CE 419Plain and Reinforced Concrete III
NUST Institute of Civil Engineering
(Bond, Anchorage and Development Length)
Fall 2012
Dr. Wasim Khaliq
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
2/55
Design of Concrete Structures
Text and Reference
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
3/55
Fundamentals of Flexural Bond
In reinforced concrete beams it isassumed that strain in theembedded reinforcing bar isthe same as that in thesurrounding concrete.
Therefore, it is essential that bondforce is developed on theinterface between concrete and
steel to prevent significant slipfrom occurring at the interface.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
4/55
Source of Bond Strength
• Weak chemical adhesion
• Mechanical friction between steeland concrete
• Slip induced interlocking of naturalroughness of the bar with concrete
• End anchorage, hooks : providingtie arch action even for bondbroken beam.
Force in the steel,
T = M max
/ jd
• Deformed bar: providing bondforce via the shoulders of theprojecting ribs bear on thesurrounding concrete.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
5/55
Bond Stress Based on Simple Cracked Section Analysis
dT = dM / jd
For local equilibrium,change in bar force = bond
force at the contact surface
U dx = dT,
U = dT / dx
= dM / jd dx
U = dV / jd
* Elastic crack equation
U = local average unit bond stress
jd = internal lever arm between tensileand compressive force resultants
dx = short piece of length of beam
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
6/55
Actual Distribution of Flexural Bond Stress
Pure bending case
– Concrete fails to resist tensilestresses only where the actual crack
is located. Steel T is maximum and
T max = M / jd
– Between cracks , concrete doesresist moderate amount of tension
introduced by bond.
– U is proportional to the rate of
change of bar force, and highest
where the slope of the steel forcecurve is greatest.
– Very high local bond stress adjacent
to the crack.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
7/55
Beam under transverse loads,
– According to simple crack sectionaltheory, T is proportional to the moment
diagram and U is proportional to shearforce diagram.
– In actual, T is less than the simple
analysis prediction everywhere except at
the actual cracks.
– Similarly, U is equal with simple analysisprediction only at the location where
slopes of the steel force diagrams areequals. If the slope is greater than
assumed, bond stress is greater; if the
slope is less bond stress is less.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
8/55
Ultimate Bond Strength and Development Length
Types of bond failure
– Direct pullout of bars
(small diameter bars are usedwith sufficiently large concrete
cover distances and bar spacing)
– Splitting of the concretealong the bar (cover or barspacing is insufficient to resist thelateral concrete tension resultingfrom the wedging effect of bardeformations)
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
9/55
Ultimate Bond Strength• Direct pull out
– For sufficiently confined bar, adhesive bond and friction are overcome as the tensile force on the
bar is increased. Concrete eventually crushes locally ahead of the bar deformation and bar pulloutresults.
• When pull out resistance is overcome or when splitting has spread all the way to the end of an
unanchored bar, complete bond failure occurs.
• Splitting
– Splitting comes from wedging action when the ribs of the deformed bars bear against the concrete.• Splitting in vertical plane
• Splitting in horizontal plane: frequently begins at a diagonal crack in connection with dowel
action. Shear and bond failures are often interrelated.
• Local bond failure
– Large local variation of bond stress caused by flexural and diagonal cracks immediately adjacentto cracks leads to this failure below the failure load of the beam.
– Results small slip and some widening of cracks and increase of deflections.
– Harmless as long as the failure does not propagate all along the bar.
• Providing end anchorage, hooks or extended length of straight bar (development length
concept)
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
10/55
Development Length
• Development length is the length of embedment necessary to develop thefull tensile strength of bar, controlled by either pullout or splitting.
• In Fig., let
– maximum M at a and zero at support
– fs at a is T = Ab f s
• Development length concepttotal tension force must betransferred from the bar to the concrete in the distance ‘l ’ by bondstress on the surface.
•To fully develop the strength of bar
T = Ab f y the distance
‘l
’mustbe equal to ‘l d ’ = development length
• Safety against bond failure: the length of the bar from any point of givensteel stress to its nearby end must be at least equal to its developmentlength. If the length is inadequate, special anchorage such as hooks must
be provided.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
11/55
Factors influencing Development Length
• Tensile strength of concrete
• Cover distance
• Bar spacing
• Lateral reinforcement
• Vertical bar location relative to beam depth (bond strength reducedwith placement of bars higher from bottom)
• Epoxy coated bars or not (bond strength reduced dut to reduced
friction of epoxy coating)
• Excess reinforcement
• Bar diameter (smaller diameter bars need lower development
length
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
12/55
Factors influencing Development Length
Cover distance and bar spacing
Transvers reinforcement
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
13/55
ACI Code Provision for Development of Tension Reinforcement
Limits (c + k tr) / db > 2.5 pullout failure
(c + k tr) / db < 1.5 splitting failure
√ f’c are not to be greater than
100 psi.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
14/55
For two cases of practical importance, use (c + k tr ) / d b = 1.5 ,
Simplified Equations for Development Length
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
15/55
Further Simplification for Development Length
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
16/55
Further Simplification for Development Length
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
17/55
Example
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
18/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
19/55
Anchorage of Tension Bars by Hooks
In the event that the desired tensile stress in a bar can not be
developed by bond alone, it is necessary to provide special
anchorage at the end of the bar . [ ACI 7.1]
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
20/55
Anchorage of Tension Bars by Hooks
For stirrup and tie hooks, for bar sizes #5 and smaller, the inside
diameter should not be less than 4 bar diameters – ACI Code
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
21/55
Development Length and Modification Factors for Hooked Bars
l dh
is measured from critical section to farthest point
on the bar parallel to straight part of the bar and is:
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
22/55
l dh must be
modified byapplicable
modification
