The National Construction Code Series
Changes to Building Code of Australia 2013
Victorian Building Authority
-
The National Construction Code Series
Volume One, Two and Guide to Volume One
-
BCA Adoption Date 1 May 2013
-
BCA REFERENCED DOCUMENTS
-
Referenced Documents
Transitional period completed
Transitional period commenced
Provision changes due to a
referenced doc.
Other referenced docs.
-
Referenced Documents
Transitional Period Completed
AS/NZS 1170 Structural design actions Part 2 Wind Actions 2011
AS 2870 Residential slabs and footings Construction 2011
-
AS/NZS 1170.2-2011 Structural design actions Wind
actions
Amendment 1 Correction Amendment
Minor amendments to correct errors to formula
Corrections to wind maps for both Australia and New
Zealand
Amendment 2 Revised Text Amendment
Changes to terrain categories and surface roughness for wind
approaching over water.
Changes to terrain-height multipliers for tropical-cyclone
regions.
-
Referenced Documents
Transitional Period Commenced
AS 1668 The use of mechanical ventilation and air-conditioning in buildings
Part 2 Mechanical ventilation for acceptable indoor-air quality 1991 and
AS 1668.2 2012 (New)
AS 2118 Automatic fire sprinkler systems Part 4 Residential 1995 Part 6 Combined sprinkler and hydrant 1995 and
AS 2118 Part 4 and Part 6 2012 (New)
-
AS/NZS 4055-2006 Wind Loads for Housing
and AS/NZS 4055 -2012
Definitions of terrain categories 1, 2 and 3 align with AS/NZS
1170.2-2011
Classification of water as terrain category 1 (aligns with
AS/NZS 1170.2)
A new terrain category (TC 1.5) applicable to wide bodies of
water where waves may contribute to roughness near
shorelines.
Cladding pressure zones are defined with additional guidance
for designers, tabulated for each of the pressure zones.
Referenced Documents
Transitional Period Commenced
-
Referenced Documents
Provision Changes
AS 1926 Swimming pool safety
Part 1 Safety barriers for swimming pools 2012
G1.1 and 3.9.3.0
(b) A child-resistant doorset must not be used in a barrier
for an outdoor swimming pool.
(c) A side hung door forming part of the barrier for an indoor
swimming pool must swing away from the pool area
Vic Variation for the use of AS 1926 Parts 1 1993 & Part 2 1995
to a Childrens service has been retained
-
AS 1926.1-2012 Swimming pool safety Safety barriers for swimming pools
Provides clarification on a range of matters related to swimming pool
fencing, particularly related to the Non-climbable zone (NCZ)
provisions
Provisions for glass used in barriers included for the first time (in
accordance with the provisions of AS 1288)
Incorporates for the first time provisions related to the design,
construction and operation of gate units installed as part of a barrier
(to supersede AS 2820-1993)
Provides updated requirements for loading and strength and rigidity
of barriers to assist manufacturers in designing and testing products
- Improved diagrams for clarity and ease of use and interpretation
-
Referenced Documents Provision Changes
AS/NZS 4505 Garage doors and other large access doors
B1.4 and 3.11.6
Applies to openings not more than 3 m in height in
external walls in wind region C or D
-
Referenced Documents
Provision Changes
AS/NZS 4654 Waterproofing membranes for external above ground use
Part 1 Materials Part 2 Design and Installation
F1.4 and 3.8.1.3
Waterproofing membranes for external above ground use
must comply with AS/NZS 4654 Parts 1 and 2
-
Referenced Documents
Provision Changes
Spec JV Clause 2
(iii) The internal heat gains in a building (A) From the occupants
(aa) 75 W per person sensible heat gain and 55 W
per person latent heat gain; or
(bb) Metabolic rate from Table 45 AIRAH-DA09; or
(cc) Heat emission rate from Table 6.3 CIBSE Guide A
-
New Provisions for Buildings in
Flood Hazard Areas
-
Courtesy of AusGrid
New and Amended BCA Definitions Relating to Flood Hazard Areas
Appropriate authority Defined flood event (DFE) Flood hazard area Defined flood level (DFL) Flood hazard level (FHL) Freeboard
Possible structural damage to a traditional design
-
Courtesy of AusGrid
New and Amended BCA Definitions Relating to Flood Hazard Areas
Appropriate authority means the relevant authority with the
statutory responsibility to determine the particular matter
Defined flood event (DFE) means the flood event selected for the
management of flood hazard for the location of specific
development as determined by the appropriate authority.
