Download - Ch-5 Flow Analysis1 Flow The heart of plant layout and the beginning of the material handling plan
Ch-5 Flow Analysis 1
Flow
The heart of plant layout and the beginning of the material handling plan.
Ch-5 Flow Analysis 2
Flow
Flow is the continuous movement of material through the manufacturing processes and on to the customer.
Wholesalers Retailers
Primary components
Supplier 2 Customers
Information flow
Material flow
M
M
M M
Manufacturers
Supplier 1
Supplier n
Ch-5 Flow Analysis 3
Flow
If an operation with perfect flow could be established, it will nearly eliminate all waste associated with:
(1) Inventory,
(2) Storage space,
(3) Transportation,
(4) Waiting.
Ch-5 Flow Analysis 4
The Impact of Flow
Exceptional flow leads to:
(1) Lower inventories
(2) Better quality
(3) Less floor space
(4) Better communication
(5) Quicker responses to problems
(6) Faster throughput
Ch-5 Flow Analysis 5
Two Basic Types of Flow
Process orientation layout
Ch-5 Flow Analysis 6
Two Basic Types of Flow
Product orientation layout
Ch-5 Flow Analysis 7
Process-oriented layout and product-oriented layout
1. Material flow will be much smoother.
2. The distance material has to travel will be much shorter.
3. There is less confusion about which process sequence to use, or when and where finished material should be transferred into next station.
4. One concern with the product-oriented layout is the restriction of the machine capacity. Instead of using one fast, flexible, expensive machine that can produce many different parts, cheaper machines that can be used solely for one part are acquired.
In product-oriented layout:
Ch-5 Flow Analysis 8
Versatile Versus Dedicated Equipment
Ch-5 Flow Analysis 9
Flow
The following lean practices merit strong consideration:
(1) Pull system
(2) One-piece flow
(3) Cellular operation
(4) Product orientation layout (5) Balanced operations
Ch-5 Flow Analysis 10
Cellular operation
Operations must be tied together in work cell.
U cell: the best use of floor space
Ch-5 Flow Analysis 11
Flow Analysis Techniques
Flow analysis determines the path that every part takes through the plant, which minimizes
(1) distance traveled (measured in feet),
(2) backtracking,
(3) cross traffic,
(4) cost of production.
Ch-5 Flow Analysis 12
Flow Analysis Techniques
Flow analysis will assist the manufacturing facilities designer in the selection of the most effective arrangement of machines, facilities, workstations, and departments.
If you improve the product flow, you will automatically increase profitability.
A core principle of lean manufacturing is the product-oriented flow layout.
Ch-5 Flow Analysis 13
Flow routing
To establish the best arrangement of equipment, following four techniques are used:
1. A string diagram
2. A multi-column process chart
3. A from-to chart
4. A process chart
Ch-5 Flow Analysis 14
Flow routing
Example 1: 5 part-8 workstation layout.
5 parts: 1, 2, 3, 4, 5;
8 workstations: R, A, B, C, D, E, F, S.
R: receiving station
S: shipping end
Ch-5 Flow Analysis 15
String diagram
Efficiency = 35/67 = 52%
Where is the number 35 from?
Upper lines: jumping;
Lower lines: backtracking.
Ch-5 Flow Analysis 16
String diagram
Efficiency = 35/67 = 52%
Where is the number 35 from?
C-D: four paths
B-D: two paths
A-C: four paths
D-S: three paths …,
Ch-5 Flow Analysis 17
Improved string diagram
Efficiency = 35/57 = 61%
How efficiency can you make this layout?
Ch-5 Flow Analysis 18
Multi-column process chart
It uses the same routing information as used in string diagram, but in different view.
Ch-5 Flow Analysis 19
From-To Chart
The from-to chart is the most exact technique of the three. We can develop an efficiency that considers the importance of the parts. Up until now, we have considered each part as equal in importance, but the quantity and weight of each part was recorded and should be considered.
(Example 1 continued)
Ch-5 Flow Analysis 20
From-To Chart
From-To Chart of Part 1 with an equal importance value of 1.
The routing of Part 1:
RABDCFS
Ch-5 Flow Analysis 21
From-To Chart
From-To Chart –Alphabetical Layout for all 5 parts considering the importance values.
Ch-5 Flow Analysis 22
From-To Chart(Original)
From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.
Upper triangle matrix:
P.P. = Importance value X forward step(s)
Lower triangle matrix:
P.P. = IV X (2 FS)
Ch-5 Flow Analysis 23
From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.
Efficiency = 283/1077.5 = 26%
From-To Chart(Original)
Upper triangle matrix:
P.P. = Importance value X forward step(s)
Lower triangle matrix:
P.P. = IV X (2 FS)
Ch-5 Flow Analysis 24
From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.
