BETTER SOLUTIONS
KMS : PRESS KMS : PRESS Transport/InstallationTransport/Installation
2006.08.302006.08.30
1.1. Project Overview Project Overview
2.2. Project Execution ScheduleProject Execution Schedule
3.3. Ocean Transportation Ocean Transportation
4.4. River TransportationRiver Transportation
5.5. Inland TransportationInland Transportation
6. Site installation and commisioning6. Site installation and commisioning
Contents
BETTER SOLUTIONS
BETTER SOLUTIONS
1.Project Overview
Manufacturer & Supplier : Rotem Company / WIA Corporation (Korea)
Site : KIA Motors Slovakia (Zilina, Teplicka site)
KMS Equipment List
Shipment Description WT(Ton) CBM FOB Date
1st shipment 5,400T Press & Auxiliaries 4,086 9,113 2005.09.30
2nd shipment 5,400T Press 2,814 6,104 2005.12.30
Total 6,890 15,217
Transport Schedule : Masan Rotterdam/Constanza Rinz Zilina (sea : 25~35d duration) (river : 15d) (land : 10d)
Installation/Commissioning : Press #1st + Aux.–‘05.12~’06.01 / ‘06.01~04 프레스 #2nd – ‘06.03~05 / ‘06.05~07
BETTER SOLUTIONS
2. Project Execution Schedule2. Project Execution Schedule
Schedule’05 year ’06 year
junjuly
aug
sep
oct nov dec jan feb mar apr may jun july aug
presentation(6/29)
Proposal letter
Final quotation
contracting
Contract (exec.co)
final Packing list
Transportation(1st)
Installation/trial(1st)
Transportation(2nd)
Installation/trial(2nd)
BETTER SOLUTIONS
3. Detail schedule for ocean transportation
shipment
(changwon)
trucking
masan
(to load)
loading
(bulker)
Ocean transpor
t
(bulker)
discharging
(rotterdam)
barging
Barge transport
(danube)
discharging,on truck,custom
clearance
(rinz)
Inland transport
(rinz-zilina)
KMS
Deliver to
factory
custom clearance
(zilina)
Installation &
commisioning
25
3
Normal : 61d
short : 55d
35
13
4Transport duration
(departure~custom clearance)
33
Rotem BMI(SSU)
BETTER SOLUTIONS
3-1. Shipment scope
Requirement at the time of loading
party working scope
ROTEM
documents : Invoice, Packing list, export license, insurance
inland trucking & storaging
warehousing & inport shuttle
in time sailing (rotem & wia)
final cargo readiness : end of aug.
BMI(SSU)
charter vessel
berth arrangement
loading
issue B/L
transport shcedule management
BETTER SOLUTIONS
3-2. Loading operation
loading operation
BETTER SOLUTIONS
3-3. Route and duration of ocean transportation
Suez
Constanza
Rotterdam
Masan Typical Liner (35days)
Charter vessel (25days)
BETTER SOLUTIONS
3-4.1 Vessel spec. & transit time (Typical Liner)
Vessel Type : Typical Liner
(Multi-purpose heavy lift)
Gross tonnage : 24,000Ton
Net tonnage : 11,000Ton
Length(Over All) : 200M
Breath(Mid) : 28M
Depth(Mid) : 15M
Mouldet Draft/Dwt : 11M/30Ton
Built : Year 2004
Classification : G. Lloyd + 100 A5 E
Cargo Hold : No.1~5 Hold with Tween Deck
Speed : 18~20 Knots
BETTER SOLUTIONS
3-4.2 Vessel spec. & transit time (Charter Vessel)
Vessel Type : Multi-purpose heavy lift
Gross tonnage : 9,000Ton
Net tonnage : 5,000Ton
Length(Over All) : 120M
Breath(Mid) : 20M
Depth(Mid) : 12M
Mouldet Draft/Dwt : 9M/20Ton
Built : Year 2000
Classification : G. Lloyd + 100 A5 E3
Cargo Hold : No.1~2 Hold with Tween
Deck
Speed : 15 Knots