![Page 1: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/1.jpg)
Before you start:Delete this slide once finished
NOTE FOR ENTIRE POWERPOINT:• For accessibility compliance, each document should have a title, which can be added under the file > info >
properties section in PowerPoint. The current template has the title “Design Public Hearing Template”. Please change this to the appropriate project name. For ex. “Design Public Hearing: Whittier Bridge Replacement”
• Depending on your PowerPoint version you are using, the formatting may have changed on this template. Reformat as necessary
NOTE FOR ALL SLIDES:• Please read all the notes located at the bottom of each slide. They will provide individual instructions for each slide• Keep slides clean without too much text• The font size must be at a minimum size of 20. Anything smaller will be difficult for the audience to see.• The font type must be apart of the “Eras” collection• Assign team members who will complete PPT to ensure narrative flow and voice consistency• Consider “bull pen slides” to address FAQ. “Bull pen slides” should follow after traditional presentation and should be
based on anticipated questions or concerns; Maps and/or diagrams or project area may be useful to address questions;
Remember MassDOT Accessibility standards:• Use the Accessibility Checker to find errors. Go to the “File” Tab. Then, “Check for Issues” and “Check Accessibility”• Avoid patterned backgrounds• Avoid layered graphics• Avoid animations• Include Alternate Text with each photo, chart/table, or shape. Alternate text helps screen readers understand info
presented in pictures and other objects. To add alternate text: 1) Right click the picture, shape, or other object and select the format command. 2) Switch to the Alt Text tab. 3) Type a description of the photo into the Title and Description text boxes.
• Never use the Tab key to separate lists of text into columns within a single text box. • Any video from the PowerPoint presentation must have synchronized captions• Any audio content must have a transcript
![Page 2: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/2.jpg)
Welcome! Project Name
Location | Project File No.
TYPE OF MEETINGLocation
Date | Time
![Page 3: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/3.jpg)
Introduction• MassDOT Project Manager • Process Facilitators
Project NameLocation | Project File No.
![Page 4: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/4.jpg)
History of Public Outreach• Meeting held to-date• Working group/task force?
Project NameLocation | Project File No.
![Page 5: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/5.jpg)
Project NameLocation | Project File No.
Project TeamMunicipalityProject Proponent
Consultant Engineering FirmResponsible for Design
MassDOT’s Highway DivisionResponsible for administering the Design Process and providing Resident Engineer Services
Federal Highway AdministrationResponsible for Oversight
![Page 6: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/6.jpg)
Project Area
Project LocationLimits of Work or Study Area
Project NameLocation | Project File No.
![Page 7: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/7.jpg)
.Why do we need
this project?
Project NameLocation | Project File No.
![Page 8: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/8.jpg)
Existing Issues
• Congestion• Cut-Through Traffic• Intersection Safety• Structurally Obsolete Bridge• Deficient Pedestrian Accommodation• Drainage
Project NameLocation | Project File No.
![Page 9: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/9.jpg)
Existing Issues (cont.)
Project NameLocation | Project File No.
![Page 10: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/10.jpg)
Project Goals• Congestion | Relieve Congestion • Cut-Through Traffic | Reduce Cut-Throughs• Intersection Safety | Improve Inter. Safety• Structurally Obsolete Bridge | Replace Bridge• Deficient Bike Accommodation | Improve Bike Accom.• Drainage | Reduce Flooding
Project NameLocation | Project File No.
![Page 11: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/11.jpg)
Project Scope
• What is being done?• What type(s) of work are involved to fix it?• What improvements are being made?
Project NameLocation | Project File No.
![Page 12: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/12.jpg)
Project Schedule
25% Design Submittal
Date
Design Public HearingDate
100% Design Submittal
Date
Construction Starts Date
Project NameLocation | Project File No.
![Page 13: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/13.jpg)
.How will trafficbe affected?
Project NameLocation | Project File No.
![Page 14: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/14.jpg)
ALERT: Traffic Impacts
• Lane closures?• Alternative routes?• Road closures?• Ramp reconfiguring?
Project NameLocation | Project File No.
![Page 15: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/15.jpg)
Alternatives
• Relate alternative to project goals• Clearly state limitations or constraints: Time, Funding,
Historic, Right-of-Way• Show alternative(s) compliance with applicable MassDOT
guidelines
Project NameLocation | Project File No.
![Page 16: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/16.jpg)
Proposed Improvements
• Truthful cheerleading is good – enthusiasm helps• Clearly explain benefits for: All modes of travel; Abutters; Local
business; Environmental• Show existing and proposed cross-section: Google SketchUp or
other 3D rendering tool. When showing future conditions, cue off existing landmark as reference point
Project NameLocation | Project File No.
![Page 17: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/17.jpg)
Environmental Permitting
• MEPA/NEPA• Section 106• Chapter 9.1• USCG Bridge Permit• Explain which agencies have
oversight• Explain how community
members can participate
Project NameLocation | Project File No.
![Page 18: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/18.jpg)
.
Next Steps/MeetingPublic Information Meeting, Location, Date
Project NameLocation | Project File No.
![Page 19: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/19.jpg)
Contact Information
• Provide:- Mail-in comment sheets- Contact Person; Email Address; Phone Number- Project website (if applicable)
Project NameLocation | Project File No.
![Page 20: Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can](https://reader035.vdocument.in/reader035/viewer/2022062409/56649ce55503460f949b3159/html5/thumbnails/20.jpg)
Thank YouQ&A
Project NameLocation | Project File No.
TYPE OF MEETINGLocation
Date | Time