Clean Up Plan Powell River and Tributaries Watershed Water Quality Improvement Plan/TMDL Implementation Plan
Stephanie Kreps
Virginia Department of Environmental Quality
April 11, 2017: 1st Public Meeting
Pennington Gap, VA
Natural Resource Solutions
Through Science and Engineering MapTech
Powell River and Tributaries
TMDL Implementation Plan
First Public Meeting
April 2017
Natural Resource Solutions
Through Science and Engineering MapTech
What is a TMDL?
4 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
TMDL – Total Maximum Daily Load
A pollutant “budget” study to determine the maximum amount of a pollutant a water body can receive and still meet water quality standards
A TMDL Includes:
Source Assessment
Modeling
Hydrology
Water Quality
Load Allocation
Natural Resource Solutions
Through Science and Engineering MapTech
5 April 11/13, 2017
TMDL Process
Assessment
TMDL Development
Implementation Plan Development
Implementation
Unacceptable Water Quality
Acceptable Water Quality
- Determine Pollutant Load
- Determine Course of Action
- Implement Corrective Measures
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
TMDL Implementation Plan
A Document that details actions or strategies that
must be undertaken to achieve load reductions
as defined by the TMDL.
6 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
7 April 11/13, 2017
Components of an Implementation Plan
• Review of TMDL
• Corrective Actions
– Best Management Practices (BMPs), educational programs, regulatory authority, incentives
• Cost/Benefit Analysis
• Measurable Goals
• Timeline to Achieve Water Quality Objectives
– Includes monitoring plan to assess progress
• Public Participation
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
April 11/13, 2017 8
Implementation Plan for the Powell River and
Tributaries
Study
Area
Natural Resource Solutions
Through Science and Engineering MapTech
TMDL Review
* Delisted for bacteria in 2010
** Delisted for bacteria in 2012; listed for benthic in 2012 and nested in 2012.
***Nested in 2014
Impairment Year Listed Reason Listed Date TMDL Completed
Butcher Fork VAS-P18R_BUH01A04
2004 E. coli March 2011
South Fork Powell River VAS-P18R_PLL02A00
2004 E. coli March 2011
South Fork Powell River VAS-P18R_PLL01A02
1998 Benthic March 2011
South Fork Powell River VAS-P18R_PLL01A98
1998 Benthic March 2011
North Fork Powell River VAS-P20R_PWL01A00
1996, 2004 Benthic, E. coli March 2011
Powell River (near Big Stone Gap) VAS-P17R_POW01A94
1996, 1996 Benthic, E. coli March 2011
Powell River (near Dryden) VAS-P19R_POW03A00
2004 Benthic* March 2011
Powell River (near Jonesville) VAS-P21R_POW02A02
2012 Benthic** March 2011
Powell River (outlet) VAS-P23R_POW02A00
2002 Benthic March 2011
Powell River (headwaters) VAS-P17R_POW03C14
2014 Benthic*** March 2011
April 11/13, 2017 9
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
April 11/13, 2017 10
Implementation Plan for the Powell River and
Tributaries
Impairments
Natural Resource Solutions
Through Science and Engineering MapTech
Why are we here today?
11 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Two Problems!
#1 Bacteria
Bacteria levels are excessive
The condition of the stream is
harmful/deadly to aquatic life
#2 Aquatic Life
Natural Resource Solutions
Through Science and Engineering MapTech
12 April 11/13, 2017
• Fecal Bacteria in the Powell River and Tributaries
– What’s Fecal Bacteria?
• Bacteria associated with feces from humans and warm blooded animals
• (fecal coliform, E. coli)
– Why should stakeholders care?
