![Page 1: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/1.jpg)
Bill Worthen, FAIA, LEED AP BD+C Founding Principal, Urban Fabrick, Inc.
URBANFABRICK.COM/BLOG COPYRIGHT 2014 URBAN FABRICK, INC ALL RIGHTS RESERVED
SAN DIEGO CONVENTION CENTER EXPANSION
The Future of Designing (with) Water understanding water use and reuse in buildings
![Page 2: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/2.jpg)
Despite our Mastering of Engineering
![Page 3: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/3.jpg)
SPRAWL
There are limits to any scale.
![Page 4: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/4.jpg)
All water is a resource.
SOURCE: J.S. GUEST
![Page 5: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/5.jpg)
Being more efficient with our water supply is just the first step.
![Page 6: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/6.jpg)
Its more than just specifying ‘low-flow’ fixtures. Design really does matter.
![Page 7: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/7.jpg)
Effective water use and re-use at scale requires us to think differently about design.
MINT PLAZA, SAN FRANCISCO CMG LANDSCAPE ARCHITECTURE
![Page 8: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/8.jpg)
Look for the left-overs.
SOURCE: SFPUC NON-POTABLE WATER PROGRAM GUIDEBOOK SFWATER.ORG
SAN FRANCISCO PUBLIC UTILITIES COMMISSION NON-POTABLE WATER PROGRAM SFWATER.ORG/INDEX.ASPX?PAGE=686
![Page 9: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/9.jpg)
The Yuck Factor. Perception is not reality.
![Page 10: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/10.jpg)
TECHNOLOGY: Tidal Flow Wetland (Living Machine)
![Page 11: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/11.jpg)
TECHNOLOGY: Membrane Bio-Reactor (AquaCell)
![Page 12: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/12.jpg)
TRANSBAY TRANSIT TERMINAL TRANSBAY JOINT POWERS AUTHORITY
181 FREMONT HELLER MANUS ARCHITECTS
SAN FRANCISCO PUBLIC UTILITY HEADQUARTERS
KMD/STEVENS ARCHITECTS 181FREMONTSF.COM TRANSBAYCENTER.ORG SFWATER.ORG/INDEX.ASPX?PAGE=583
RECENT AND CURRENT PROJECT WORK
ON SITE WATER REUSE SYSTEMS SAN FRANCISCO CASE STUDIES
![Page 13: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/13.jpg)
HIGH PERFORMANCE INTEGRATED PROJECT DELIVERY
STANDARD PRACTICE
BUSINESS AS USUAL
COLLABORATIVE PROFESSIONAL PRACTICE DESIGN AND CONSTRUCTION TIMELINE
Integrative Project Delivery – Performance Based Design-Build
Spend more time up front as a team working through the design ‘on paper’ with all project stakeholders.
Spend less time on change orders,
conflicts and field coordination.
SOURCE: DESIGN ART+SCIENCE
TIME
TIME
BUILD DESIGN
PRO
JECT
BRI
EF
CON
CEPT
SCHE
MAT
IC
DESI
GN
DEVE
LOPM
ENT
CON
STRU
CTIO
N
DOCU
MEN
TS
BIDD
ING
CON
STRU
CTIO
N
COM
MIS
SIO
NIN
G
OCC
UPA
NCY
& U
SE
![Page 14: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/14.jpg)
TIME
SOURCE: WWW.SF-PLANNING.ORG/INDEX.ASPX?PAGE=2557 Connecting the dots. Complex problem solving at scale.
FUTURE READY SYSTEMS AND SUSTAINABLE INFRASTRUCTURE
CENTRAL SOMA ECO-DISTRICT
SF-PLANNING.ORG
![Page 15: Bill Worthen FAIA LEED AP BD+C Founding Principal, Urban ... · DESIGN AND CONSTRUCTION TIMELINE Integrative Project Delivery – Performance Based Design-Build Spend more time up](https://reader034.vdocument.in/reader034/viewer/2022043020/5f3c94bf95ff517b0f081e53/html5/thumbnails/15.jpg)
Thank You
Bill Worthen, FAIA, LEED AP BD+C Urban Fabrick, Inc.
URBANFABRICK.COM/BLOG
COPYRIGHT 2014 URBAN FABRICK, INC ALL RIGHTS RESERVED
LIVING MACHINE AT 525 GOLDEN GATE SAN FRANCISCO PUC HEADQUARTERS
The Future of Designing (with) Water ARCHITECT Magazine January, 2014 Take the ten question quiz at Hanley Wood University and earn 1 hour of AIA LU/HSE Continuing Education Credit. HTTP://URBANFABRICK.COM/FUTURE-OF-DESIGNING-WITH-WATER/