2010 Project Development and Implementation
1. Beachcrest Estuary Restoration 2. Big Cove Estuary Restoration3. Greenwater Floodplain Phase I4. Ohop Valley Restoration 5. Elbow Lake Creek Fish Passage6. Riparian Planting Projects7. Goldsborough Creek Project
Development8. WRIA 15 Nearshore Project
Development9. Titlow Feasibility and Design10. Jarrell Cove Fish Passage11. Stream Monitoring
Beachcrest Estuary Restoration
County:Thurston
Objective:Estuary and Fish Passage
Funding:SRFB, USFWS, NFWF
Partners:Homeowners Association
Engineering:Fisheries Consultants
Contractor:McClung Constr.
Big Cove Estuary Restoration
County:Mason
Objective:Estuary and Fish Passage
Funding:SRFB, NFWF, USFWS
Engineering:Waterfall Eng.
Contractor:McClung Const.
Greenwater Floodplain Restoration Phase I
Greenwater River 1956
Greenwater River 1970
Greenwater Floodplain Restoration Phase I
County:Pierce and King
Objective:Floodplain In-stream
Funding:SRFB, WSDOT, PSP,
Partners:US Forest ServiceMuckleshoot TribePuyallup Tribe
Engineering:Herrera and ENTRIX
Contractor:RV Associates
County:Pierce
Objective:In-stream Habitat and Floodplain
Funding:SRFB, USFWS, NRCS
Partners:Nisqually TribeNisqually Land Trust
Engineering:ENTRIX
Contractor:RV Associates
Ohop Valley Restoration
County:Thurston
Objective:Fish Passage
Funding:NFWF, USFWS
Partners:Nisqually TribeNisqually Land Trust
Engineering:Waterfall Eng.
Contractor:McClung Const.
Elbow Lake Creek
Riparian Planting
Projects:GoldsboroughClover CreekBeachcrest
Objective:Riparian
Funding:Pierce County SGPNFWFSquaxin Tribe
Partners:Pierce Stream TeamMary Sue and Arthur GeeWCCSound Native PlantsVolunteers
Goldsborough Creek Project Development
County:Mason
Objective:Project Development
Funding:NFWF
Partners:Simpson Timber, Green Diamond, Squaxin Island Tribe, Capitol Land Trust, WRIA 14 stakeholders
Engineering:Waterfall Eng.Anchor QEA
WRIA 15 Nearshore Project Development
County:Pierce
Objective:Project Development
Funding:SRFB
Partners:Squaxin TribePierce County
Engineering:Anchor QEACGSCoast and HarborWaterfall Eng.
Titlow Lagoon Feasibility and Design
County:Pierce
Objective:Feasibility
Funding:ESRP
Partners:Metro Parks TacomaPeople for Puget Sound
Engineering:Parametrix
.
Jarrell Cove Fish Passage
County:Mason
Objective:Estuary and Fish Passage
Funding:SRFB and Mason County
Partners:Mason County
Engineering:Mason County
Contractor:Pivetta Brothers
Stream Monitoring
Kennedy Creek Salmon Trail
Kennedy Creek Salmon Trail
Kennedy Creek Salmon Trail
Al SchmauderAllen ScheinAndy HixAnna KindermanArline Fullerton Becky CorrBen TrowbridgeBruce StewartBryan OwensChris ZippererCraig Baker David LoveDell SimmonsDenise BeckwithDiane Russell
Dianne KordosisDrew PetrozziEmily SanfordJack HavensJaime PetrozziJennifer HopperJerimiah WeddingJessie DuvallJim AndersonJoe UhlmanJohn RosenbergKameron HarperKayta TourtillotKen GuzaLeeann TourtillotLon Sullivan
Mark GenichMary GibbonsMary Ann FirminMegan LanghalsMelissa JonesMichelle StevieSarah HaqueSharon LoveShawn ZaniewskiSteve MutoliTerrence LeeVirginia HaasWarren DawesSteven BrinkLinton Waldrick
Thanks to our 2010 Kennedy Creek Docents!
2011-12 Projects
Allison Springs EstuaryPurdy Creek Fish Passage
Schneider Creek Fish PassageGoldsborough Creek Project Suite
Greenwater Floodplain Phase 2Priest Point Park Bulkhead Removal Design
Gull Harbor Estuary Boston Harbor Culvert Removal DesignSquaxin Is. Pier and Bulkhead Removal
Case Inlet Shoreline EnhancementPenrose Point Bulkhead Removal Design
Midway Creek Fish Barrier RemovalMcCormick Creek Fish Passage
Ohop Valley Restoration Design Phase IIIClearwater Large Woody Debris Project
WRIA 13 Three Year Workplan Project DevelopmentWRIA 14 Three Year Workplan Project Development
McClane Creek Watershed Project Development
Allison Springs and Randall
County:Thurston
Objective:Estuary and Fish Passage
Funding:SRFB, USFWS
Partners:Capitol Land TrustCity of OlympiaPeople for P. Sound
Engineering:Waterfall Eng.
Squaxin Island Pier and Bulkhead
County:Mason
Objective:Shoreline processes
Funding:SRFB, WA Dept. Nat. Resources
Partners:Squaxin TribeWDNR
Contractor:Redside Const.
Clearwater River Large Woody Debris
County:Pierce
Objective:In-stream habitat
Funding:SRFB
Partners:Muckleshoot TribePuyallup TribeHancock Res. Comp.
Thanks to Our Partners
• Salmon Recovery Funding Board• Thurston Conservation District• Mason Conservation District• Pierce Conservation District• South Sound Fly Fishers• Trout Unlimited • Washington Trout• Puget Sound Action Team• People for Puget Sound• The Nature Conservancy • Capitol Land Trust• Nisqually Land Trust• Northwest Indian Fisheries
Commission• Pack Forest• Green Diamond• Taylor Shellfish• Department of Ecology• Kennedy Creek Quarry• Stream Team• Hood Canal Salmon Enhancement
Group• Port of Olympia • Washington Conservation Corps• Washington Department of Fish and
Wildlife
• Washington Department of Transportation • Washington Department of Natural
Resources • Puyallup Tribe• Nisqually Tribe• Squaxin Tribe• Muckleshoot Tribe• US Forest Service• US Fish and Wildlife Service • National Fish and Wildlife Foundation• Mason County• Pierce County• Thurston County• Kitsap County • City of Olympia• City of Eatonville• City of Yelm• Local School District• South Sound Green• Metro Parks Tacoma• University of Puget Sound • Clover Park Technical College• Puget Sound Fly Fishers