![Page 1: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/1.jpg)
Presented By:
Chris Dow – Sales Director, Asia Pacific
Hitec Power Protection
The E3 Approach for Reliance Industries
The most
Efficient, Economic and Environmentally conscious solution for the continuous
support of both critical IT and cooling loads
Hitec Diesel Rotary UPS (DRUPS) Systems
![Page 2: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/2.jpg)
Authorised Distributor of Hitec Power Protection in India
17th September 2009
Hi-Rel Electronics Limited
Completing 25 years of Industrial Excellence
![Page 3: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/3.jpg)
• Incorporated in 1984… Providing Power Electronics Solutions.
• Industrial Electrical / Electronics Solutions since inception
• ISO 9001:2000 company – Hi-Rel = “High Reliability”
• We bring solid industry experience, skills, and functional expertise to
provide optimal process control & power conditioning solutions
• We strive to be a sustained and recognized leader by continuous quality
improvements in all our business activities
• We believe that our customers are the basic reason for our existence and
they deserve the best we can give
Hi-Rel’s core company values
![Page 4: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/4.jpg)
Gandhinagar Ahmedabad
Mumbai
Pune
Bangalore Chennai
Secunderabad
Kolkata
Delhi
Vadodara Indore Jamnagar
Surat Silvassa/Vapi
Vishakhapatanam
Jamshedpur Bhilai
Hi-Rel Office
Corporate Office
Bokaro
Lucknow
Raipur Cuttack
Korba
Rourkela
Sales & Service Network
Hi-Rel’s Coverage
HO & Works at: Gandhinagar, Gujarat
1st Success - Gurgaon 3 x 2MVA Hitec DRUPS
2nd Success – Mumbai 4 x 1.5MVA Hitec DRUPS
3rd Success – Bangalore 500kVA containerised Hitec DRUPS
![Page 5: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/5.jpg)
Why Hitec Diesel Rotary UPS
• The Hitec DRUPS provides the higest level of security to critical services to maintain 99.995% Data Hall uptime regardless of utility service failure or maintenance activities.
• Hitec’s tried and tested DRUPS equipment design is most compact, efficient and suitable for a Tier IV infrastructure that demands the highest possible level of Data Centre Resilience and Reliability.
• Hitec undertook specific tests to ensure that its equipment would
meet the demands of the Indian market
![Page 6: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/6.jpg)
• Shell - Bangalore: – 1x500 kVA Containerized module – Shell testing laboratories – In operation from April 2009
• RBS – Gurgaon:
– 3 x 2000 kVA N+1 415V – RBS – Software development centre – In operation from November-2009
• Reliance RCP – Mumbai:
– 4 x 1500 kVA N+N Cross-link 11kV – Reliance – IDC first phase – In operation from November - 2009
Review – Running Sites in India
![Page 7: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/7.jpg)
• 50+ Years experience in
the Manufacture of
continuous power systems.
• High quality bespoke
engineered solutions.
• The largest manufacturing
and testing facility for
DRUPS systems in the world.
• International company operating throughout the Globe.
• An installed base of over 1600 units supporting in excess of 1600 MVA of
critical load.
The Hitec Diesel Rotary UPS system
![Page 8: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/8.jpg)
• A complete solution that utilises
stored mechanical energy
to provide continuous power.
• Combines the functionality of
both a UPS and a Standby
Diesel Engine in a single module.
• Provides high quality power to support all types of load, including critical
cooling loads and those with a leading power factor i.e. Blade Servers.
• Suitable for both HV and LV and 50/60 Hz applications.
• A highly reliable tried and tested design.
The Hitec Diesel Rotary UPS system
![Page 9: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/9.jpg)
Standby Diesel
UPS Inverters
Air Conditioning
Switchboards PFC
Standby Batteries
Spark-proof Lighting Busduct & Cabling
Fire Protection & Security
Static UPS
+
The Hitec Diesel Rotary UPS system
![Page 10: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/10.jpg)
Hitec DRUPS
The Hitec Diesel Rotary UPS system
![Page 11: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/11.jpg)
Standby Diesel
Hitec DRUPS
UPS Inverters
Air Conditioning
Switchboards PFC
Standby Batteries
Spark-proof Lighting Busduct & Cabling
Fire Protection & Security
Static UPS
The Hitec Diesel Rotary UPS system
![Page 12: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/12.jpg)
Simplicity of Design: 5 principal components and no power electronics
Choke
Synchronous Alternator
Diesel Engine
Induction Coupling
Utility Load
Clutch
The Hitec Diesel Rotary UPS system
![Page 13: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/13.jpg)
Diesel Engine • Uses Dual Starter Motors
• Redundant Staring System
• Pre-Heated Engine
• Continuously Lubricated
• Rapid Starting
• Anti Vibration Mounts
• Free-wheel Clutch
The Hitec Diesel Rotary UPS system
![Page 14: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/14.jpg)
Synchronous Alternator
Normal Operation - Active Filter
Diesel Operation - Generates Energy
• 1.6 Times the DRUPS Rating
• 4 Pole AC Winding
• 1500rpm
The Hitec Diesel Rotary UPS system
![Page 15: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/15.jpg)
Induction Coupling Kinetic Energy Store
Outer Rotor
• 1500rpm
• 2 Pole AC Winding
• Brushless Exciter
Kinetic Energy Store
Inner Rotor
• 4500rpm
• Free Rotating
• Stored mass
The Hitec Diesel Rotary UPS system
![Page 16: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/16.jpg)
Diesel Operation Normal Operation time
4500
1500
0
with partial load
at full load
spee
d (r
pm)
Normal Operation
The Hitec Diesel Rotary UPS system
![Page 17: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/17.jpg)
The Hitec Diesel Rotary UPS system
Mains voltage
Output voltage
50.5 Hz
50 Hz
49.5 Hz
1 sec.
