Rebuilding Tasmania; Protecting Lives; Creating Jobs
CEMENT, CONCRETE, STONE & SAND
TASM
AN
IA PO
LICY
PRIO
RITIE
S 2020
-
Quarry
HEAVY CONSTRUCTION MATERIALS SUPPLY CHAIN
Sand and Stone
Concrete Batch Plant
Concrete
InfrastructureCement
Cement Shipping fromTasmanian Ports
24/7 construction demand90 minute delivery time
CC
AA
POLIC
Y PR
IOR
ITIES 2018
Cement
EFFICIENT SUPPLY CHAIN DELIVERS AFFORDABLE INFRASTRUCTURE
Quarry
HEAVY CONSTRUCTION MATERIALS SUPPLY CHAIN
Sand and Stone
Concrete Batch Plant
Concrete
InfrastructureCement
Cement Shipping fromTasmanian Ports
24/7 construction demand90 minute delivery time
CC
AA
POLIC
Y PR
IOR
ITIES 2018
Cement
EFFICIENT SUPPLY CHAIN DELIVERS AFFORDABLE INFRASTRUCTURE
HEAVY CONSTRUCTION MATERIALS SUPPLY CHAIN
www.ccaa.com.au
The COVID-19 pandemic has significantly disrupted Tasmania’s economy. The construction sector, supported by an efficient and totally local heavy construction materials supply chain, provides the engine for Tasmania’s economic recovery. Cement, concrete, stone and sand are the critical materials that enable Tasmania’s construction industry, employing 19,500 workers and contributing 57.4% Tasmania’s taxation revenue base.
IMPLEMENTING THESE CHANGES NOW WILL:
Keep people and communities safe and working
Allow Tasmania to rebuild our economy fast
Attract essential investment
Fast-track critical infrastructure for the future
Department of Treasury & Finance
Infrastructure Tasmania
State Roads Authority
Environment Protection Authority
Lack of project pipeline
Projects underfunded
Industry confidence to keep workers
Government stimulus package
Bring forward State/Local Government infrastructure projects
Fast track development approvals
Fast-track infrastructure and road-maintenancework while roads remain uncongested
24 hr site operation and access
Environment Protection Authority
Local Councils
Prescriptive technical specifications
Environmental regulations limit recycling of returned concrete
Alternative sources of aggregate easily available in concrete mixes if specific quarries closed due to COVID-19
Delay introducing new environmental regulations
Night time deliveries allowed
Transport Division
Local Government Agency
Slow last km project access approvals
Streamlined last kilometre permit applications for heavy vehicle access
24 hr product loading and sales
Priority road access
GOVERNMENT AGENCIESEnvironment Protection Authority
Mineral Resources Tasmania
INDUSTRY ISSUES
WHAT NEEDS TO CHANGE
Complex approvals process
Multiple sets of regulations & Government agencies
Resource security & urban encroachment
Fast track approvals process
Publish Strategic Resource Mapping on The LIST Dec ‘20
Implement Extractive Industry Planning Policy Dec ’20
24 hr product loading and sales
EFFICIENT SUPPLY CHAIN DELIVERS
Reducing business costs – greater payroll tax relief, remove quarry fees, remove biodiversity charges, remove land tax burden
TASM
AN
IA PO
LICY
PRIO
RITIE
S 2020
JOBS IN A RECOVERING ECONOMY
Keep port facilities open and efficient for cement
Environment Protection Authority
Mineral Resources Tasmania
Planning Authority
-
BENEFITS OF ACTING NOW:
Keeps Tasmanians in a job
Allows the construction sector to act as the engine room to rebuild the Tasmanian economy fast
Heavy construction material supply can ramp up fast
Retains industry skills and capability in Tasmania
Gives industry confidence to invest and raise capital
Delivers Government major infrastructure project plan
Drives affordable and innovative infrastructure
TASMANIA OFFICE
PO Box 1441 Lindisfarne TAS 7015
(61 3) 6491 2529
www.ccaa.com.au [email protected]
TASM
AN
IA PO
LICY
PRIO
RITIE
S 2020
1CCAA cement-concrete-aggregates-australia@ccaa_aus
15 APR
IL 2020
http://www.facebook.com/1CCAA/https://twitter.com/ccaa_aushttps://www.linkedin.com/company/cement-concrete-aggregates-australiahttps://www.ccaa.com.au/iMIS_Prod/