1500 m

m

(Part M m

in. requirem

ents)

1500 x 1500 mmunobstructedturning space

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000 clear opening

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000 clear opening

1000

cle

ar o

peni

ng

1000

cle

ar o

peni

ng

1000 clear opening

B1 UNIT 3 B1 UNIT 4 B1 UNIT 5

LIFT

TERRACE TERRACE

TERRACE

ROOF PLAN3

2nd fl window added 29.03.10 RC A

Courtyard elevation set-back 14.05.10 RS B

lift, service riser 27.05.10 RS C

Top Related