Download - bsnl Summer Training ppt
-
8/19/2019 bsnl Summer Training ppt
1/24
SUMMER TRAINING PRESENTATION
BHARAT SANCHAR NIGAM LIMITED(BSNL)
Submitted to: Submitted By :
-
8/19/2019 bsnl Summer Training ppt
2/24
• Bharat Sanchar Nigam Limited BSNL!i" a #ub$ic "ector te$ecommunication
com#any o% India&• BSNL i" the '%th $arge"t mobi$ete$e#hony ha(ing a cu"tomer ba"e o% )*crore" a" o% +une *,)-&• BSNL ha" )*&./ mar0et"hare in India&• It" head 1uarter" are at Bharat SancharBha2an3 4ari"h 5handra Mathur Lane3
6an#ath Ne2 7e$hi&
INTRODUCTION
-
8/19/2019 bsnl Summer Training ppt
3/24
CONTENT• LEASE7 LINES
• OPTI5AL 8IBER
• MLLN MANAGE7 LEASE7
LINES!
• PULSE 5O7E MO7ULATION
• MULTIPLE9ING
-
8/19/2019 bsnl Summer Training ppt
4/24
LEASED LINES• A $ea"ed $ine i" a #ermanent 'ber o#ticor cab$e %orte$e#hone connection bet2een t2o
#oint" "et u# by a te$ecommunication" carrier&• A $ea"ed $ine i" a$"o "ometime" re%erred toa" a dedicated $ine&
• The"e are genera$$y u"ed by in ban0"3o ce" and many other #$ace"&
-
8/19/2019 bsnl Summer Training ppt
5/24
BAN;
BAN;
OPTI5AL8IBREOR
5ABLE
LEASE7 LINE < 7IAGRAM
-
8/19/2019 bsnl Summer Training ppt
6/24
7RA=BA5; • No 5entra$i>ed Monitoring or a$arm or
#er%ormance monitering
• Ma?imum data rate @ 0b#" %orbroadbrand• To o(ercome thi" MLLN i"u"ed• 4ere MLLN "tand" %orManaged Lea"ed LineNet2or0
-
8/19/2019 bsnl Summer Training ppt
7/24
• The MLLN "er(ice i" "#ecia$$yde"igned main$y %or ha(ing
e ecti(e contro$ andmonitoring on the $ea"ed $ine"o that the do2n time i"
minimi>ed and the circuite ciency i" increa"ed& Thi"main$y dea$" 2ith data circuit"
ranging %rom @ ;b#" to *, C
MANAGE7 LEASE7 LINE
NET=OR;
-
8/19/2019 bsnl Summer Training ppt
8/24
• 5ontro$ manage the $ea"ed $inenet2or0&
• U"ing NMS3 MLLN can #ro(ide high"#eed Lea"ed Line 2ith im#ro(edDoS3 high a(ai$abi$ity&
• Band2idth management a" #er thecu"tomer demand&
• E?ce#t %or connecting the $oca$ $ead to
the MO7EM a$$ o#eration" maintenance i" carried out throughROT Remote O#erating Termina$!
• * * ROT u#to *,,F and ) C ne2 ROT
in"ta$$ed a%ter *,,F&•
MLLN
8EATURES
-
8/19/2019 bsnl Summer Training ppt
9/24
MLLN
A7HANTAGES• Band2idth Management a" #er cu"tomer
re1uirement @ ;b#" and n @ ;b#" u# toto *, C ;b#"!&
• Sa(ing the co"t o% modem"& NTU i"#ro(ided by BSNL 2itout any charge"&
•
Proacti(e maintenance&• Time de#endent band2idth&
• Time de#endent band2idth:MLLN "y"tem i" ca#ab$e %or #ro(iding
de%erentia$ time de#endent band2idth onre1ue"t& 8o$$o2ing #arameter" "hou$d becon"idered 2hich acce#ting the re1ue"t&• Minimum #eriod:
One month and in mu$ti#$ie" there o%&• Minimum time #er day:
-
8/19/2019 bsnl Summer Training ppt
10/24
• O#tica$ 'ber con"i"t" o% a core
and a c$adding $ayer3 "e$ected%or tota$ interna$ reJection dueto the di erence in the
re%racti(e inde? bet2een the
• Genera$$y through coa?ia$cab$e" the "#eed o%tran"mi""ion 2a" not "o high 3Thu" O#tica$ 'bre i" u"ed toincrea"e the "#eed o%trami""ion bet2een t2o #oint"
%or communication #ur#o"e& .
