![Page 1: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/1.jpg)
Commissioner Polly Trottenberg, New York City Department of TransportationNovember 1, 2016
BQE Atlantic to Sands Project Update
![Page 2: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/2.jpg)
2
THE PROJECT TEAM
Robert Collyer, P.E. Deputy Commissioner for Bridges
Tanvi Pandya, P.E. Senior Program Manager
Keith Bray Brooklyn Borough Commissioner
Joannene Kidder Executive Director of Community Affairs
For questions and concerns:
Email: [email protected]
www.facebook.com/BQEAtlantictoSands
![Page 3: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/3.jpg)
3
AGENDA1. NYS Highway System – Built vs. Unbuilt
2. Recent Pavement Repairs
3. In‐Depth Inspection Findings• Concrete Arches• Multigirder Structures• Cantilever Structures
4. Ongoing Traffic Study
5. Upcoming Steps
![Page 4: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/4.jpg)
4
THE 21 BRIDGES
Atlantic Avenue Interchange
![Page 5: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/5.jpg)
5
NYS HIGHWAY SYSTEM
BuiltArterials and highway systems meeting current standards and included in NYS system.
Un‐BuiltExisting or proposed main routes that have not been upgraded to current standards or included in NYS system.
NYS Highway Law Section 349 Established List of Routes to be included in the system (passed in the 1940s)
![Page 6: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/6.jpg)
6
RECENT PAVEMENT REPAIRSSections of the BQE roadway were repaired and repaved during the overnight hours
Queensbound: July 19 ‐ July 23
Staten Island bound: July 24 ‐ July 31
Base Repair
Milled Surface
![Page 7: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/7.jpg)
7
IN DEPTH INSPECTION Inspection Goals• Identify issues needing immediate intervention• Determine strength and useful life of BQE bridges
Inspection Findings• No immediate concerns, including the triple cantilever discovered after 5 months of
in‐depth inspection. • Structure is nearing end of service life, major rehabilitation or replacement planning
must begin or major disruption for repairs can be expected in 10‐12 years
![Page 8: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/8.jpg)
8
IN DEPTH INSPECTION Inspection Process • Hands‐on inspections• Testing of concrete cores and few rebars• Load Carrying Capacity Analysis
Access opening
Concrete coring
![Page 9: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/9.jpg)
9
INSPECTION - CONCRETE CORES
Test for following items
• Freeze Thaw Durability: Indication of concrete structure’s durability
• Chloride Content : Higher chloride content increases rate of corrosion
• Compressive Strength: Indication of capacity of structure
![Page 10: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/10.jpg)
Non‐Destructive Testing*: Various measurements which provide indication of corrosion rates cracks and moisture penetration
Ground Penetrating Radar to locate rebars
Linear Polarization Resistance to obtain
corrosion rates
Pavers were removed for testing on the Promenade
then replaced once completed
10*Focused in Triple Cantilever Area
NON DESTRUCTIVE TESTING
![Page 11: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/11.jpg)
11
BRIDGE TYPES Findings broken into three types of Bridges within the project
• Concrete Arches• Multigirder Structures• Cantilever Structures
Concrete Arch
MultigirderCantilever
![Page 12: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/12.jpg)
CONCRETE ARCHES
12
![Page 13: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/13.jpg)
13
CONCRETE ARCH LOCATIONS
BQE over Prospect St (ramp)
BQE over Pearl St
BQE over Adams St
BQE over Jay St
Concrete arches are all located at the north end of the project
![Page 14: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/14.jpg)
14
INSPECTION FINDINGS ARCHES
Top of Deck
• Cracked Barriers
• Uneven Pavement
Under deck• Exposed
Reinforcement
• Corroded Steel Mesh
• Leakage
![Page 15: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/15.jpg)
15
CONCRETE ARCHES – SUMMARY
Analysis findings:
Adequate Load Carrying Capacity
Durability Results:• High Chloride content• Low freeze‐ thaw performance• Good strength Prospect St
Ramp
Pearl St Jay St
15
![Page 16: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/16.jpg)
MULTIGIRDER STRUCTURES
16
![Page 17: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/17.jpg)
17
MULTIGIRDER STRUCTURES
BQE over Washington St
BQE over Old Fulton St
BQE over Cadman Pl E
Columbia Heights over
BQE
BQE over Prospect St
BQE over Sands St
Locations of Multigirder structures
17
![Page 18: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/18.jpg)
18
INSPECTION FINDINGS – TOP OF DECK
• Spalled/ uneven pavement• Leakage through joints
Plates at Columbia Htsbridge
18
![Page 19: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/19.jpg)
19
INSPECTION FINDINGS – UNDERDECK
Wire Mesh Corrosion from Leakage
19
Temporary Supports
![Page 20: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/20.jpg)
20
INSPECTION FINDINGS – RETAINING WALLS & SUBSTRUCTURE
• Deterioration at bearings• Granite anchor corrosion
20
![Page 21: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/21.jpg)
21
MULTIGIRDERS – SUMMARY
Analysis findings:
Adequate Load Carrying Capacity
Durability Results:• High Chloride content except at Sands St• Low freeze‐ thaw performance except
Sands St• Good strength except at Columbia Hts
Sands St
Prospect St
Columbia Heights
21
![Page 22: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/22.jpg)
CANTILEVER STRUCTURES
22
![Page 23: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/23.jpg)
19
TYPES OF BRIDGES: CANTILEVER
BQE WB over Furman St
Brooklyn Promenade
BQE EB over WB
BQE WB over Furman St
BQE EB over WB
BQE over Joramelon St
BQE over York St
Locations of Cantilever structures
INSPECTION FINDINGS– UNDERDECK
23
CANTILEVER STRUCTURES