Flood hazard area means the site (whether or not mapped) encompassing
land lower than the flood hazard level which has been determined by the
appropriate authority.
-
Definition Defined Flood Level
Defined flood level (DFL) means the flood level associated with a
defined flood event relative to a specified datum
-
Definition Freeboard
Freeboard means the height above the defined flood level as determined by the
appropriate authority, used to compensate for effects such as wave action and
localised hydraulic behaviour
-
Flood Hazard Areas Performance Requirements
BP1.4 and P2.1.2:
A building in a flood hazard area, must be designed and
constructed to Resist flotation or collapse resulting from the action of
Hydrostatic; Hydrodynamic; Erosion and scour; Wind and other actions.
-
Flood Hazard Areas DtS
B1.6 and 3.10.3
The Deemed-to-Satisfy Provisions for buildings of Class 1, 2, 3, 9a,
9c or Class 4 parts of a building in a flood hazard area:
Must comply with the ABCB Standard for Construction of Buildings
in Flood Hazard Areas
-
ABCB Standard for Construction of Buildings in Flood Hazard Areas
-
ABCB Standard for Construction of Buildings in Flood Hazard Areas
Courtesy of AusGrid
Performance in BCA; DtS in Standard
Flood Hazard Area is an area subject to flooding during the
Defined Flood Event (DFE) as determined by the Appropriate
Authority
Standard does not override planning controls
-
ABCB Standard for Construction of Buildings in Flood Hazard Areas
Does not apply to areas subject to landslide, storm surge, coastal wave action
-
ABCB Standard for Construction of Buildings in Flood Hazard Areas
Standard limited to a maximum flow velocity of 1.5 m/s
-
Flood Hazard Areas Victorian requirements
Possibility of Provisions being deferred
May Require Regulation changes
To define Flood Hazard Level
Flood Hazard Areas = Land liable to flooding.
Determination of Velocities
Consultation with Appropriate Authority
-
Design Requirements for Buildings
Structural adequacy
Floor height requirement above the
Flood Hazard Level (FHL)
Enclosures below the FHL
Geotechnical considerations
-
ABCBs Non-Mandatory Information Handbook
-
Lift Provisions
Lift provisions relocated from AS 1735 Parts Performance Requirement to allow the use of lifts
for egress
-
Lift Related Changes Definitions
Electric passenger lift
Electrohydraulic passenger lift
Stairway platform lift
Inclined lift
Low-rise platform lift
Low-rise, low speed constant
pressure lift
Small-sized, low-speed automatic
lift
Part 2
Part 3
Part 7
Part 8
Part 14
Part 15
Part 16
-
Lift Related Changes Relocation
B1.4(m)
Lift shaft enclosure and safety
protection
Glazing thickness
-
Lift Related Changes Relocation E3.7 Fire service controls
Lifts serving any storey above 12 m must be provided with:
A fire control switch, complying with E3.9 for
A group of lifts; or
A single lift not in a group that serves the storey; and
A lift car fire service drive control switch, complying with E3.10
-
Lift Related Changes Relocation
E3.9
Fire Service Recall Control
Switch
E3.10
Lift Car Fire Service Drive
Control Switch
Located at a nominated
landing by appropriate
authority
Outside of the lift car
Located within the lift car
Operates the lift
-
Lift Related Changes Relocation
E3.9
Fire Service Recall Control
Switch
E3.10
Lift Car Fire Service Drive
Control Switch
-
Lift Related Changes Egress
Consideration of egress for all
occupants
To achieve reasonable
evacuation times alternative
strategies are being used
Some designs have been
approved using lifts for egress
-
Lift Related Changes Egress DP7
Where a lift is intended to be used in addition to the required
exits to assist occupants to evacuate a building safely, the
type, number, location and fire-isolation appropriate to
Travel distances
Characteristics of occupants
Use of the building
Number of storeys connected
Fire safety systems
Characteristics of the lift
Reliability of the lift
Emergency procedures
-
Lift Related Changes Egress DP7
DP7 is only mandatory if lifts are part of an Alternative Solution
Where a lift is intended to be used.to evacuate
Does not replace required exit stairways
Used in addition to the required exits
-
Lift Related Changes Egress EP3
-
Lift Related Changes Performance
-
Egress
Inserted new Performance
Requirement, DP7
