• Make sure that company Profile Information is Correct• Admin Contact Info (Valid E-mail)• Admin Contact Preference (E-mail)• NAICS Codes Accurate Using Current
System
• Complete required subcontractor outreach (the system tells you status). If you are new to the process, read the guides and FAQ’s on the site. If you have a question, ask.
• Complete the outreach summary sheet by the due date
• Contractors – don’t forget to watch for RFQ’s for on-call lists. Some have missed opportunities because they were in the habit of only looking for bids.
BAVN TIPS
Notable Upcoming Projects
9 Stormwater Capture Projects in the Valley
East/West Valley Interceptor Sewer
Advanced Water Treatment Facilities at Hyperion and DC Tillman
Safe Clean Water Projects
Los Angels Street Civic Building