From-To Chart(Improved)
Upper triangle matrix:
P.P. = Importance value X forward step(s)
Lower triangle matrix:
P.P. = IV X (2 FS)
Ch-5 Flow Analysis 25
From-To Chart –Alphabetical Layout for all 5 parts considering the importance values and penalty points.
Efficiency = 283/548 = 51.6%
From-To Chart(Improved)
Upper triangle matrix:
P.P. = Importance value X forward step(s)
Lower triangle matrix:
P.P. = IV X (2 FS)
Ch-5 Flow Analysis 26
Flow Diagram
The flow diagrams show the path traveled by each part from receiving to stores to fabrication of each part to subassembly to final assembly to packout to warehousing to shipping. These paths are drawn on a layout of the plant.
The flow diagram will point out problems with such factors as cross traffic, backtracking, and distance traveled.
Cross traffic:Where flow lines cross. Cross traffic is undesirable and a
better layout would have less intersection paths. Anywhere traffic crosses is a problem because of congestion and safety considerations.
Ch-5 Flow Analysis 27
Flow DiagramOne part Toolbox
Ch-5 Flow Analysis 28
Ch-5 Flow Analysis 29
Ch-5 Flow Analysis 30
Ch-5 Flow Analysis 31
Where Can One-piece Flow Processing Be Applied?
A, B, C, D are workstations, and the bar indicates the cycle time. The dash line shows takt time for the processes.
Ch-5 Flow Analysis 32
Where Can One-piece Flow Processing Be Applied?
1.The largest cycle time in the line should be less than takt time.2.The line should be balanced (The cycle times should be even).
Figure-13 shows re-balanced cycle times for the line. To balance the line, process D is taken off form the line.
Ch-5 Flow Analysis 33
Balancing Concerns
Bottlenecks: overloaded work stations (large cycle time stations) that do not have enough capacity for the prescribed load.
Bottlenecks dictate throughput.
Time saved at a non-bottleneck saves the system nothing.
Using a non-bottleneck 100% of the time does not produce 100% utilization.
The capacity of the system depends on the capacity of the bottleneck.
Ch-5 Flow Analysis 34
Managing Bottlenecks
Establish time buffer before each bottleneck.
Control the rate of material feeding the bottleneck (gate operation).
Do everything to increase capacity of bottleneck.
Adjust loads, change schedule. Loads that can be split, should be.
Ch-5 Flow Analysis 35
Push or Pull?
In a push system, the traditional manufacturing, items from one workstation are “pushed” onto the succeeding workstation indiscriminately, regardless if that plant is ready to process the items or not.
The material movement is scheduled by ‘plan.’
That plan is made some time before and based on forecasting.
This is a production-oriented approach.
Ch-5 Flow Analysis 36
Push or Pull?
A push system
Ch-5 Flow Analysis 37
Push or Pull?
The main advantages of push system are:
(a) It spreads overhead cost and continuous utilization of people and equipment.(b) It allows for the development of well-integrated production plant.
(c) It is most familiar to the employees.(d) It has the flexibility to produce various product types.
Ch-5 Flow Analysis 38
Push or Pull?
The following problems may occur in push system:
(1) High inventories (or WIP)(2) Potential quality problem (3) High floor space(4) Poor communication(5) Slow responses to problems(6) Over production or shortage(7) Queuing or starvation
Ch-5 Flow Analysis 39
Push or Pull?
In a pull system: production is triggered by the demand at the final stage. At each intermediate stage, it is triggered by its succeeding stage(s)—this process is carried all the way from the final stage to the beginning stage. Thus, the production is controlled (i.e., pulled) by demand of the succeeding stage.
The JIT (Just-in-time) system is easily implemented.
Kanban is usually a tool for ‘pull’ production system.
Lean manufacturing likes pull badly. It is a customer-oriented approach.
Ch-5 Flow Analysis 40
Push or Pull?
A pull system
Ch-5 Flow Analysis 41
Push or Pull?
The main advantages of the pull system are: (a) It is relatively inexpensive as it does not
require a comprehensive entourage of employees and information processing equipment to be functional.
(b) Inventory is not perpetual.(c) The production model reflects the actual
production better. (d) The approach leads itself to a very simple
control mechanism, best known as kanban system. The workers working in a kanban controlled production line only need to follow the simple rule: No kanban, no production.
Ch-5 Flow Analysis 42
Push or Pull?
The disadvantages of the pull system are:
(1) People and equipment may not be fully in use at all times.
(2) No detailed plans.
(3) People are unfamiliar with a pull system.
(4) It does not maintain the same level of flexibility as push system.
Ch-5 Flow Analysis 43
Push or Pull?
Spearman and Zazanis (1992) examined the behavior of push and pull production systems. After comparisons, they included three conjectures:
(1) pull systems had less congestion.(2) pull systems were inherently easier to control.(3) the benefits of a pull environment owed more
to the fact that WIP was bounded than to the practice of “pulling” everywhere.