Download - Ccna4 Discovery Exam 2
-
8/14/2019 Ccna4 Discovery Exam 2
1/21
Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
During an evaluation of the currently installed network, the IT staff
performs a gap analysis to determine whether the existing network infrastructure cansupport the desired new features. At which stage of the Cisco Lifecycle Services
approach does this activity occur?Prepare Phase
Plan Phase
Design Phase
Implement PhaseOperate Phase
Optimize Phase
Scoring Rule For: correctness of response
2 points for Option 2
0 points for any other optionMax Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
2/21
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
Which stage of the Cisco Lifecycle Services strategy is usually
completed before an organization issues a Request For Proposal (RFP) or Request For
Quotation (RFQ)?Prepare Phase
Plan Phase
Design Phase
Implement PhaseOperate Phase
Optimize Phase
Scoring Rule For: correctness of response
2 points for Option 1
0 points for any other optionMax Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
-
8/14/2019 Ccna4 Discovery Exam 2
3/21
What is the purpose of SNMP?
to facilitate the exchange of information between devices and the NMSto monitor and control managed network devices
to report user logins to a monitoring station
to verify traffic throughout the network and keep a log of all activity
Scoring Rule For: correctness of response
2 points for Option 1
0 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
During an analysis of a customer network, several possible
opportunities for network improvement are identified. At which stage of the CiscoLifecycle Services does this process occur?
Prepare Phase
Plan Phase
Design Phase
-
8/14/2019 Ccna4 Discovery Exam 2
4/21
Implement Phase
Optimize Phase
Operate Phase
Scoring Rule For: correctness of response
2 points for Option 30 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
What provides the initial data for the Optimize Phase?
performance monitoringbusiness goals
technical goals
RFP
Scoring Rule For: correctness of response
2 points for Option 1
0 points for any other option
-
8/14/2019 Ccna4 Discovery Exam 2
5/21
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
Which two statements are true regarding the response to an RFQ?
(Choose two.)The response should be brief.
It should strictly conform to the formatting requirements specified by the RFQ.
Only the items that the contracting company will be addressing should beanswered.
The response helps the customer compare pricing with other potential contractors.
The response is more complicated than a response to a RFP.
Scoring Rule For: correctness of response
Option 2 and Option 4 are correct.
1 point for each correct option.0 points if more options are selected than required.
Max Value = 2
Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
6/21
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
What are two disadvantages of using a bottom-up approach insteadof a top-down approach to network design? (Choose two.)
It can result in an inappropriate network design.
A new design cannot be implemented right away.
It does not take into account the business goals of the company.This approach is not commonly practiced and is therefore not as well known.
It requires tedious and time-consuming meetings with the customer to develop an
understanding of the organization.
Scoring Rule For: correctness of response
Option 1 and Option 3 are correct.1 point for each correct option.
0 points if more options are selected than required.
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
7/21
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
What is a business constraint that may impact the WAN design of acompany?
company policy regarding specific operating systems on LAN devices
current monitoring protocols implemented on end-user devices
non-availability of end users during implementationcompany policy requiring the use of specific vendor networking equipment due to
partnerships
Scoring Rule For: correctness of response
2 points for Option 4
0 points for any other optionMax Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
-
8/14/2019 Ccna4 Discovery Exam 2
8/21
-
8/14/2019 Ccna4 Discovery Exam 2
9/21
-
8/14/2019 Ccna4 Discovery Exam 2
10/21
-
8/14/2019 Ccna4 Discovery Exam 2
11/21
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
What is the purpose of system-level acceptance testing?to develop an installation plan for the newly designed network
to train end users and support personnel on the newly installed networkto check that the newly installed network meets the business goals and design
requirements
to justify the financial investment required to implement the technology change
Scoring Rule For: correctness of response
2 points for Option 3
0 points for any other optionMax Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
-
8/14/2019 Ccna4 Discovery Exam 2
12/21
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
A network engineer working for a contracting company is
informed of a pre-bid meeting with a potential client. What purpose does the networkengineer have for attending the pre-bid meeting?
to submit request for proposal responses
to discuss proposed installation and monitoring plans
to perform system-level acceptance tests on the current networkto clarify project scope and timelines not included in the original request for
proposal
to create a business case outlining reasons for financial investment in a network
upgrade
Scoring Rule For: correctness of response
2 points for Option 40 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
What is a business constraint that may impact the WAN design of a company?
-
8/14/2019 Ccna4 Discovery Exam 2
13/21
company policy regarding specific operating systems on LAN devices
current monitoring protocols implemented on end-user devices
non-availability of end users during implementationcompany policy requiring the use of specific vendor networking equipment due to
partnerships
Scoring Rule For: correctness of response
2 points for Option 4
0 points for any other option
What is a purpose of establishing a network baseline?
It provides a statistical average for network performance.
It manages the performance of network devices.
It creates a point of reference for future network evaluations.It checks the security configuration of network devices.