• Pathogens (including some strains of E. coli)
• Parasites
– Water Quality Standard
• Primary contact recreation - swimming
• Single Sample Max: 235 cfu/100 ml E. coli (10% violations allowed)
• Monthly Geometric Mean: 126 cfu/100 ml E. coli
Implementation Plan for the Powell River and
Tributaries
#1 Bacteria
Natural Resource Solutions
Through Science and Engineering MapTech
#1
Bacteria Impairments
April 11/13, 2017 13
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
2010
Land
Use
April 11/13, 2017 14
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
Bacteria Monitoring ID Date Range Count Average Minimum Maximum Exceedence
6BBUH000.76 2/15/2007 - 3/26/2008 9 132 6 350 22%
6BPLL004.24 2/15/2007 - 12/3/2007 6 158 25 300 50%
6BPLL006.38 1/15/2008 - 3/26/2008 3 15 1 25 0%
6BPOW179.20 1/4/2007 - 12/6/2012 34 326 25 2,000 35%
6BPOW184.19 4/10/2007 1 10 10 10 0%
6BPOW193.38 1/4/2007 - 11/4/2008 12 388 50 1,100 75%
6BPOW194.75 1/4/2007 - 11/4/2008 12 88 25 280 8%
6BPWL001.49 2/26/2009 - 10/20/2010 11 189 25 450 27%
6BPWL004.10 2/26/2009 - 10/20/2010 11 249 25 920 45%
6BPWL006.59 2/26/2009 - 10/20/2010 11 34 25 100 0%
6BPWL010.36 2/26/2009 - 10/20/2010 11 27 25 50 0%
6BPWL017.03 2/26/2009 - 10/20/2010 11 32 25 75 0%
15 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
#1
Natural Resource Solutions
Through Science and Engineering MapTech
16 April 11/13, 2017
Bacteria Reduction Goals for
Implementation Plan
Implementation Plan for the Powell River and
Tributaries
Impairment Livestock
Direct
Cropland and
Pasture
Straight
Pipes
Urban and
Residential
Butcher Fork 100 % 0 % 100 % 0 %
South Fork Powell River 0 % 0 % 100 % 0 %
North Fork Powell River 0 % 0 % 100 % 0 %
Powell River 0 % 0 % 100 % 0 %
#1
Natural Resource Solutions
Through Science and Engineering MapTech
Residential Source Estimates
17 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Impairment
Potential
Straight
Pipes
Butcher Fork 15
South Fork Powell River 14
North Fork Powell River
(not including Straight Creek)
144
Powell River
(not including Callahan Creek
85
Total 258 #1
Natural Resource Solutions
Through Science and Engineering MapTech
Livestock Estimates
18 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
TMDL Watershed Beef
Cows
Beef
Calves Horse Sheep Hog
Butcher Fork 110 105 37 3 1
South Fork Powell River 62 60 21 1 0
North Fork Powell River
(not including Straight Creek) 168
245
16
3
1
Powell River
(not including Callahan Creek) 6
5
2
0
0
#1
Natural Resource Solutions
Through Science and Engineering MapTech
• How healthy is the benthic macro-invertebrate
community?
– Benthic (on the bottom)
– Macro (visible without a microscope)
– Invertebrate (no backbone)
• How many bugs/critters on the bottom of the
stream? And what kind?
• General indicator of water quality.
• Canary in the coal mine.
19 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
#2 Aquatic Life
Natural Resource Solutions
Through Science and Engineering MapTech
20 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Stonefly Larvae Hellgrammite
Caddisfly Larvae Beetle Larvae Mayfly Larvae
Crayfish Alderfly Larvae Fishfly Larvae Damselfly Larvae Dragonfly Larvae
Aquatic Worms Blackfly Larvae Midge (Blood Worm) Larvae
#2 Aquatic Life
Natural Resource Solutions
Through Science and Engineering MapTech
• VA Stream Condition Index (VASCI)
– Standardized sample collection and analysis
methodology
– Multimetric
– Rating scale (0 – 100)
– Less than 60 indicates an impaired benthic
community
21 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
#2 Aquatic Life
Natural Resource Solutions
Through Science and Engineering MapTech
Benthic Sampling StationID StreamName Location Sample Season VASCI
6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Spring 2013 41.1
6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Spring 2013 43.4
6BPLL001.61 S. F. Powell River Off Rt. 23 above bridge Fall 2013 64.6
6BPWL004.40 N. F. Powell River At Leeman Field Spring 2013 48.0
6BPWL004.40 N. F. Powell River At Leeman Field Fall 2013 67.9
6BPWL004.40 N. F. Powell River At Leeman Field Fall 2013 61.9
6BPOW145.95 Powell River Off Rt. 683 Fall 2010 41.1
6BPOW166.97 Powell River Rt. 58 Bridge Spring 2013 50.9
6BPOW166.97 Powell River Rt. 58 Bridge Fall 2013 78.6
1199.01-PR1-ATS Powell River Above haul road crossing Spring 2011 58.2
1199.01-PR1-ATS Powell River Above haul road crossing Fall 2011 52.9
22 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
#2
Sediment
Impairments
April 11/13, 2017 23
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
Sediment Reduction Goals for
Implementation Plan • 100% removal of straight pipes
• 23% reduction in sediment loads from
– Abandoned Mine Land (AML)
– Barren Areas
– Conventional Tillage Crops
– Disturbed Forest
– Residential