![Page 24: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/24.jpg)
24
CANTILEVERS
Joramelon St
Triple Cantilever York St
24
![Page 25: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/25.jpg)
TRIPLE CANTILEVER
Staten Island Bound BQE
Queens Bound BQE
Promenade
Furman Street
25
![Page 26: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/26.jpg)
26
ACCESS INTO CANTILEVER - EXTERIOR
Access Removing concrete for access
Removing Granite
26
![Page 27: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/27.jpg)
ACCESS INTO CANTILEVER: INTERIOR
Formwork left in place Transverse Access being created
Underdeck looking upwards
Underdeck
27
![Page 28: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/28.jpg)
ACCESS INTO CANTILEVER: INTERIOR
Internal Diaphragm
Wall
Underdeck
Internal Diaphragm
Underdeck
Typical Joint with Leakage 28
![Page 29: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/29.jpg)
CANTILEVER– SUMMARY
Analysis findings:
Adequate Load Carrying Capacity
Leaking joints
Durability Results:• High Chloride content• Low freeze‐thaw performance • Cores indicate good strength
29
Live Load : Moving LoadsDead Load: Permanent Loads
![Page 30: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/30.jpg)
INSPECTION SUMMARY
30
Inspection Findings• No immediate safety issues• Durability concern due to high chloride penetration and poor freeze thaw results
• Prevalent joint leakage • Columbia Heights deck need monitoring • Loss of façade exposes structure to the elements
Bottom line• Condition slightly better than anticipated ‐ concrete is good • Rehabilitation/replacement project must begin now to ensure long‐term safety and avoid service disruptions in the 10‐12 yrs
• Inspection findings will provide design team with critical information
![Page 31: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/31.jpg)
WHERE WE ARE NOW
• Consultant selection • Inter‐agency coordination with
transportation partners • Traffic data collection and modeling
31
![Page 32: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/32.jpg)
31
TRAFFIC STUDY
32
Project Area• Detailed Data Collection of traffic patterns, lanes, signals etc.• Provide baseline information for Design Team• Thorough understanding of local traffic pattern• Data collection on‐going
Model Development• Create model to reflect regional traffic pattern• Combine data from above with other regional information• Model will assist in decision making for construction staging and permanent configuration
![Page 33: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/33.jpg)
31
TRAFFIC STUDY – PROEJCT AREA
Detailed traffic data in project
vicinity.
33
![Page 34: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/34.jpg)
32
TRAFFIC STUDY - BROADER MODEL DEVELOPMENT
Compilation of data for regional model.
Similar to Manhattan(previously completed)
34
![Page 35: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/35.jpg)
33
ANTICIPATED PROJECT DESIGN SCHEDULE
Design Proposals Review/Selection On‐goingEnvironmental Review/Design Start Early 2017Alternative Analysis/Draft EIS 2018Preliminary Design Completion 2019
Decision Point – Design/Build or Design‐Bid‐Build
Pre‐Designer
Design‐Build Entity
Designer
Contractor
Owner/Agency
Owner/Agency Owner/Agency
DESIGN‐BID‐BUILD Vs. DESIGN‐BUILD
35
![Page 36: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/36.jpg)
34
ANTICIPATED PROJECT SCHEDULE
36
![Page 37: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/37.jpg)
ELECTED SUPPORTMay 10, 2016Commissioner Matthew J. DriscollNew York State Department of Transportation50 Wolf RoadAlbany, NY 12232
Dear Commissioner Driscoll:We write to ask that the State contribute 38% of the total estimated cost for the Brooklyn Queens Expressway (BQE) Bridge reconstruction project on Interstate 278 (I-278). This funding is necessary for the rehabilitation, reconstruction, and replacement of 1.5 miles of the BQE from Atlantic Avenue to Sands Street.The BQE is a vital connection for the New York City metropolitan area, carrying more than 190,000 vehicles per day. The 1.5 miles between Atlantic Ave. and Sands St. is supported by 21 bridges and a 0.4 mile portion is comprised of a Triple Cantilever structure.According to NYCDOT, the total estimated cost of the project is $1.7 billion. A 38% contribution would cover $659 million of this cost. This contribution level would be consistent with what NYCDOT has said the State has traditionally funded for construction work on City-owned portions of the highway system in New York City, including the Belt Parkway over the Ocean Parkway project, and for protection of the FDR Drive against marine borers.The City and State have already invested billions of dollars in other portions of the BQE, including the Kosciusko Bridge. This section of the BQE, as described by NYSDOT, “is a critical link of I-278, which is the sole interstate facility in Brooklyn connecting the Robert Kennedy Memorial Bridge (previously named the Triborough Bridge), the Bronx and other points to the east, and the GowanusExpressway, Staten Island, New Jersey and other points to the west.” Comprehensive investment, including in this portion, is critical to ensuring the BQE can continue to serve New Yorkers as it has done for decades.We believe the State should contribute to the cost for reconstruction of this portion of the BQE. Thank you for your attention to this matter. Please contact Senator Squadron’s office at 718-875-1517 or [email protected] with any questions.
![Page 39: BQE Atlantic to Sands Project Update… · Pearl St BQE over Adams ... Concrete arches are all located at the north end of the project. 14 INSPECTION FINDINGS ARCHES Top of Deck •](https://reader033.vdocument.in/reader033/viewer/2022042404/5f1bafcfe635ac493f7a4725/html5/thumbnails/39.jpg)
Commissioner Polly Trottenberg, New York City Department of TransportationNovember 1, 2016
BQE Triple Cantilever Project Update