OPTI5AL 8IBER
-
8/19/2019 bsnl Summer Training ppt
11/24
PRINCIPLE OF OPTICAL-FIBER
Fig-Principle of Optical -Fiber
-
8/19/2019 bsnl Summer Training ppt
12/24
ø 1
Angle of incidence
n1
n2ø 2
n1
n2
ø 1
ø 2
n1
n2
ø 1 ø 2
Angle of reflection
Light is bent awayfrom normal
Light does not entersecond material
Tota$ Interna$ ReJection < The ReJection thatOccur" 2hen a Ligh Ray Tra(e$$ing in OneMateria$ 4it" a 7i erent Materia$ andReJect" Bac0 into the Origina$ Materia$
-
8/19/2019 bsnl Summer Training ppt
13/24
Mu$ti#$e?ing or mu?ing! i" a2ay o% "ending mu$ti#$e "igna$"or "tream" o% in%ormation o(er a
communication $in0 at the "ametime in the %orm o% a "ing$ecom#$e? "igna$K the recei(er
reco(er" the "e#arate "igna$ a#roce"" ca$$ed demu$ti#$e?ingor demu?ing!&
MULTIPLE9ING
-
8/19/2019 bsnl Summer Training ppt
14/24
-
8/19/2019 bsnl Summer Training ppt
15/24
87M techni1ue" u"ua$$y 'nd their a##$ication inana$ogue tran"mi""ion "y"tem"& An ana$ogue
tran"mi""ion "y"tem i" one 2hich i" u"ed %ortran"mitting continuou"$y (arying "igna$"&
8ig& 87M Princi#$e
-
8/19/2019 bsnl Summer Training ppt
16/24
*& Time 7i(i"ion Mu$ti#$e?ing =hen the #u$"e i" #re"ent %or a
"hort duration and %or mo"t o% the timebet2een the t2o #u$"e"3 no "igna$ i"#re"ent& Thi" %ree "#ace bet2een the#u$"e" can be occu#ied by #u$"e" %romother channe$"& Thi" i" 0no2n ca$$ed Time7i(i"ion Mu$ti#$e?ing T7M!& In T7M that "igna$ to be mu$ti#$e?edare tran"mitted "e1uentia$$y one a%ter theother& Each "igna$ occu#ie" a "hort time"$ot & Thu"3 the "igna$" are i"o$ated %rom
each other in the time domain3 but a$$ o%them occu the "ame "$ot in the
-
8/19/2019 bsnl Summer Training ppt
17/24
Time 7i(i"ionMu$ti#$e?ing
-
8/19/2019 bsnl Summer Training ppt
18/24
•
Pu$"e code modu$ation i" a digita$"cheme %or tran"mitting ana$ogdata& The "igna$" in P5M arebinary that i"3 there are on$y t2o
#o""ib$e "tate"3 re#re"ented by$ogic ) high! and $ogic , $o2!&
• P5M "y"tem" u"e T7M techni1ue to#ro(ide a number o% circuit" onthe "ame tran"mi""ion
medium (i> o#en 2ire orunderground cab$e #air or
a channe$ #ro(ided by carrier3coa?ia$3 micro2a(e
or "ate$$ite "y"tem&
PULSE 5O7E
MO7ULATION
-
8/19/2019 bsnl Summer Training ppt
19/24
To de(e$o# a P5M "igna$ %rom "e(era$ ana$ogue "igna$"3 the%o$$o2ing #roce""ing "te#" are re1uired)& 8i$tering*& Sam#$ingF& Duanti"ation
& Encoding
)& 8ILTERING8i$ter" are u"ed to $imit the "#eech "igna$ to the %re1uencyband F,,&*& SAMPLING "am#$ing o% the "igna$ i" the %undamenta$ o#eration in"igna$ #roce""ing& A continuou" time "igna$ i" 'r"t con(ertedto di"crete time "igna$ by "am#$ing theorem& Sam#$ing theorem "tate" :
A continuou" time "igna$ may be com#$ete$y re#re"entedin it" "am#$e" and reco(ered bac0 i% the "am#$ing %re1uency i"
%" *%m&4ere %" i" "am#$ing %re1uency and %m i" ma?imum %re1uency
BASI5 REDUIREMENTS 8ORP5M S STEM
-
8/19/2019 bsnl Summer Training ppt
20/24
Sam#$ing Proce""
-
8/19/2019 bsnl Summer Training ppt
21/24
F& Duanti"ation : "ometime" in communication "y"tem" iti" re1uired to con(ert ana$og "igna$ into
digita$ "igna$ or can "ay to con(ert acontinuou" time "igna$ in the %orm o%digit"&8or thi" #ur#o"e 2e get the "am#$e" o%
ana$og "igna$ the "am#$e" are ta0en ate1ua$ time in"tant" at the time a?i" andat each o% the"e time in"tant" themagnitude o% the "igna$ i" mea"ured and
thi" "am#$e" o% the "igna$" are ta0en &no2 "igna$ i" in di"crete time ho2e(erthe "am#$e can ta0e any (a$ue incontinuou" range3 the "igna$ i" "ti$$ an
ana$og "igna$ thi" di cu$ty i" re"o$(ed by
-
8/19/2019 bsnl Summer Training ppt
22/24
Quantizing is done for both positive and negative swings. As shown inFig., eight quantizing levels are used for each direction of theanalogue signal. To indicate whether a sa ple is negative withreference to zero or is positive with reference zero, an e!tra digit isadded to the binar" code. This e!tra digit is called the #sign bit#. $n Fig. positive values have a sign bit of % &% and negative values have sign
bit of%'%.
QUANTIZING - SIGNAL WITH + Ve & - VeVALUES
-
8/19/2019 bsnl Summer Training ppt
23/24
Encodin(onversion of quantised analogue levels to binar" signal is called encoding. To represent
)*+ steps, level code is required. The eight bit code is also called an eight bit #word#.The bit word appears in the for
P ABC W!"ZPolarit" bit & /eg ent (ode 0inear encoding
for 1 ve %O% for - ve.
The first bit gives the sign of the voltage to be coded. 2e!t 3 bits gives the seg ent nu ber. Thereare seg ents for the positive voltages and for negative voltages. 0ast 4 bits give the position in theseg ent. 5ach seg ent contains &+ positions. 6eferring to Fig. 78b9, voltage :c will be encoded as & &&&
'&'&.
Encoding Curve withCompression 8 Bit Code
-
8/19/2019 bsnl Summer Training ppt
24/24