D2.15 Thresholds
D2.17 Handrails
D2.21 Operation of latch
D3.6 Signage
-
Egress D2.15
The threshold of a doorway must not incorporate a step or
rampunless
(c) in a building required to be accessiblethe doorway
(i) opens to a road or open space; and
(ii) is provided with a threshold ramp or step ramp
-
Egress D2.17
Handrails in a required exit serving an area required to be accessible, must be designed and constructed to
comply with clause 12 of AS 1428.1
Clause 12 of AS 1428.1 relates to design and construction requirements such as
Encroachments
Cross-section details
Edge details
Handrail heights
Clearances
End details
-
Egress D2.21
Doors must be readily openableby a single hand downward actionand if serving an area required to be accessible:
Prevent the hand of a person who cannot grip from slipping
from the handle
Have a clearance between the handle and door of between
35mm and 45mm
-
Egress D3.6
Braille and tactile signage complying with Specification
D3.6 must identify each door required by E4.5 to be
provided with an exit sign and state
Exit; and
Level followed by the floor level number
Exit
Level 1
-
Openable Windows D2.24 and 3.9.2.5
New provisions for protection of openable windows,
applies to:
Only Bedrooms in Class 1, 2, 3 and Class 4 Part
Class 9b early childhood centre
-
Openable Windows D2.24 and 3.9.2.5
Current: 865 mm barrier for
openable window, when floor is 4 m
above surface beneath
New: Protection for openable
window, when floor is 2 m above
surface beneath in early childhood
centres and bedrooms of residential
buildings
-
Openable Windows D2.24 and 3.9.2.5
Current: 865 mm barrier for
openable window, when floor is 4 m
above surface beneath
New: Protection is required for
window openings below 1.7 m from
floor level
-
Openable Windows D2.24 and 3.9.2.5
A device to restrict the window
opening; or
A screen with secure fittings,
Not permit a 125 mm sphere to pass
through
Restrict a force of 250 N
Child resistant release mechanism if
screen or device is able to be removed
-
Openable Windows D2.24 and 3.9.2.5
A device to restrict the window
opening; or
A screen with secure fittings,
Not permit a 125 mm sphere to pass
through
Restrict a force of 250 N
Child resistant release mechanism if
screen or device is able to be
removed
< 125 mm
-
A device to restrict the window opening; or
A screen with secure fittings,
Not permit a 125 mm sphere to pass
through
Restrict a force of 250 N
Child resistant release mechanism if screen
or device is able to be removed
Openable Windows D2.24 and 3.9.2.5
< 125
mm
-
Energy Efficiency
-
Section J Application of Part
J1.1, J2.1, J3.1
Non-conditioned space removed from application
Envelope in broad terms refers to conditioned space or habitable rooms
Therefore non-conditioned spaces are excluded in the first instance
-
Defined Term Clarification Section J and Part 3.12
Defined term Solar Heat Gain Coefficient
(SHGC) changed to Total System SHGC
Defined term Total U-Value changed to
Total System U-Value
Ensures the whole system including glass
and frame are in the performance values
-
Concession for envelope walls Table J1.5(b)
Table J1.5(b) has been clarified
3 triggers for use of provision which
allows a concession to the Total R-Value
requirements:
- Ventilation
- Glazing
- Roof lights
Example of where provision
J1.5(b) could be applied
-
Fan Motor Power Part J5
Change to BCA definition of fan motor
power
Now includes motor input power
Changes to J5.2 including Table J5.2
-
Table J5.2 Maximum Fan Motor Power
Air-conditioning sensible heat
load
(W/m of the floor area of the
conditioned space)
Maximum fan motor power (W/m of the floor area of the
conditioned space)
For air-conditioning system
serving not more than 500m
For and air-conditioning
system serving more than
500m
Up to 100 4.1 5.3 6.4 8.3
101 to 150 7.3 9.5 10.4 13.5
151 to 200 10.5 13.7 14.1 18.3
201 to 300 17.1 22.2 21.5 28.0
301 to 400 23.6 30.7 28.4 37.0
Note: For more than 400W/m2 air-conditioning sensible heat load-
(a) in a building of not more than 500m2 floor area, use 0.097 W of fan motor power
for each watt of internal air-conditioning sensible heat load; and
(b) in a building of more than 500m2 floor area, use 0.1209 W of fan motor power for each watt
of internal air-conditioning sensible heat load.
