BDH Engineering Zrt Budapest - Background
2
• Budapest Global Engineering Center (GEC) started in 2006
• Entity Status – Branch office of Balcke-Dürr GmbH
• Managed as shared engineering service since 2010
• Design Office supporting SPX Cooling Technologies, Balcke-Dürr, and SPX Heat Transfer
• Legal successor of Balcke-Dürr GmbH Hungarian Branch by a Business Transfer Agreement since 2017
• New company owned by the Management in 100%
• Current Status:
• 31 Employees (27 Engineers reporting hours)
• 21 Mechanical Engineers & 6 Civil / Structural Engineers (with several decades of design skills)
• Staff is to be extended as needed
• Capabilities:
• Mechanical Calculation / Design
• Solid Modeling – Creo, Tekla, Solid Edge, PDMS
• Piping Calculation / Design
• Structural Calculation
• Hungarian Nuclear Power Plant Certification and TBT certificate
• Design references in Paks 1 NPP (Hungary) and Paks2 NPP (Hungary), Loviisa and Olkiluoto NPPs (Finland), Forsmark and Oskarshamn NPPs (Sweden), Rostov NPP (Russia)
• Communatication skills:
• english
![Page 3: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/3.jpg)
Professional Software Knowledge
3
We are using different up-to-date high quality PC- softwares
• PDMS 3D plant (piping) design software
• Pro Engineer/CREO equipment design software
• XSteel steel structure design software
• AutoCad 2D/3D drawing software
• Rohr2 pipe stress analysis software
• Rstab steel structure analysis software
![Page 4: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/4.jpg)
Professional Software Knowledge
4
Thermal & Strength Calculation
• HTRI thermal calculation for heat exchangers
• Dimy strength calculation design software
• AxisVM concrete structure design software
• CAEpipe pipe design software
• SolidEdge equipment design software
• Design CodesDesign capability to customer specificationKnowledge of various codes including:EN, DIN-EN, ASME, AD-2000, TRD
![Page 5: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/5.jpg)
Main Activities in nuclear power plants
5
Component DesignPressure vessels (level vessels, collecting vessels, flash
tanks)
Design of piping systems
Civil Engineering
Steel StructureReinforced Concrete design
Manufacturing QA-survey and supervision
Site supports
Certificates, permissions, entry cards
![Page 6: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/6.jpg)
Component DesignPressure vessels (level vessels, collecting vessels, flash tanks)
6
- Process calculations for the components
- Strength and mechanical calculations
- 2D/3D model building
- Preparing workshop drawings
- Preparing transportation drawings
- Data supply for pipeline design
- Data supply for steel structure design
- LISTS: Weld lists; Material lists (BOM), etc.
- Site survey
- Designer support and supervision of factory manufacturing and construction checking
- Designer support and supervision of site erection and commissioning
![Page 7: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/7.jpg)
Forsmark NPP SwedenDesign of Level and Collecting Vessel
7
![Page 8: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/8.jpg)
Oskarshamn 2, SwedenDesign of HP - LP Level Vessel and Flash Tank
8
![Page 9: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/9.jpg)
Design of piping systems in various NPPs
9
• Forsmark TU1,2 NPP, Sweden (2006-2010)
Design of piping system connected to new Moisture Separator Reheater (MSR),
Design of Collecting & Level vessels
• Oskarshamn NPP, Sweden (2009-2013)Design of piping system connected to new MSR ,
Design of LP & HP heaters,
Design Collecting & Level vessels
• Paks NPP Unit 1-4, Hungary (2013)Basic design of new demineralized water system
• Loviisa NPP, Finland (2015)
Design of piping system connected to new MSR
• Olkiluoto NPP, Finland (2016-2017)Design of piping system of new steam-ejectors and condensers
• Paks NPP Unit 5-6, Hungary (2017)Basic design of Compressed air supply plant and Nitrogen supply plant
![Page 10: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/10.jpg)
Piping engineering and design activities performed
10
- 3D model with PDMS software
- Preparing isometrics
- Pipe support workshop drawings
- Special pipe elements, nozzle drawings
- Layout and cross section drawings
- Pipe strength and mechanical calculations
- LISTS: Weld lists; Material lists (BOM) (pipe, pipe support components, etc.), etc.
