Booster Beam Notching PMG Meeting
Salah ChaurizeAugust 21, 2013
![Page 2: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/2.jpg)
Notching History• Notching is controlled removal of selected proton bunches
to facilitate a gap in the beam.• This gap allows the Booster extraction kickers magnetic
fields to reach full value to allow extraction of the remaining bunches.
• Without the gap or “notch” in the beam, the extraction kickers would displace these bunches in a non-controlled fashion causing losses in the extraction region
• In the past “notching” was less critical due to lower beam intensities and lower beam duty cycles. Losses were tolerable.
![Page 3: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/3.jpg)
Longitudinal distribution of 3 removing (red), circulating (green) and survival at notching (blue) bunches, and long (1.08m) and short (0.54m) notchers waveform at Long-13, and 1.08-m notcher waveform for Long-05 straight section.
December, 2011 A.Drozhdin
![Page 4: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/4.jpg)
The Notch/Gap3 Bucket Notch Width
non-cogged Cycle Notch @ 400MeV Cogged Cycle
Notch @ ~700MeV
Extraction Loss
Gap
![Page 5: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/5.jpg)
Booster Kicker Notching Plans
• Phase I– Create a Horizontal Notch scheme to deposit beam at L13 using existing
Notching magnet systems.– Reduce losses to sensitive locations such as gradient magnets and RF
cavities.– Phase I is complete.
• Phase II– Improve notch kicker rise time to allow cleaner gap clearing and emmittance
growth of bunches adjacent to the cleared bunches.– Build new short kickers and fast pulser to drive faster notch producing
system.– Magnets building in progress. Kicker power system building underway. – Phase II is in progress.
![Page 6: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/6.jpg)
Notching Pre-Shutdown 2012– A 3 bucket gap is created using two kickers located at Long 5
and Long 12• Notcher – A High Voltage(55kV) Kicker at Long 5• Noker - Lower Voltage Kicker (20-40 kV) at Long 12
– Used to clean out remnant notched beam in bucketsAt ~700 MeV due to Cogging operations.
– Beam is kicked vertically into Gradient Magnet dipoles at L5 and L12. Some notched beam reaches the collimator region at Long 6 and beam pipe mask at Long 13. This is not optimal
– Non-cogged notched cycles occurs at ~400 MeV.– Cogged notch cycles occurs at ~700 MeV.
![Page 7: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/7.jpg)
Notching Magnets at Long 5 and Long 12 Pre-Shutdown 2012
Notcher
Hor. Pinger
De-commissioned Horz. Pinger
Ver. PingerNoker
MKS04
Beam direction
L12 Pre-2012 Shutdown L5 Pre-2012 Shutdown
Beam direction
![Page 8: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/8.jpg)
December, 2011 I.Tropin
Residual dose profiles, vertical cross section (30 days irradiation/1day cooling, mSv/hr).
Vertical notcher
Notching at Long 5 Pre-shutdown
![Page 9: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/9.jpg)
Booster Kicker Notching Plans
• Phase I– Create a dedicated region to deposited 3 bunches of beam to produce
a extraction kicker rise time gap.– Use current CX1168 thyratrons and PS systems to drive 3 kickers that
kick Horizontally rather than vertically. – We implemented a three kicker system to go into Long 12 and Long 13
as the absorber regions.– This first phase is completed. Notched beam has been achieved with
this new horizontal configuration. – Further orbit tuning and timing adjustments will continue as we
commission MI beam.
![Page 10: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/10.jpg)
Horizontal position of 3-σ circulating beam and removed beam at notching for magnetic field of two horizontal notchers of B=67Gauss at 400 MeV (top) and
two notchers of B=72.5Gauss plus one notcher of B=35.2Gauss at 700 MeV (bottom).
Three horizontal notchers at Booster Long-12 with beam dump at Long-13 straight section.
August, 2011 A.Drozhdin
![Page 11: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/11.jpg)
Three notchers with field of B=62 Gauss. The aperture of Short-12 straight section should be increased to R>86mm to eliminate losses. This can be done by displacement of R66.5mm aperture (without BPM) by dX=20 mm. [46.5-86.5]mm
Y
Short-12
dX=70mm
400MeVCirculating beam
3σ (ε=18π)
Dump-13
X Red – 30π, green - 18 π
August, 2011 A.Drozhdin
![Page 12: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/12.jpg)
Long-13: Loss SimulationsDecember, 2011 I.Tropin
Side view
Top view
![Page 13: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/13.jpg)
![Page 14: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/14.jpg)
Reason to redesign S12 Spool piece
• Need to kick beam horizontally at L12 to create a notch in the beam.
• Horizontal aperture is current 4.5 in at S12• Maximum aperture through Booster Short
Corrector is about 5 in. • Current aperture restriction at S12 is BPM plates
and upstream and down stream bellows which are all 4.5in.
![Page 15: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/15.jpg)
Reason to redesign S12 Spool piece
• New Extra Wide aperture BPM will give us 5 in aperture with new spool.
• New spool would use original spool design without the standard BPM components inside and larger aperture spool bellows
![Page 16: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/16.jpg)
Extra Wide Aperture BPM
![Page 17: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/17.jpg)
Short 12 Corrector Spool Upgrade
New 5” Aperture Spool Standard aperture 4.5 Inch
New Extra wide BPM Standard BPM inside
![Page 18: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/18.jpg)
Notching Post ShutdownPhase I
– A 3 bucket gap is created using three Long kickers located at Long 12
• 3 Notcher – High Voltage(46-54kV) Kickers at Long 12• Notcher PS converted to NOKA PS• Noker PS converted to NOKB PS• Built/Commissioned new NOKC PS mostly with parts on
hand.– Beam is kicked Horizontally into new absorber at Long 13 – Extra Wide Aperture BPM and Short Corrector Spool needed
to allow kicked beam horizontal displacement before reaching absorber.