1500 rpm
Dynamic UPS at 100% load
Mains Voltage
Diesel engine RPM
50 Hz Line
Output frequency [Hz]
Free wheel clutch engaging
Moment of mains failure
Diesel start
![Page 18: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/18.jpg)
Supported Loads • Servers • PC’s • Chillers • Radars • Transmitters • Motors/Pumps • Fans • Compressors • Heaters Entire Processes! Maximum load flexibility
The Hitec Diesel Rotary UPS system
![Page 19: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/19.jpg)
The E3 Approach
Efficient, Economic and Environmentally Conscious
![Page 20: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/20.jpg)
The Hitec DRUPS system is at least 5% more efficient
Inefficient
Hitec DRUPS
Total losses <4% 100% >96%
Total losses >9%
100% <91%
Static UPS System
Efficient
E3: Achieving the lowest TCO
![Page 21: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/21.jpg)
On-site Efficiency Measurements - Metropolitain Police C3i Projects
DRUPS 0% Load 25% Load 50% Load 75% Load 100% Load
Module
Hendon 1600 kVA 32 kW 92.5% 94.6% 96.7% 97.2%
Module 1
Hendon 1600 kVA 29 kW 92.22% 96.35% 97.6% 98.0%
Module 2
Lambeth 1600 kVA 32 kW 91.9% 95.7% 96.8% 97.6%
Module 1
Lambeth 1600 kVA 33 kW 91.7% 97.7% 96.9% 97.3%
Module 2
Bow 1600 kVA 26 kW 93.1% 95.9% 97.1% 97.5%
Module 1
Bow 1600 kVA 21 kW 93.5% 95.5% 96.4% 96.7%
Module 2
E3: Achieving the lowest TCO
![Page 22: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/22.jpg)
75
80
85
90
95
100
25% 50% 75% 100%
DRUPS Static UPS
Load
Effi
cien
cy
5% 6% 7% 9%
Comparative ‘System v System’ operating efficiencies for equivalent DRUPS and Static UPS equipment
E3: Achieving the lowest TCO
![Page 23: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/23.jpg)
0
5
10
15
20
25
30
35
40
1 2 3 4 5 6 7 8 9 10
DRUPS Static UPS
Rs. 14M
Rs. 37.3M
Comparative running costs based on 5 Rupees per kWhr for a UPS requirement of 1500 kVA
Cost
Mill
ion
Rupe
es
Year
Saving of Rs. 23.3M over a 10 Year Period
E3: Achieving the lowest TCO
![Page 24: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/24.jpg)
• No Standby Batteries = Removes Toxic Materials
• Efficient Diesel Engines = Economy and Low Emissions
• High Operating Efficiency = Lower Running Costs
• Smaller Equipment Size = Efficient use of Plant Space
• Integral Power Conditioning = Higher quality Power
• Power Factor Correction = Fewer Components
• Increased Flexibility = Future Proof Design
The Hitec DRUPS has a low Environmental Impact
E3: The GREEN UPS Solution!
![Page 25: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/25.jpg)
Hitec customers who demand the ‘GREEN’ approach
• HSBC - Zero Carbon Footprint
• Google - Green Energy Initiative
• Reliance Industries - Green Power Reliability
• IBM - Green Energy Initiative
• Citigroup - BCA Platinum Award
• Fujitsu - Most Efficient Data Centre
• Injazat - Green Energy Initiative
• KPN - Green Energy Initiative
• Tata - Green Energy Initiative
E3: The GREEN UPS Solution!
![Page 26: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/26.jpg)
Operating efficiency is the key to calculating a ‘systems’ Carbon Footprint
E3: The GREEN UPS Solution!