– Unimproved Pasture
– Streambank Erosion
24 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
#2
Natural Resource Solutions
Through Science and Engineering MapTech
25 April 11/13, 2017
Potential Corrective Actions Agricultural
Livestock Fencing Pasture Management Conservation Tillage Vegetated Stream Buffer
Residential Septic System Installation Alternative Waste Treatment Sewer Connection Bioretention Basins Rain Gardens Street Sweeping Vegetated Stream Buffer
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
26 April 11/13, 2017
Potential Corrective Actions
Implementation Plan for the Powell River and
Tributaries
AML, Barren, Disturbed Forest Regrading and Revegetation on
Critical Areas Vegetated Stream Buffer Reforestation of Erodible Land Re-mining Abandoned Mine Land Haul road stabilization
Other Streambank
Stabilization/Protection Storm Pond Design Wetland Development
Natural Resource Solutions
Through Science and Engineering MapTech
27 April 11/13, 2017
Cost/Benefit Analysis
• Assess cost for implementation
• Evaluate environmental benefits through modeling
• Compare cost-effectiveness of various practices
• Identify/Evaluate economic benefits of Implementation
• Identify funding sources
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
28 April 11/13, 2017
Measurable Goals/Timeline
• Phased approach
– Targeting
• Bang for the buck
• Spatial Analysis/Modeling
• Implementation milestones
• With input from Stakeholders
• Interim water quality milestones
• Modeling
• 5 - 15 year timeframe to meet water quality standard
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
29 April 11/13, 2017
Public Participation
• Public Meetings
– Informational
– Solicit public participation
– Provide a forum for public comment
• Steering Committee
– Direct the overall process
– Review output from working groups
– Review future implementation
• Working Groups
– Address “community” issues/concerns
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
Steering Committee • Includes:
– Agencies: DEQ, SWCD, VDH, DMME, NRCS
– County Representatives
– Working Group Representatives
• Responsibilities:
– Review contractor’s results
– Assess input from working groups
– Address community concerns/suggestions
– Help guide the process:
• Is there “representative” input?
• How can the process be improved?
30 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
Working Groups
• Agricultural
• Residential
• Industrial
• Meet 1-2 times
31 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
} Government
Representation
Included
Natural Resource Solutions
Through Science and Engineering MapTech
Agricultural Working Group
Responsibilities:
• Review implementation strategies from an agricultural
perspective
• Identify
32 April 11/13, 2017
o Potential constraints/opportunities
o Available technical resources
o Alternative funding
sources/partnerships
o Outreach methods
o Appropriate “measurable goals”
o Regulatory controls
o Implementation coordinator
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
Residential Working Group Responsibilities:
• Review implementation strategies from a homeowner’s perspective
• Identify
33 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
o Potential constraints/opportunities
o Available technical resources
o Alternative funding
sources/partnerships
o Outreach methods
o Appropriate “measurable goals”
o Regulatory controls
o Implementation coordinator
Natural Resource Solutions
Through Science and Engineering MapTech
Industrial Working Group Responsibilities:
• Evaluate various corrective actions, costs, tracking procedures, and technical assistance needs
• Identify
34 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
o Existing efforts
o Potential constraints/opportunities
o Available technical resources
o Alternative funding
sources/partnerships
o Appropriate “measurable goals”
o Regulatory controls
o Implementation coordinator
Natural Resource Solutions
Through Science and Engineering MapTech
“Sign-up” Cards
35 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
TMDL Implementation Plan Schedule
1. Working Group meetings: April-May
2. Steering Committee meetings: April-June
3. Draft Technical Document: August
4. Final Public meeting: September
36 April 11/13, 2017
Implementation Plan for the Powell River and
Tributaries
Natural Resource Solutions
Through Science and Engineering MapTech
37 April 11/13, 2017
Contact Information
• Virginia Department of Environmental Quality
– Stephanie Kreps, TMDL Nonpoint Source Coordinator
– (276) 676-4803
• MapTech, Inc.
– Jim Kern
– (540) 961-7864
Implementation Plan for the Powell River and
Tributaries
http://bit.do/DEQPowell-ImplementationPlanProgress
Natural Resource Solutions
Through Science and Engineering MapTech