Download - BIKE PARKING - City of Davis
UP DN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
2 CUBIC YARDBIN
UPDN
REF.
2 CUBIC YARD BIN2 CUBIC YARD BIN
2 CUBIC YARD BIN
DEERING DESIGNSITE PLANNINGURBAN DESIGNLANDSCAPE ARCHITECTURE
26395 Carmelo St.Carmel, CA 93923
(530) [email protected]
www.deeringdesign.comCalif. LA #1976
Nevada LA #150
FORDIN/CAL 3, INC.
STERLING 5th STREET APARTMENTS2100 5th StreetDavis, California
DATES
SHEET NO.
OF
BIKE PARKING
15 30 45 60 75
SCALE: 1"=30'& CIRCULATION
NORTH
15
151515
15
15 10
15
10
5
105
5
10
265
10
L-34
02/29/16
BIKE PARKING
- The Market Rate bike parking facilities are distributedthroughout the buildings, near entrances to thebuildings, and in the parking garage.
- Within the buildings, off the interior hallways nearunits on each floor. Numbers of racks are shownnearby - stacks indicate how many floors havematching storage.
- Near building entrances, racks provide convenientground-level parking.
- In the garage, centrally located and secured. Easyaccess to a centrally located elevator.
- The Affordable project has bike parking within thebuilding on the upper floors locations near the centralelevator (not shown here because this is the groundfloor plan).
BIKE CIRCULATION
- The 5th Street separated bike path will be theprimary route from both projects to shopping,Downtown and UC Davis.
- The Emergency Vehicle Access (EVA) entry off 5thStreet will act as the primary route through project tobike parking facilities.
- The site plan encourages bike and auto traffic toaccess parking facilities on opposite sides of theproject. Autos will primarily access the parking garagefrom the East drive, while bikes will likley use the Westdrive.
- The West Drive (EVA) will be striped for bikes so thatautos are aware of and expect regular bike traffic.
03/03/16
04/08/16
5
15
5
10
03/07/17
DEERING DESIGNSITE PLANNINGURBAN DESIGNLANDSCAPE ARCHITECTURE
26395 Carmelo St.Carmel, CA 93923
(530) [email protected]
www.deeringdesign.comCalif. LA #1976
Nevada LA #150
FORDIN/CAL 3, INC.
STERLING 5th STREET APARTMENTS2100 5th StreetDavis, California
DATES
SHEET NO.
OF
BIKE ROUTES
15 30 45 60 75
SCALE: 1"=30'
NORTHL-4
4
02/29/16
03/07/17