![Page 1: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/1.jpg)
How will the competition work?
![Page 2: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/2.jpg)
Intellectual property
![Page 3: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/3.jpg)
Online bid submission
![Page 4: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/4.jpg)
Assessors
![Page 5: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/5.jpg)
Technical partners
![Page 6: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/6.jpg)
www.gov.uk/dstl/cde
![Page 7: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/7.jpg)
Beyond battery powerSmall, lightweight, modular power generation for unmanned systems
Technology challenge
![Page 8: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/8.jpg)
• proposals for novel solutions to the challenge• 700 Wh/kg for around 48 hours• consider a system approach and integration aspects• cost effective, reliable, robust• demonstration of proposed concept• detail the acoustic and thermal signature• further optimisation
What we want
![Page 9: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/9.jpg)
• proposals solely based on batteries or capacitors• nuclear technologies• literature reviews• paper-based studies• marginal improvements to existing capabilities• demonstrations of existing off-the-shelf• proposals that lack a clear benefit to defence
What we don’t want
![Page 10: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/10.jpg)
Phase 1• up to £750,000 • typically £40 - 80,000• projects up to 9 months in duration• research complete by December 2017 • proof-of-concept demonstration• phase 2 proposal
![Page 11: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/11.jpg)
Phase 2
• up to £750,000 available
• projects up to a maximum of 12 months
• collaborations encouraged
• only open to projects funded at phase 1
![Page 12: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/12.jpg)
Competition dates
Webinar
5 December 2016
![Page 15: Beyond battery power - how the competition will work](https://reader035.vdocument.in/reader035/viewer/2022070516/587295721a28ab36118b73a3/html5/thumbnails/15.jpg)
Competition closes
Feb
1
1 February 2017 at 5pm
5