factors::
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
23/55
Requirements for Transverse Reinforcement
Transverse Steel Essential:
• When hooks required at the ends of SS beam
• Discontinuous end of beam with small cover
distance like ending at column
• Bars anchored in a short cantilever
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
24/55
ExampleDevelopment of hooked bars in tension. Referring to the beam-column joint shown,
No. 11 (No. 36) negative bars are to be extended into the column and terminated in a
standard 90° hook, keeping 2 in. clear to the outside face of the column. The columnwidth in the direction of beam width is 16 in. Find the minimum length of embedment of
the hook past the column face, and specify the hook details
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
25/55
Example
Excess rft: Asreq /Asprovided=2.9/3.12=0.93
A h R i t f
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
26/55
Anchorage Requirements for
Web Reinforcement
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
27/55
Problem 5.1
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
28/55
Diameters and Areas of Standard Rebars
F t d L d C bi ti ACI 318 08
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
29/55
Factored Load Combinations – ACI 318-08
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
30/55
D l f B i C i
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
31/55
Development of Bars in Compression
ACI basic development length incompression is greater of
I
Hooks as used for tension reinforcement are not effective in transferring
compression from bars to concrete and should be disregarded in
determining required embedment length.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
32/55
Development of Bars in Compression
Modification in Compressive l dc
l dc is not to be less than 8″
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
33/55
Basic and Modified
Compressive l dc
as per ACI 12.3
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
34/55
Bar Cutoff and Bend Points in Beams
Theoretical points of cutoff or
bend
T = As f s = M/z
T = function of (M)
ACI Code: uniformly loaded,
continuous beam of fairly regularspan may be designed using
moment coefficients.
To determine cutoff points for
continuous beams, M diagram frommax span M and max support M are
drawn
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
35/55
Bar Cutoff and Bend Points in Beams100
90
80
70
60
50
40
30
20
10
0
M o m e n t ( M
u )
B C t ff d B d P i t i C ti B
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
36/55
Bar Cutoff and Bend Points in Continuous Beams
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
37/55
100
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
38/55
100
90
80
70
60
50
40
30
20
10
0
M o m e n t ( M
u )
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
39/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
40/55
If cutoff points are in tension zone (to prevent
formation of premature flexural and diagonaltension cracks) no flexural bar shall be terminatedunless the following conditions are specified.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
41/55
• Standard Cutoff and Bend Points
• For not more than 50% of tensile steel is to be cutoff or bent
Special Requirements near the Point of Zero Moment
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
42/55
Special Requirements near the Point of Zero Moment
It is necessary to consider whenever the moments over the development length aregreater than those corresponding to a linear reduction to zero.
Bond force per unit length , u = dT / dx = dM / zdx , proportional to the slope of themoment diagram.
Maximum bond forces u would occur at point of inflection and pullout resistance isrequired.
Slope of M diagram at any point = V at that point
Let Mn = nominal flexural
strength provided by thosebars extend to the
point of inflection.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
43/55
For assumed (conservatively) uniformed slope of moment
diagram Vu towards the positive moment region, length a at M= Mn
a = M n /V u
Thus a must be greater than or equal to l d
ACI Code
•Simply support case
Structural Integrity Provisions
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
44/55
Structural Integrity Provisions
• For major supporting elements, such as
columns, total collapse can be preventedthrough relatively minor changes in bar detailingowing to accidental or abnormal loading.
• If some reinforcement properly confined iscarried continuously through a support catenaryaction of beam can prevent from total collapseeven if the support is damaged.
• ACI Code 7.13.2
Structural Integrity
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
45/55
g yProvisions
Lap Splices
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
46/55
• Supplied Lengths
– Bar # 5 - # 18 – 60 ft
– Bar # 4 and below – 20 to 40 ft
Lap Splices
• Splices at points of maximum stress should be avoided
• When used splices should be staggered
• For #11 and smaller bars simple lapping of bars is made to a
sufficient distance to transfer stress by bond
• Lapped bars a placed in contact and lightly wire bound
• Alternate way is welding and mechanical devices
• ACI does not allow lapped splices for > #11 bars• Except that #14 and #18 bars may be splice in compression with
#11 and smaller bars
Lap Splices in Tension
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
47/55
Lap Splices in Tension
• Stated in terms of development length - l d
• For calculation of l d , the usual modification factors may beapplied but NOT the excess steel modification factor
• Classification of lap splices in tension (based on minimum length
of lap required)
– Class A lap splices – 1.0 l d but not less than 12 in
– Class B lap splices – 1.3 l d but not less than 12 in
Lap Splices in Compression
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
48/55
Lap Splices in Compression
• Mainly used in columns• Bars in columns are generally terminated just above each floor
– Due to construction convenience – avoid handling long column bars
– To permit column steel area to reduce in steps
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
49/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
50/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
51/55
Comment
• Consideration for bond and detail design for
anchorage, development length and structural
integrity requirements are important to have proper
structural performance of the building.
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
52/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
53/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
54/55
-
8/18/2019 CE 419 Lec 1 Bond and Developement Length
55/55
As a design simplification, it is conservative to assume
Ktr = 0, even if the transverse reinforcement is present. theterm (c + Ktr ) / db in the denominator of accounts for the
effects of small cover, close bar spacing and confinement
provided by transverse reinforcement. The ACI codegives simplified versions of eqn 5.4 for preselected values
of (c + Ktr ) / db. However, the development length ld