-
Heating and Cooling Systems J5.4(b)(iii)
New Provision:
To allow the heating of a space via
electric heating if the capacity is not
more than 1.2 kW, in a Class 3 or 9c
building
-
Heating and Cooling Systems J5.4(b)(ii)(H)
The sub-clause has been relocated so that all forms of heating (A) to
(G) can be used in combination
-
Slab-on-ground Inclusion Spec J1.6
Figure 2 TYPICAL R-VALUES FOR FLOOR CONSTRUCTION
(for a floor without a floor heating or cooling system)
-
Artificial Lighting 3.12.5.5
Lamp Power Density = amount of energy used in the space by the
lamps alone, divided by the area of the space
Illumination Power Density = total amount of power that will be
consumed by the lighting systems in a space, divided by the area of
the space
-
Illumination Power Density 3.12.5.5(b)
1. W/m2 allowance for space =
2. Adjustment factor from Table 3.12.5.3 for device used =
3. 5 0.85 = 5.88 new W/m allowance for that space
-
Stormwater
-
Stormwater - Definitions
Average Recurrence Interval:
Amended to include a 5 minute duration rainfall intensity.
Average recurrence interval applied to rainfall, means the average or expected
interval between exceedances for a 5 minute duration rainfall intensity
Surface Water:
Amended to remove reference to water flowing from a drain, stream,
river, lake, or sea.
Surface water means all naturally occurring water, other than sub-surface water,
which results from rainfall on or around the site or water flowing onto the site
-
Stormwater FP1.3 and P2.2.1
A drainage system for the disposal of surface water resulting from a
storm having an average recurrence interval of
(i) 20 years must
(A) convey surface water to an appropriate outfall; and
(B) avoid surface water damaging the building; and
(ii) 100 years must avoid the entry of water into a building
-
Waterproofing and Water Resistance
-
Fire Compartments C2.5
-
External Columns Spec C1.1
Column B
-
Wash basin F2.3
F2.3 Facilities in Class 3 to 9 Buildings
(a) Sanitary facilities must be provided for Class
3, 5, 6, 7, 8 or 9 buildings in accordance with
Table F2.3.
(b) If not more than 10 people are employed, a
unisex facility may be provided instead of
separate facilities for each sex.
(c).
(i) Not less than one washbasin must be provided
where closet pans or urinals are provided
-
Corrosion Controls 3.4.2.2(a)(ii)
Additional option for corrosion
protection included for steel framing
outside the building envelope
AM150 (150 grams of
aluminium/zinc/magnesium per
square metre)
-
Defined Term Sole-Occupancy Units
-
Defined Term Sole-Occupancy Units
-
Proposed Changes for BCA 2014 Slip Resistance
Proposed changes are deferred for BCA 2014 consideration:
Due to the revision of the standard currently underway
To give industry time to prepare
Proposal to include:
Referencing AS/NZS 4586 (2013) for testing
Quantified non-slip, non-skid and slip-resistant to slip resistance
classification
-
REGULATORY AND OTHER MATTERS
-
VAGO OMBUDSMANS REPORTS
-
PROPOSED CHANGES ORGANISATIONAL
VICTORIAN BUILDING AUTHORITY
LEGISLATION CHANGES REQUIRED;
ESTABLISH A BOARD;
APPOINT A CEO;
APPOINT DIRECTORS AND OTHER STAFF IN THE NEW
STRUCTURE;
TIMING, LIKELY TO BE BY MID YEAR.
-
NEW AUDIT PROGRAM
OBJECTIVES OF THE NEW AUDIT PROGRAM
STATE-WIDE AND RISK BASED AUDITS
PHASE ONE AUDIT 1000 BUILDING PERMITS
COMPREHENSIVE CHECKLISTS
-
PROPOSED REGULATION CHANGES
Reg 415
Walls on boundaries
Height
Setback from boundary
-
Changes to solar hot water requirements
under Victorias 6 Star Building Standard
-
Current 6 Star Building Standard
New class 1 buildings are required to meet a minimum
of 6 Star thermal performance for the building fabric and
install either a solar water heater system (SWH) or
rainwater tank connected to all sanitary flushing
systems.
SWH and/or rainwater tank must be installed in
accordance with the Plumbing Regulations 2008.
-
Plumbing Amendment Regulations 2012
Plumbing Regulations 2008 recently amended:
updated reference to "AS/NZS 4234: 2008 Heated
water systems - Calculation of energy consumption,
and
changes to other SWH requirements
Due to commence on 19 April 2013
-
Changes to solar water heater requirements
Solar collector orientation
30 degrees east and
60 degrees west of
magnetic north
-
Changes to solar water heater requirements for new class 1 buildings
Modified solar collector inclination requirements for
SWH:
Inclination of 35
20 to Horizontal