G T L Infrastructure Limited
General Information:
Circle District Bhadrak
Site Name Bramahnigaon Cluster Baleswar
Site Id ORS/GBT/A/04953 Site Status Radiating
Tower Type : GBT Lat
Tower Height Long
50
EB Availabilty yes EB Receipt Date
yes
Guard Room Completed YES
Boundary wall completed YES
Site Basic RFIE Date
Hand Sketch of Site layout / As Built YES / NO
Hand Sketch of Shelter eqpt spacing layout / As Built YES / NO
Operator details:
No of Operators 1 BTS Make Indoor BTS/ Outdoor BTS
Indoor BTS
Name of Operator - 1 Aircel
Name of Operator - 2
Name of Operator - 3
Name of Operator - 4
Name of Operator - 5
Name of Operator - 6
MW Antenna Size of MW Installed Height on tower Operator 1 0.6 46 Aircel
MW - 1
MW - 2
MW - 3
MW - 4
MW - 5
MW - 6
GSM antenna Installed Height on tower Operator
GSM antenna set -1 40 Aircel
GSM antenna set -2
GSM antenna set -3
GSM antenna set -4
MW equipement in MW rack
Operator - 1
Operator - 2
Operator - 3
Operator - 4
Operator - 5
Operator - 6
Operators material installed inside shelter Battery Bank SMPS 19" Rack Oper
Capacity & Numbers 1 1 1 AIRC
BTS Configuration (forexample - 2:2:2 or 1:1:1)
-
8/8/2019 Bramhanigaon Site Matrials List
2/6
G T L Infrastructure Limited
PLOT LAYOUT - AS BUILT
Things to be covered
1. Boundary of plot
2. Nearest Landmark
3. Location of Tower
4. North and Road L
5. Dimentions of Plo
-
8/8/2019 Bramhanigaon Site Matrials List
3/6
G T L Infrastructure Limited
Shelter Layout - As Built
Things to be covere1. Shelter equipmen
2. Distance between
3. Roxtec entry
.
-
8/8/2019 Bramhanigaon Site Matrials List
4/6
G T L Infrastructure Limited
Site Inventory Information
TOWERGBT / RTT/ Delta / Pole/ Monopole Height
GBT 50
Customer Height
3 1 AIRCEL 39
Customer Height
5 3 AIRCEL 40
Customer Height
Customer Height
Make Capacity
1 pacemaker
MakeCapacity
1 4
MakeCapacity
1
No. of DCDB installed at site MCB Details DCDB Spare DCDB
No. of ACDB MCB MCB Details of ACDB
YES
MakeCapacity
1
Shelter Make size
1
Servo Stabilizer MakeCapacity
N/a
Make
N/a
Glo Cool Installed at site
Total No of MW antenna installedon tower
No of MW antenna currently usedby Operators
No. GSM antenna installed ontower
No. GSM antenna used by existingOperators
No. Dual GSM antenna installed ontower
No. Dual GSM antenna used byexisting Operators
No. Dual GSM antenna installed ontower
No. Dual GSM antenna used byexisting Operators
No. of Air Conditionersinstalled
No. of Power plant installed atsite
No. of Modules inside the PowerPlant
No. of Battery Bank installed atsite
External alarm Extension boxinstalled at site
No. of Diesel GeneratorInstalled at site
Phase-1 phase/3Phase
Phase - 1 phase/3Phase
DC-DC convertor installed atsite - Yes/No
-
8/8/2019 Bramhanigaon Site Matrials List
5/6
G T L Infrastructure LimitedSAMPLE PLOT LAYOUT
EP-1 EP-2 EP-3 EP-4
DG Bed
Tower
HCT
Shelter
Guard Room
N
E
-
8/8/2019 Bramhanigaon Site Matrials List
6/6
G T L Infrastructure LimitedSAMPLE SHELTER EQUIPMENT LAYOUT
AC-1 AC-2 Provision
A/c opening A/c Provision
BatteryBank-Main BTS -1
19" MW rack
Space
space
Power Plant -48V
space
Servo
DCDB-1
ACDB Fire Alarm DCDB-2
Feederentry
Feederentry
BatteryBank-
Secondary