![Page 27: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/27.jpg)
=
Standby Diesel & Switchboard
UPS Inverter and Batteries
Air Conditioning & PFC
The Hitec DRUPS Requires 30% less floor area
Space Saving Design
E3: The GREEN UPS Solution!
![Page 28: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/28.jpg)
• Level of efficiency Highest
• Production of CO2 Lowest
• Number of components Lowest
• Material usage Minimal
• Use of Toxic Materials in Manufacture N/A
• Disposal of Toxic Materials N/A
• Recycling of waste Negligible
• Component life Highest
• Overall impact on the environment Lowest
Sustainability Factors
E3: The GREEN UPS Solution!
![Page 29: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/29.jpg)
• Developed and tested for the Indian environment
• Proven reliability using few components
• No power electronics or power conversion
• High MTBF >900,000 hrs (SUPS typically 350,000 hrs)
• No harmonic generation and High harmonic filtration
• Ease of operation and single maintenance contract
• Future proof design meets all DC requirements
• Continuous support for both critical IT and Cooling loads
DRUPS: the technology of choice for large/critical applications
throughout the world
Why Diesel Rotary UPS
![Page 30: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/30.jpg)
Case Study
Reliance Industries – RCP
Integrated Data Centre
At Vashi, Navi Mumbai
![Page 31: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/31.jpg)
• Project Objective Deliver equivalents to TIER IV Compliant ‘Co-hosting Data Centre’ with a
managed, secure and environmentally controlled 2000m² Data Halls for hosting mission critical servers and other related IT equipment.
• Project Timescales - Design commenced January 2008 - Project commenced on-site June 2008 - DRUPS installation starts June 2009 - DRUPS Operational November 2009 • Operating Environment - Besides Hills - Remote Location - 42 Degree Ambient Temperature
Project Requirements
![Page 32: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/32.jpg)
• Construction - Five storey construction - Plant rooms at ground floor level - Data Centre at first to fifth floor level • UPS Power Requirements (Final) - 15 MVA Critical Load - Utility power from 2 separate/redundant primary source (A & B) - Fully redundant power distribution systems - Simultaneous power from both distribution systems - Total system isolation up to point of power delivery - Critical power equipment fully supported by DRUPS - Stand alone fuel capacity for 72 hours operation
Project Requirements
![Page 33: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/33.jpg)
• Turnkey approach • 15 MVA of Secure Power • N+1 Parallel Redundant Operation in two Systems • 30 Mtrs height Chimney for individual DRUPS • Connection of Vertical Radiators • The provision of sufficient cooling air • 26kA Medium-Voltage switchgear • Installation of 11kV equipments • Installation done under heavy rainy condition
Project Challenges
![Page 34: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/34.jpg)
Operating Philosophy
![Page 35: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/35.jpg)
Operating Philosophy
![Page 36: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/36.jpg)
MV DRUPS System ‘B’
MV DRUPS System ‘A’
O/P Bus O/P Bus
MAINS SUPPLY - B
Normal Operation (Mains Available)
Operating Philosophy
Non-Critical Load
Critical IT & Server Load Low-Voltage
Critical Cooling & Mech’ Load
MAINS SUPPLY - A
![Page 37: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/37.jpg)
MV DRUPS System ‘B’
MV DRUPS System ‘A’
O/P Bus O/P Bus
MAINS SUPPLY - A
MAINS SUPPLY - B
Operating Philosophy
Non-Critical Load
Critical IT & Server Load Low-Voltage
Critical Cooling & Mech’ Load
Diesel Operation (Mains Failure)
![Page 38: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/38.jpg)
DRUPS Room under construction
![Page 39: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/39.jpg)
Equipment Delivery and Offloading
![Page 40: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/40.jpg)
Equipment Delivery and Offloading
![Page 41: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/41.jpg)
Equipment Installation
![Page 42: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/42.jpg)
Moving into position
![Page 43: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/43.jpg)
MV Panel Room under construction
![Page 44: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/44.jpg)
Installed MV Panels
![Page 45: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/45.jpg)
Chimney Transportation
![Page 46: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/46.jpg)
Chimney Installation
![Page 47: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/47.jpg)
Completed Chimneys for all four DRUPS
![Page 48: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/48.jpg)
Installed Choke & Transformers for all four DRUPS
![Page 49: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/49.jpg)
DRUPS Control Panels - System Operational
![Page 50: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/50.jpg)
Live MV Switch Panels and Controls
![Page 51: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/51.jpg)
Completed piping, flues and power cabling
![Page 52: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/52.jpg)
The completed DRUPS Installation
![Page 53: Case Study - Reliance Industries_Mumbai - 20100329](https://reader033.vdocument.in/reader033/viewer/2022051709/5876e71e1a28ab046d8b648d/html5/thumbnails/53.jpg)