Scoring Rule For: correctness of response2 points for Option 3
0 points for any other option
When should a network baseline be performed within the stages of the Cisco Lifecycle
Services?Prepare Phase
Plan Phase
Design PhaseImplement Phase
Operate Phase
Scoring Rule For: correctness of response2 points for Option 5
0 points for any other optio
Which two items help identify business goals and priorities before a new network project
starts? (Choose two.)
installation
-
8/14/2019 Ccna4 Discovery Exam 2
14/21
motivation
profitability
trustworthinesscustomer satisfaction
Scoring Rule For: correctness of responseOption 3 and Option 5 are correct.
1 point for each correct option.
0 points if more options are selected than required.
What are two benefits of using a top-down approach instead of a bottom-up approach to
network design? (Choose two.)
incorporates organizational requirementsallows for a quick response to a design request
requires less time up front to create a network designclarifies design goals from the perspective of applications and network solutions
facilitates a design by using devices and technologies that are based on previous
experience
Scoring Rule For: correctness of response
Option 1 and Option 4 are correct.
1 point for each correct option.0 points if more options are selected than required.
Which software component is installed on network devices that are managed through
SNMP?
management agentsmanagement stations
network management protocol
Management Information Base (MIB)
Scoring Rule For: correctness of response
2 points for Option 1
0 points for any other option
-
8/14/2019 Ccna4 Discovery Exam 2
15/21
-
8/14/2019 Ccna4 Discovery Exam 2
16/21
Scoring Rule For: correctness of response
Option 1 and Option 3 are correct.
1 point for each correct option.0 points if more options are selected than required.
Which two statements best describe the responsibilities of an account manager? (Choose
two.)
acts as the primary point of contact between the company and the clientdirects the sales teams and support personnel
provides technical support to critical clients
selects the equipment and technologies to be used for the client solution
acts as the network design lead
Scoring Rule For: correctness of response
Option 1 and Option 2 are correct.1 point for each correct option.
0 points if more options are selected than required.
A network engineer working for a contracting company is
informed of a pre-bid meeting with a potential client. What purpose does the networkengineer have for attending the pre-bid meeting?
to submit request for proposal responses
to discuss proposed installation and monitoring plansto perform system-level acceptance tests on the current network
to clarify project scope and timelines not included in the original request for
proposal
to create a business case outlining reasons for financial investment in a networkupgrade
Scoring Rule For: correctness of response2 points for Option 4
0 points for any other option
Max Value = 2
-
8/14/2019 Ccna4 Discovery Exam 2
17/21
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
A major corporation has decided to hire someone to upgrade theirnetwork infrastructure. A network consulting company wants the job. What document
must the network consulting company obtain to learn about the business goals, the project
scope, the requirements for the new network and the expected deliverables?Business Case
Project Plan
Request for ProposalRequest for Comments
Scoring Rule For: correctness of response
2 points for Option 30 points for any other option
Max Value = 2
Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
18/21
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
A corporation (client) wants a network upgrade and is putting out arequest for services to various network consulting companies (contractors). A RFQ is
required. Which statement is true concerning the RFQ?sent from the contractors to the client in response to a RFP
sent from the client to the contractors along with the RFP to provide more specific
technical details
sent from the client to the contractors in place of a RFP when the technicalspecifications of a project are known
sent from the contractors to the client outlining reasons for financial investments
for the network upgrade
Scoring Rule For: correctness of response
2 points for Option 30 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
19/21
Which stage of the Cisco Lifecycle Services involves proactive
management to identify and resolve issues before the organization is affected?
Prepare PhasePlan Phase
Design Phase
Implement PhaseOperate Phase
Optimize Phase
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and the
scoring rules associated with the item.
Why is it important to prioritize business goals when developing
network design?
to ensure that the least expensive technologies are implemented first
to simplify the configuration, administration, and monitoring of the newlyinstalled network
to anticipate the effects of changes and growth of the business
to adhere to the best opportunities to contribute to the success of the business
Scoring Rule For: correctness of response
2 points for Option 40 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks. Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
20/21
Which two items help identify business goals and priorities before
a new network project starts? (Choose two.)
installation
motivation
profitability
trustworthinesscustomer satisfaction
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
A network engineer working for ABC company is writing aresponse to an RFP for a network upgrade and must create an executive summary. Which
statement describes the basic components of an executive summary?
quick overview of the problem, the recommended solution, and the justification
for ABC company doing the jobdetailed description of the solution, including but not limited to, timelines, turn-
over schedule, warranty information, and emergency recovery information
detailed description of costs including, the cost of software and hardwarecomponents, licensing requirements, labor cost, and other applicable fees
multiple page document containing additional information such as detailed lists of
equipment required, diagrams, company background information, and insurance coverage
Scoring Rule For: correctness of response
2 points for Option 1
0 points for any other optionMax Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.
Privacy Statement and Trademarks. Close Window
-
8/14/2019 Ccna4 Discovery Exam 2
21/21
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was presented during the exam and thescoring rules associated with the item.
In a network management architecture, which statement best
describes a management agent?
communication protocol used between a management station and managed devicestandardized database that a device keeps about itself concerning network
performance parametershost with the management application loaded that is used by the administrator to
monitor and configure network devices
software running on a managed device to collect network information and allow
that device to be managed by a management station
Scoring Rule For: correctness of response
2 points for Option 40 points for any other option
Max Value = 2
Close Window
All contents copyright 2001-2008 Cisco Systems, Inc. All rights reserved.Privacy Statement and Trademarks.