737.1
Center Tank Fuel PumpsCenter Tank Fuel PumpsTerry Sheehan
737NG Procedures ManagerBoeing Commercial Airplanes
May 2004
Terry Sheehan737NG Procedures Manager
Boeing Commercial AirplanesMay 2004
![Page 2: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/2.jpg)
737.2The Boeing Company
Hydro-Aire Fuel PumpsHydro-Aire Fuel Pumps
• Two areas of concern were identified on Hydro-Airefuel pumps installed on 737-600/-700/-800/-900 airplanes
– Wire chafing– Localized overheating
• Two separate Airworthiness Directives issued – Both mandated similar operational restrictions
• Two areas of concern were identified on Hydro-Airefuel pumps installed on 737-600/-700/-800/-900 airplanes
– Wire chafing– Localized overheating
• Two separate Airworthiness Directives issued – Both mandated similar operational restrictions
BackgroundBackground
![Page 3: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/3.jpg)
737.3The Boeing Company
BackgroundBackground
• In August 2002, teardown of several failed Hydro-Aire fuel pumps indicated the potential existed for wires to come in contact with the rotor as a result of installation errors
• Evidence of arcing due to chafed wires was discovered
• In August 2002, teardown of several failed Hydro-Aire fuel pumps indicated the potential existed for wires to come in contact with the rotor as a result of installation errors
• Evidence of arcing due to chafed wires was discovered
Wire ChafingWire Chafing
![Page 4: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/4.jpg)
737.4The Boeing Company
BackgroundBackgroundWire ChafingWire Chafing
![Page 5: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/5.jpg)
737.5The Boeing Company
BackgroundBackgroundWire ChafingWire Chafing
![Page 6: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/6.jpg)
737.6The Boeing Company
BackgroundBackground
• In response, the FAA released AD 2002-19-52 which mandated operational restrictions
• The AD provided terminating action– Inspection of pumps per Boeing or Hydro-Aire
Service Bulletin required prior to installation– Once center tank fuel pumps inspected and
found to be in compliance, the operational restrictions could be removed on an airplane-by-airplane basis
• In response, the FAA released AD 2002-19-52 which mandated operational restrictions
• The AD provided terminating action– Inspection of pumps per Boeing or Hydro-Aire
Service Bulletin required prior to installation– Once center tank fuel pumps inspected and
found to be in compliance, the operational restrictions could be removed on an airplane-by-airplane basis
Wire ChafingWire Chafing
![Page 7: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/7.jpg)
737.7The Boeing Company
BackgroundBackground
• In October 2002, evidence of extreme localized overheating in the area of the primer impeller was found on several in-service fuel pumps
• Further investigations indicated the potential for extreme over-temperature exposure outside the explosion proof chamber of the fuel pump existed
• In October 2002, evidence of extreme localized overheating in the area of the primer impeller was found on several in-service fuel pumps
• Further investigations indicated the potential for extreme over-temperature exposure outside the explosion proof chamber of the fuel pump existed
Localized OverheatingLocalized Overheating
![Page 8: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/8.jpg)
737.8The Boeing Company
BackgroundBackgroundLocalized OverheatingLocalized Overheating
![Page 9: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/9.jpg)
737.9The Boeing Company
BackgroundBackgroundLocalized OverheatingLocalized Overheating
![Page 10: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/10.jpg)
737.10The Boeing Company
BackgroundBackground
• The FAA released AD 2002-24-51 which reinstated the requirement to maintain minimum fuel levels to keep center fuel tank pump inlets covered
• No terminating action defined
• The FAA released AD 2002-24-51 which reinstated the requirement to maintain minimum fuel levels to keep center fuel tank pump inlets covered
• No terminating action defined
Localized OverheatingLocalized Overheating
![Page 11: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/11.jpg)
737.11The Boeing Company
BackgroundBackground
• In June 2003, the FAA issued Approval Letter 140S-03-189 to allow a “staged shutoff” following approved X-ray inspection of center tank fuel pumps
– Allows all fuel in the center tank to be used
• A Flight Crew Operations Manual Bulletin was released to provide operating instructions
– Either the AD procedures or the AMOC procedures to be used at the discretion of the airline
• In June 2003, the FAA issued Approval Letter 140S-03-189 to allow a “staged shutoff” following approved X-ray inspection of center tank fuel pumps
– Allows all fuel in the center tank to be used
• A Flight Crew Operations Manual Bulletin was released to provide operating instructions
– Either the AD procedures or the AMOC procedures to be used at the discretion of the airline
Alternative Method of Compliance (AMOC)Alternative Method of Compliance (AMOC)