- Specifications: pipe elements, heat insulation, surface protection, components.
- Demolishing and cutting plans
- Civil load data supplies, drilling plans
- Hydraulic pressure loss calculation
- Site survey
- Designer support and supervision of factory manufacturing and construction checking
- Designer support and supervision of site erection and commissioning
![Page 11: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/11.jpg)
• ASME BPVC SECTION III. Rules for Construction of Nuclear Facility Components
• EN 13480 Metallic industrial piping
Nuclear Power Plants Regulations (Sweden)
• AFS 2010 Swedish Work Environment Authority
• KBM Edition 6.0 Quality Regulations for Mechanical Equipment
• TBM Edition 6.0 Technical Regulations for Mechanical Equipment
• TBY Edition 2 Technical Regulations for Surface Treatment
• SKIFS 2005 Swedish Nuclear Power Inspectorate’s Regulatory Code
• SSMFS 2008 Swedish Radiation Safety Authority Regulatory Code
Nuclear Power Plants Regulations (Finland)
• STUK Radiation and Nuclear Safety Authority
Nuclear Power Plants Regulations (Hungary)
• NBSZ Nukleáris létesítmények nukleáris biztonsági hatósági eljárásai
International and National nuclear codes and standards observed
![Page 12: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/12.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)Design of piping system connected to new MSR, Level and Collecting Vessel
12
MSR
LevelVessel
CollectingVessel
Level Vessel
SteelStructure
![Page 13: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/13.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)Design of piping system connected to new MSR, Level and Collecting Vessel
13
CollectingVessel
SteelStructure
CollectingVessel
MSR
LevelVessel
![Page 14: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/14.jpg)
14
Oskarshamn NPP, Sweden (2009-2013)Design of piping system connected to new MSR, LP & HP heaters, Collecting & Level vessels
![Page 15: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/15.jpg)
Oskarshamn NPP SwedenDesign of piping system connected to new MSR, LP Level vessels,
Flash Tank, Steel support structure
LP Turbine
HP Turbine
MSR
LP Level Vessel&
New Steel structure
Condenser
Flash Tank&
New Steel structure
LP Level Vessel&
New Steel structure
15
![Page 16: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/16.jpg)
16
Paks NPP Unit 1-4, Hungary (2013)
Basic design of new demineralized water system
![Page 17: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/17.jpg)
17
Loviisa NPP, Finland (2015)Design of piping connected to new MSR
MSR
MSR
MSR
MSR
![Page 18: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/18.jpg)
Olkiluoto OL1 & OL2 NPP Finland (2016-2017)Piping system for replacing Steam Jet Vacuum Ejectors and their Condensers
Condenser1
Condenser2
Condenser3
New steel structure
Partly new platform
Ejectors
18
![Page 19: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/19.jpg)
Olkiluoto OL1 & OL2 NPP FinlandDesign of piping connected to new Ejectors and Condensers
19
![Page 20: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/20.jpg)
Olkiluoto OL1 & OL2 NPP FinlandSteel support structure
20
![Page 21: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/21.jpg)
Olkiluoto OL1 & OL2 NPP FinlandDesign of piping connected to new Ejectors and Condensers
Site activity
21
![Page 22: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/22.jpg)
22
Paks NPP Unit 5-6, Hungary (2017)
Basic design of Compressed air supply plant
Service air compressors
Instrument air compressors
Service and instrument air dryers
![Page 23: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/23.jpg)
23
Paks NPP Unit 5-6, Hungary (2017)
Basic design of Compressed air supply plant
Air receivers
![Page 24: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/24.jpg)
24
Paks NPP Unit 5-6, Hungary (2017)
Basic design of Nitrogen supply plant
Cryogenic liquid nitrogen tanks
Low pressure atmospheric evaporators
High pressure atmospheric evaporators
Pipe rack
Compressed air building
