Belmont Park Area (South River Road & 3rd Street South)
![Page 2: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/2.jpg)
Flood History
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
1900 1905 1910 1915 1920 1925 1930 1935 1940 1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 ?
Maxim
um D
aily F
low
Rate
(cub
ic-fe
et p
er se
cond
)
Red River of the North at Fargo, North Dakota
500-Year Flood
The 2009 flood is the largest flood
on record and equates to a
50-Year Flood Event.
Source: USGS river flow data from USGS Station
Approximate Major Flood Stage
● 16 flood have exceeded the "Major Flood Stage" since 1900.
● 8 of the 16 "major" floods have
occurred since 2000 through 2014.
100-Year Flood Event
![Page 3: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/3.jpg)
Now Effective Floodplain o 39.4 Feet River Gage (29,300 cfs) o Approx. 2,051 Impacted Structures o Approx. 7,500 Impacted properties o 27,600 Acres Impacted o After Diversion – This elevation will be
close to 500-year flood levels Flood of Record
o 40.8 Feet River Gage o $70M expended to flood fight
Future of the Floodplain o USACE 41.1 River Gage (34,700 cfs) o Approx. 19,400 Impacted Structures o 36,430 Acres Impacted
Changing Flood Risk
“If I am in a community that we come back five years down the road and they are still talking about a project, I am probably going to change the map then,” said Federal Emergency Management Agency’s (FEMA) Deputy Associate Administrator for Mitigation, Roy Wright. (April, 2015)
![Page 4: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/4.jpg)
Effective 39.4 RG USACE 100 year no Diversion (41.1 RG)
2,051 Structures Affected 19,400 Structures Affected
![Page 5: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/5.jpg)
![Page 6: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/6.jpg)
Developed in Fall 2011/Winter 2012 Certifiable Protection From the Effective Floodplain
(39.4 Feet) Funding limitations require prioritization Outstanding Issues
- With Comprehensive Plan completed would still need: o 7.6 miles of emergency clay levees o 3.2 miles of sandbag levees
Comprehensive Plan
With a functioning diversion during a 100 year flood event the flow through town would not exceed 35’ therefore the comp plan levees would not be necessary
With a functioning diversion during a 500 year flood event the comp plan levees would be needed to protect against river elevations that exceed 40’
![Page 7: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/7.jpg)
183 Properties Purchased o Over 320 since 1990
At cost of over $60 million Cass County purchased 14 additional homes needed Diversion Authority is in process of acquiring 17
additional properties within Fargo Remaining Properties Under Comprehensive Plan o 121 properties to be acquired o Approximately $36 million
Property Acquisitions (Since 2009)
![Page 8: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/8.jpg)
Since 2009 over 19 miles of levees constructed
Approximate Costs o Construction - $125 million o Sand Bags Reduced by approx. 4.5 million o 50% of Comprehensive Plan Completed
Completed Flood Projects North
![Page 9: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/9.jpg)
Since 2009 over 19 miles of levees constructed
Approximate Costs o Construction - $125
million o Sand Bags Reduced by
approx. 4.5 million o 50% of Comprehensive
Plan Completed
Completed Flood Projects South
![Page 10: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/10.jpg)
In Progress Projects Combination of projects under construction
or under design for 2016/2017 construction o 12 City of Fargo Led o 7 Diversion Authority Led
Over 3.5 miles in progress City Project Cost ≈ $68.5 million o Construction Cost ≈ $37million
65% of the Comprehensive Plan completed once these projects are done
![Page 11: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/11.jpg)
Remaining Projects Approx. 10 miles remaining
o *excludes Cass County 20 Area Project Cost ≈ $130 million
o # Does not include south side line of protection o # Does not include 2016 planned projects o # Does not included Diversion Authority More Flow
Through Town Projects Type of Projects:
o Levees along River & Legal Drains o Road Raises
• Includes Interstate 29 at Drain 27 92% of the Comprehensive Plan would be completed
![Page 12: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/12.jpg)
Voluntary Buyouts Negotiations
Land Acquisition Overview
![Page 13: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/13.jpg)
Project Location – Belmont Park Area Flood Mitigation
14th Ave S
Oakland Ave S
15th Ave S
Elmwood Ave S
4 th St S
3 rd St S
Linden Ave S
![Page 14: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/14.jpg)
Provide flood protection from FM-14-02 (near WTP) south to Lindenwood Drive/3rd Street South intersection
Relocation of Lift Station 13 (Phase I) o Roger Maris Dr/Lindenwood Dr S
Earthen Levee/Floodwall - 2,800 feet (Phase II & III) Utility relocations o Public - Water, storm sewer, sanitary sewer o Private - Electric, cable, telephone, gas, etc.
Storm sewer improvements and gatewell Provide protection to 100-year flood elevation (903’)
Project features
![Page 15: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/15.jpg)
Geotechnical Stability Why is it important? Earth loads from levee and/or floodwall impact stability of adjacent land Corps and certification requirement Minimum requirements for design and engineering practices must be met o Freeboard o Embankment protection and foundation stability o Settlement o Interior drainage
Public safety
![Page 16: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/16.jpg)
Geotechnical Stability
Comprehensive Plan Setback - Based on limited borings and general assumptions - Every project must evaluate
geotechnical stability - Project Setback
- Rapid drawdown along steep slopes controls
![Page 17: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/17.jpg)
Geotechnical Stability
Belmont Levee Rapid Drawdown stability model results
WSE = 903.0’ 1.2
![Page 18: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/18.jpg)
Geotechnical – Rebuild Temporary Levee
- Buried topsoil - High organic material (>3%) - No inspection trench
![Page 19: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/19.jpg)
Alignment Options
![Page 20: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/20.jpg)
Alignment Options
![Page 21: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/21.jpg)
Alignment Options
![Page 22: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/22.jpg)
Alignment Options
![Page 23: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/23.jpg)
Alignment Options
![Page 24: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/24.jpg)
Alignment Options
![Page 25: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/25.jpg)
Alignment Options
![Page 26: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/26.jpg)
Alignment Options
![Page 27: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/27.jpg)
Alignment Options
![Page 28: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/28.jpg)
Alignment Options
![Page 29: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/29.jpg)
Easement Boundaries
![Page 30: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/30.jpg)
Estimated project cost*: o Levee only - $2.9M o Levee and floodwall - $3.4M
*Land acquisition not included
Estimated Project Cost
![Page 31: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/31.jpg)
Why build levee if Diversion Project is constructed? o Levee will provide real/interim flood protection o Levee will be compatible with the Diversion Project by providing protection on the greater than 100 year
flood events o Levee + Diversion = Increased level of flood protection
Will I be assessed for this levee project? o No – levee is being designed and constructed with Fargo Infrastructure Sales Tax Dollars, as well as
dollars from the State
Frequently Asked Questions
![Page 32: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/32.jpg)
May 12, 2016 – 1st Public Meeting Construct Phase I (Lift Station #13) – 2016 Design/Construct Phase II – 2016/2017 Construct Phase III - 2018
Next Steps
![Page 33: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/33.jpg)
Questions
![Page 34: Belmont Park Area - Fargo, ND](https://reader034.vdocument.in/reader034/viewer/2022051507/627e70e2107a7f32a537e5c4/html5/thumbnails/34.jpg)
Alignment Options