Download - Cold Cut Systems
![Page 1: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/1.jpg)
Cold Cut Systems
![Page 2: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/2.jpg)
Industrial roof fire
Fire in roof construction during renovation Very flammable isolation materialEarly detection and quick cobra attack together with PPVIntervention was started with puncturing round the fire and secure that the fire was not spread, the fire was successfully extinguished after that.Estimated savings valued by Krister Palmkvist to €2.3 million
![Page 3: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/3.jpg)
Sports arena
Fire in roof construction started in fluorescent lamp inside sport arenaFirst indication just smell of smoke insideFire personnel inside the building was alerted by civilian passing by seeing flames from the roofSmall Cobra appliance called out and was quickly on scene Very fast suppressing of the roof fireMinimum of water damage when fire was permanently extinguishedEstimated savings valued by Krister Palmkvist €7 million
![Page 4: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/4.jpg)
Return on Investment
Copenhagen FRS First unit was placed on a specialist team,
i.e. not a first response unit. During first 12 months of service, the Cobra
participated at 100 incidentsGothenburg FRS During the first quarter 2012, the first Cobra
was called to 60 incidentsLife expectancy for a Cobra is 10-20 yearsCost can be less than €50/incident!
![Page 5: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/5.jpg)
Korn-Westheim
Old shoe factory rebuilt to provincial archives. 64 archives 200 m2 each inside the building with no openings except entrance door and normal ventilation Fire gas ventilation required by authorities. Cost estimated to 2.5 million € Technical replacement: One Cobra unit standing on the archive operated by trained municipal fire personnel in case of fire.Method: Cooling of fire gases with Cobra until below 100 degree in closed compartment and ventilate via normal ventilation systems
![Page 6: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/6.jpg)
Ovako Steel - Business Case
Steel plant in Ovako group, 3000 employees13 locations, mainly Sweden and FinlandElectric-arc furnace, smelterHigh quality bar and rod process productionFilter housed in a 15m x 30m x 20m buildingFilter investment of 75-100 million SEK
![Page 7: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/7.jpg)
Ovako - Objectives
Fire risks at filter, sparks from furnace/smelterFixed installed sprinkler at 5-6 million SEKMaintenance at 10-20% yearly of initial sprinkler investmentFire & Safety management not convinced sprinkler would work
![Page 8: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/8.jpg)
Ovako - Achivements
Reassesment of situation -> Equivalent technique and method – CobraCobra installed on 3.5 ton truck at cost of one year sprinkler maintenance, including TCFire truck donated to local FRS, including training and one year supply of consumablesOperate at FRS discretion, in return, FRS supplied maintenance of appliance and 24-7 watch
![Page 9: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/9.jpg)
Ovako – Cobra use
Cobra have been used at a hand full incidentsEach incident use a succesProduction could be held at an intact levelOvako very satisfied and applied similar solution to other plant in SE
![Page 10: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/10.jpg)
Ovako - Estimated Savings
Initial investment (alternative cost) 4.5 million SEKMaintenance >0.5 million/yearLocal community (not calculated)Production stop (each stop saved cost at cobra investment level)Insurance policy (not calculated)Total > 9 million SEK, 1 million Euro
![Page 11: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/11.jpg)
Scalable integrated response
Urban Domestic
High-rise Residential
Rural
Remote / Isolated
Urban Commercial
Large Residential
4 pump incidents
Complex Residential
Large Commercial
8 pump incidents
Large Industrial
Complex Retail &
Commercial
12 pump incidents
High Bay Warehousing
Large Complex Industrial & Commercial
15 pump incidents
Thermal Image Scanning (TIS) TIS & PPV
![Page 12: Cold Cut Systems](https://reader035.vdocument.in/reader035/viewer/2022062323/56816209550346895dd2334f/html5/thumbnails/12.jpg)
www.coldcutsystems.com