Bob HarshbargerVolunteer
NAESB Update
January 16, 2013
Icy-Cold Salt Lake
![Page 2: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/2.jpg)
January 20, 2013
![Page 3: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/3.jpg)
Moment for Raymond
• What did the shy little pebble wish for most?
• To be a little boulder.
![Page 4: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/4.jpg)
4
• Wholesale Electric Quadrant (WEQ)o Joint Electric Scheduling Subcommittee (JESS)o OASIS Subcommittee (OS)o Business Practices Subcommittee (BPS)
North American Energy Standards Board (NAESB)
![Page 5: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/5.jpg)
5
• e-Tag 1.8.2 Functional Specification
• WEQ-004 Coordinate Interchange Business Practice Standards
• WEQ Electric Industry Registry Business Practice Standards
NAESB WEQ JESS
![Page 6: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/6.jpg)
6
• Modifications for Network Integration Transmission Service on OASIS
• Many other stuff
e-Tag 1.8.2 Functional Specification
![Page 7: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/7.jpg)
7
• Modified 6.1.1 Transaction Types to include Recallable
• Clarified ramp duration validation in 6.1.4. Included 2 graphics.
• Modified 6.1.5 to allow multiple PSEs and a single Transmission Service Provider (stacked tags).
• Modified 1.4.7 to reference a single Transmission Service Provider.
• Clarified processing of after-the-fact adjustments for DYNAMIC and PSEUDOTIE e-Tags in multiple sections
• Modified 6.1.1 definition of PSEUDOTIE transaction type
• Created Appendix B – After-The-Fact Timing Considerations
• Removed references to 168 hours and one hour durations and replaced them with a reference to Appendix B.
e-Tag 1.8.2 Functional Specification
![Page 8: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/8.jpg)
8
• Created Appendix C – XML e-Tag examples
• Clarified ramp overlap and assorted related topics.
• Modified Section 6.1.5 for tagging of NITS Resources.
• Modified Section 4.6.1.2 to allow any Market Operator on the Physical Path to adjust the Market Level Profile.
• Deleted Interchange Transaction definition; added Tagged Transaction definition in Section 1.2.
• Added Section 1.7, Service Transfers
• Added Creating Purchasing Selling Entity (CPSE) definition
e-Tag 1.8.2 Functional Specification
![Page 9: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/9.jpg)
9
• Modifications to Timing Table including Order 764 support
• Corresponding changes related to NERC INT Rewrite effort (Project 2008-12)
• General clean-up
WEQ-004 Coordinate Interchange Business Practice Standards
![Page 10: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/10.jpg)
10
• Develop business practice standards to drive functionality of the EIR and behavior of its users.
• Also this year, o absorb the WECC registry into EIRo phase-out CSV and mdb publication formats –
end state is XML publications
WEQ Electric Industry Registry
![Page 11: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/11.jpg)
11
• Pre-emption/competition
NAESB WEQ OS
![Page 12: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/12.jpg)
12
• Parallel Flow Visualization
NAESB WEQ BPS
![Page 13: Bob Harshbarger Volunteer NAESB Update January 16, 2013 Icy-Cold Salt Lake](https://reader036.vdocument.in/reader036/viewer/2022070305/55150de6550346a87d8b494e/html5/thumbnails/13.jpg)
Questions?