EE MEASURES Street lighting Households lighting Solar Water Heater Refrigeration

Page 3: CASINDO TEAM TWG III

CASINDO Region NTB

1. STREET LIGHTING Replacing low efficacy with LED

Total investment Rp. 133,866,500

Types of Existing Bulbs EfficacyPower/

Unit (watt)

Number of Bulbs Types of LED Power/Unit

(watt)

Mercury/HPLN ( Mercury Fluorescent ) 52.5 125 622 Streeth Light - HG 60W 60

ML (Mercury Blended )18.5

160 313 Streeth Light - HG 25W 25

ML (Mercury Blended )18.5

250 147 Streeth Light - HG 40W 40

ML (Mercury Blended )18.5

500 586 Streeth Light - HG 80W 80

Page 4: CASINDO TEAM TWG III

CASINDO Region NTB

STREET LIGHTING (CONT.)

NPV figureStreet Lighting

-120000000

-100000000

-80000000

-60000000

-40000000

-20000000

0

20000000

40000000

60000000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61

Months

NPV

Page 5: CASINDO TEAM TWG III

CASINDO Region NTB

STREET LIGHTING (CONT.)

Pay Back Period is about 36 months or 3 years

Potential saving Rp. 3,249,450/month 1,384.44 kWh/month

Page 6: CASINDO TEAM TWG III

CASINDO Region NTB

2. HOUSEHOLDS LIGHTING

Replacing conventional bulbs with energy saving bulbs

Investment Rp. 35000/bulb per households

Pay Back Period : around 6 monthsPotential saving

Rp. 3,249,450/month1,384.44 kWh/month

Page 7: CASINDO TEAM TWG III

CASINDO Region NTB

HOUSEHOLDS LIGHTING (CONT.)

NPV figure

Total households in Mataram 84,095

Households Lighting

-50,000.0

-25,000.0

0.0

25,000.0

50,000.0

75,000.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Months

NPV

Page 8: CASINDO TEAM TWG III

CASINDO Region NTB

HOUSEHOLDS LIGHTING (CONT.)

For lower Expenses Category:30% replace 2 conv.bulbs en. sav.Total replaced 12,993 unitsPotential saving:

Rp. 312,757,744/month71,720 kWh /month

Higher Expensesalready use en. saving bulbs

Page 9: CASINDO TEAM TWG III

CASINDO Region NTB

HOUSEHOLDS LIGHTING (CONT.)

For Medium Expenses Category:50% replace 1 conv.bulbs en. Sav.Total replaced 18,379 unitsPotential saving:

Rp. 442,411,322/month101,452 kWh /month

Total potential savingRp. 755,166,065/month 173,171 kWh/month

Page 10: CASINDO TEAM TWG III

CASINDO Region NTB

3.WATER HEATER

Replacing pure EWH with combination EWH +SWH (EWH for back up)

Investment Rp.10,000,000/unit SWH+EWH

Pay Back Period is 37 months or about 3 years

Page 11: CASINDO TEAM TWG III

CASINDO Region NTB

WATER HEATER (CONT.)

NPV figure SWH+EWH

-10,000,000

-8,000,000

-6,000,000

-4,000,000

-2,000,000

0

2,000,000

4,000,000

1 6 11 16 21 26 31 36 41 46 51 56

Month

NPV

Page 12: CASINDO TEAM TWG III

CASINDO Region NTB

WATER HEATER (CONT.)

Potential saving per unit SWH+EWH:Rp. 272,880/month 144 kWh/month

Page 13: CASINDO TEAM TWG III

CASINDO Region NTB

4. REFRIGERATORS

Replacing the existing refrigerators with the very efficient ones

Investment Rp. 1,796,400/unit refrigerator

Pay Back Period is about 88 months or about 7 years

Page 14: CASINDO TEAM TWG III

CASINDO Region NTB

REFRIGERATORS (CONT.)

NPV figure

Refrigerators

-2,000,000

-1,500,000

-1,000,000

-500,000

0

500,000

1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96 101

Months

NPV

Page 15: CASINDO TEAM TWG III

CASINDO Region NTB

REFRIGERATORS (CONT.)

Total refrigerators in Mataram 626,506 units

Potential saving:– Rp. 1,066,593,867.14/month – 1,350,118.82 kWh/month