– Non-cogged notched cycles occurs at ~400 MeV.(unchanged)– Cogged notch cycles occurs at ~700 MeV.(Unchanged)
![Page 19: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/19.jpg)
L12 Post Shutdown
NOKCMKS04
NOKBNOKA
![Page 20: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/20.jpg)
12-13 sections of Booster tunnel.
Long-13
Long-12
Kick at L12 to Aisle.
![Page 21: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/21.jpg)
Long 13 Notched beam absorber
Beam direction
Before
After
![Page 22: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/22.jpg)
Long 13
Beam direction
![Page 23: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/23.jpg)
Long 13 Actual new absorber
![Page 24: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/24.jpg)
Current ConfigurationIn East Gallery
NOKA
NOKB
NOKC
![Page 25: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/25.jpg)
Current Configuration In East Gallery
NIM Gate Modules Altera Based
CAMAC Controls and Ramp Cards
LeCroy Delay modules & CAMAC Trigger
![Page 26: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/26.jpg)
Notching turned On and OffExtraction loss monitor
Notching off
Notching on
Beam Charge
![Page 27: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/27.jpg)
400 MeV Notched beamAbsorber in operational position
![Page 28: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/28.jpg)
400 MeV Notched beamAbsorber Retracted
![Page 29: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/29.jpg)
700 MeV Notched beamCurrently
![Page 30: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/30.jpg)
Preliminary Results and Commissioning
![Page 31: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/31.jpg)
Phase II• Current BKED (Long) design kicker have a rise time of about 35ns • Short BKEF kicker modules are about half as long. They will
produce a rise time of about 25ns.• The voltage propagation time through the short kicker is cut from
20ns to 10ns due to half length.• Two short kickers will rise faster with appropriate pulser to reach
a desired flatop value.• We will use a ANU style pulser using a CX2610 hydrogen thyratron
rather than the existing CX1168 tube. This new pulser we gain us about 8-15ns of rise time.
• One Pulser can drive 4 magnets, possibly 6.
![Page 32: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/32.jpg)
Phase II
• C. Jensen and J. Biggs along with EE support group is currently working on acquiring and building an ANU style pulser.
• Pulser components will be built through out 2013.
• We hope to have one pulser operating in a test configuration by the end of 2013.
• We will try to convert one long kicker to a pair of 2 short kickers as soon as feasible(2013/14)
![Page 33: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/33.jpg)
C. Jensen
![Page 34: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/34.jpg)
New Short kicker PS RackFront/Back view
EE Support currently building System
![Page 35: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/35.jpg)
New Pulser for Short BKEE/BKEF Kicker Example(ANU Pulser Test Unit)
![Page 36: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/36.jpg)
1Long Kicker BKED Series
2 Short Kicker BKEE Series
![Page 37: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/37.jpg)
Conclusion
• Horizontal Beam notching is working.• Estimated notched beam power max is about
250watts which is half the budgeted power loss for Booster. The New L13 notched beam Absorber gives us 50% more head room on lost beam power. This helps towards future 15Hz. Operations
• Phase II should give us further improvements towards 15Hz. Operations.
![Page 38: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/38.jpg)
Thanks to:-L13 Notched Beam Absorber Assembly-
PPD Experiment Fabrication- L13 Absorber Build and AssemblyD.Erickson, J. Judd, W. Blaszynski, W. GatfieldV. Sidorov - L13 Absorber Mechanical Design
APC Energy Deposition Simulations by- N.Mokhov, I. Tropin, S.Drozhdin M. Coburn L13 Absorber Motion Controls
-L12, S12, L13 Upgrade Support-Mechanical Support/ Instrumentation Groups – L13/S12 BPM and Corrector
R. Reily, B. Ogert, J. Kubinski, J. Briney ,D. Wallace, J. FitzgeraldControls Group CAMAC modules
Booster Techs - Power supply and load reconfiguration New timing module build and support electronics R. Mraz, T. Boes, D. Dick
Operations - Database work , O. Marshall, R. JonesAMG-L12, S12,L13 alignment
Radiation Safety – Joel FulghamConsultation – J. Lackey, B. Pellico
Machine Shop, Welding ShopMany More I missed
![Page 39: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/39.jpg)
END
![Page 40: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/40.jpg)
Reserve Slides
![Page 41: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/41.jpg)
Looking upstream towards L13
Before After
![Page 42: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/42.jpg)
Short Kicker/ Power Supply Effort
• Purpose of short kicker is to reduce kicker magnet rise/fill time.
• We can improve rise time of magnet field from current ~32nsec to about 25nsec.
• This will improve beam bunch removal with reduced disturbance of bunches intended for extraction.
![Page 43: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/43.jpg)
New Short Kicker Pulser Control and PS racks location. East Booster Gallery
![Page 44: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/44.jpg)
BKEE02(Short Module)Voltage ~40kV
![Page 45: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/45.jpg)
BKED012(Long Module)Voltage ~40kV
![Page 46: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/46.jpg)
BKEE001Short42KV Noker
BKED012Long42KVNoker
Channel 1 V inChannel 2 VoutChannel 3 Load I
![Page 47: Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013](https://reader035.vdocument.in/reader035/viewer/2022062911/5a4d1bfb7f8b9ab0599ec344/html5/thumbnails/47.jpg)
Preliminary finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower)
Testing by Jensen, Chaurize