![Page 25: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/25.jpg)
Civil engineering
in Nuclear Power Plants
25
![Page 26: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/26.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)
Steel structure 3D Tekla model
26
![Page 27: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/27.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)
Manufacturing QA-survey and supervision at Stahlbau Wendeler (Germany)
27
![Page 28: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/28.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)
Site activity at Forsmark (Sweden)
28
![Page 29: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/29.jpg)
Forsmark TU1, 2 NPP, Sweden (2006-2010)
Site activity at Forsmark (Sweden)
29
![Page 30: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/30.jpg)
Rostov 3 NPP Reinforced Concrete Design (2010)3D AutoCad (Rostov 3)
basin slab
inlet duct
riser
single columns
A-frames
wd channel
fill beams
grp fill support
wd pipes
wd beams
30
![Page 31: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/31.jpg)
31
Rostov 3 NPP Reinforced Concrete Design (2010)Pro-E 3D (Rostov 3)
![Page 32: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/32.jpg)
32
Rostov 3 NPP Reinforced Concrete Design (2010)Pro-E 3D (Rostov 3)
![Page 33: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/33.jpg)
Loads: (for example water load) mx STRESSES ON THE MODELL:
USED REINFORCEMENT IN BOTH DIRECTION
33
Rostov 3 NPP Reinforced Concrete Design (2010)Structural Analysis
![Page 34: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/34.jpg)
PDMS 3D
Pipe route&
equipment
TEKLA
Steel structure&
building
Oskarshamn NPP Sweden (2009-2013)Steel Structure Design
34
![Page 35: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/35.jpg)
35
Oskarshamn NPP Sweden (2009-2013)Manufacturing QA-survey and supervision at Kresta Industries (Austria)
![Page 36: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/36.jpg)
36
Oskarshamn NPP Sweden (2009-2013)Manufacturing QA-survey and supervision at Kresta Industries (Austria)
![Page 37: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/37.jpg)
37
Oskarshamn NPP Sweden (2009-2013)Site activity at Oskarshamn 2 (Sweden)
![Page 38: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/38.jpg)
38
PAKS NPP Steel Structure Design (2013)
Steel structure 3D Tekla model
![Page 39: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/39.jpg)
Olkiluoto Steel Structure Design (2016-2017)
Steel structure 3D model
39
![Page 40: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/40.jpg)
Olkiluoto Steel Structure Design (2016-2017)
Structural analysis
40
![Page 41: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/41.jpg)
Certificates, permissions, entry cards
41
Permissions & certificates
![Page 42: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/42.jpg)
42
Certificates, permissions, entry cards
Permissions & certificates
![Page 43: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/43.jpg)
43
Certificates, permissions, entry cards
Permissions & certificates
![Page 44: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/44.jpg)
44
Certificates, permissions, entry cards
Entry cards into Nuclear Power Plants
![Page 45: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/45.jpg)
Working together with the authorities
Inspecta for NNP (Sweden) Vattenfall (Sweden)
45
![Page 46: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/46.jpg)
Working together with the authorities
Approved document by Inspecta (Sweden)
46
![Page 47: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/47.jpg)
BDHE Budapest Office
• Space – 906 square meters
• Located in this office since 2006
47
![Page 48: BDH Engineering Zrt – Budapest International Nuclear Job ...bdhe.hu/documents/BDHE-NUC-2018-01-EN.pdf · • PDMS 3D plant (piping) design software ... -Specifications: pipe elements,](https://reader031.vdocument.in/reader031/viewer/2022022420/5a796bab7f8b9ad3658da708/html5/thumbnails/48.jpg)
Company Confidential 48
Thank you for your attention!