![Page 12: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/12.jpg)
737.12The Boeing Company
Design ImprovementsDesign Improvements
• Original Master Caution system logic requires bothcenter tank fuel pumps to indicate low pressure before the Master Caution and FUEL annunciation illuminate
• With the new system logic, a low pressure condition for either center tank fuel pump will illuminate the Master Caution and FUEL annunciation
• Original Master Caution system logic requires bothcenter tank fuel pumps to indicate low pressure before the Master Caution and FUEL annunciation illuminate
• With the new system logic, a low pressure condition for either center tank fuel pump will illuminate the Master Caution and FUEL annunciation
Master Caution SystemMaster Caution System
![Page 13: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/13.jpg)
737.13The Boeing Company
Design ImprovementsDesign Improvements
• A center tank fuel pump is automatically shut off after approximately 15 seconds of continuous low pressure
– No indication to the flight crew
• Considered a backup to normal flight crew actions
• If fuel remains in the center tank, the system can be reset by turning the fuel pump switch OFF, then ON
• A center tank fuel pump is automatically shut off after approximately 15 seconds of continuous low pressure
– No indication to the flight crew
• Considered a backup to normal flight crew actions
• If fuel remains in the center tank, the system can be reset by turning the fuel pump switch OFF, then ON
Automatic ShutoffAutomatic Shutoff
![Page 14: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/14.jpg)
737.14The Boeing Company
Design ImprovementsDesign Improvements
• In the original design, the alert is displayed if the center fuel tank contains more than 1600 pounds/726 kilograms of fuel and both center tank pumps are producing low or no pressure
• In the new design, the alert will be displayed if the center tank contains more than 1600 pounds/726 kilograms of fuel and both center tank pumps are OFF
• In the original design, the alert is displayed if the center fuel tank contains more than 1600 pounds/726 kilograms of fuel and both center tank pumps are producing low or no pressure
• In the new design, the alert will be displayed if the center tank contains more than 1600 pounds/726 kilograms of fuel and both center tank pumps are OFF
CONFIG AlertCONFIG Alert
![Page 15: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/15.jpg)
737.15The Boeing Company
Revised Normal ProceduresRevised Normal Procedures
![Page 16: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/16.jpg)
737.16The Boeing Company
FAA ActionFAA Action
• Boeing has proposed the Master Caution system logic change and center tank fuel pump automatic shutoff feature as terminating action for AD 2002-24-51
• Boeing believes the FAA will mandate these changes and propose a 36-month compliance time after release of the Service Bulletin
• FAA decision is imminent
• Boeing has proposed the Master Caution system logic change and center tank fuel pump automatic shutoff feature as terminating action for AD 2002-24-51
• Boeing believes the FAA will mandate these changes and propose a 36-month compliance time after release of the Service Bulletin
• FAA decision is imminent
![Page 17: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/17.jpg)
737.17The Boeing Company
Design ImprovementsDesign Improvements
• All three design changes will be available in production in May 2004 (Line Number 1494 and on)
• Available via Service Bulletin in 4th Qtr 2004
• All three design changes will be available in production in May 2004 (Line Number 1494 and on)
• Available via Service Bulletin in 4th Qtr 2004
Availability – 737 NG Availability – 737 NG
![Page 18: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/18.jpg)
737.18The Boeing Company
Design ImprovementsDesign Improvements
• Master Caution system logic change will be available via Service Bulletin in 4th Qtr 2004
• Automatic shutoff feature will be available via Service Bulletin in 3th Qtr 2005
• Master Caution system logic change will be available via Service Bulletin in 4th Qtr 2004
• Automatic shutoff feature will be available via Service Bulletin in 3th Qtr 2005
Availability – 737-200 through -500Availability – 737-200 through -500
![Page 19: B737 center tank-fuel_pumps](https://reader034.vdocument.in/reader034/viewer/2022050701/54bd006f4a7959d94f8b458f/html5/thumbnails/19.jpg)
737.19The Boeing Company
Design ImprovementsDesign Improvements
• Wire retention system – Prevents wires from contacting rotor due to
installation errors– Scheduled to be available in 2nd Qtr 2005– Boeing is proposing this change as terminating
action for AD 2002-19-52
• Replacement fuel pump– Scheduled to be available in 24 to 36 months
• Wire retention system – Prevents wires from contacting rotor due to
installation errors– Scheduled to be available in 2nd Qtr 2005– Boeing is proposing this change as terminating
action for AD 2002-19-52
• Replacement fuel pump– Scheduled to be available in 24 to 36 months
Future Design FeaturesFuture Design Features