COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM
2013 WORKSHOP
WELCOME & INTRODUCTION
JARRETT SIMON DIRECTOR, ENERGY EFFICIENCY
LORETTA BATTLES ADMINISTRATION, COMMERCIAL & INDUSTRIAL
STANDARD OFFER PROGRAMS
YOLANDA SLADE PROGRAM MANAGER, STANDARD OFFER
PROGRAMS
INTRODUCTIONS (CONT.)
NEXANT TEAM JESSY SHAO DING LI KAI QIU GLEN NICOL
AGENDA
CENTERPOINT COMMERCIAL ENERGY EFFICIENCY
PROGRAMS
2012 PROGRAM SUMMARY
2013 PROGRAM OUTLINE
2013 PROGRAM HIGHLIGHTS
SUPPLIER DIVERSITY
LIGHTING SPREADSHEET OVERVIEW
Q&A
DATABASE TRAINING (IF APPLICABLE)
CENTERPOINT ENERGY 2013 COMMERCIAL PROGRAMS
COMMERCIAL ENERGY EFFICIENCY PROGRAMS
ENERGY SHARE LOAD MANAGEMENT PROGRAM DAVID DZIERSKI –
[email protected] DEMAND RESPONSE PROGRAM FOR COMMERCIALS CUSTOMERS
WITH THE ABILITY TO CURTAIL ENERGY USAGE DURING PEAK PERIODS.
PROGRAM KICK OFF – NOVEMBER 5TH, 2012
SUSTAINABLE SCHOOLS PROGRAM CHERYL BOWMAN –
[email protected] PROGRAM OFFERED TO PUBLIC AND PRIVATE SCHOOLS THAT
PROVIDE EDUCATIONAL MATERIALS AND ACTIVITIES THAT PROMOTE ENVIRONMENTALLY CONSCIOUS BEHAVIOR IN THE STAFF AND STUDENTS RESULTING IN ENERGY SAVINGS AT THE SCHOOL AND IN HOMES.
COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)
TEXAS SCORE/CITY SMART PROGRAM CHERYL BOWMAN –
[email protected] OFFERED TO SCHOOL DISTRICTS K-12, HIGHER EDUCATION, CITY AND
COUNTY FACILITIES IN THE CENTERPOINT ELECTRIC DISTRIBUTION TERRITORY. SERVICES INCLUDE PLANNING, FINANCIAL ANALYSIS, AND TECHNICAL SUPPORT.
PROGRAM KICK OFF SCHEDULED THURSDAY, NOVEMBER 29TH. OPEN TO SCHOOL DISTRICTS AND CITY OFFICIALS ONLY.
ADVANCED LIGHTING CALVIN BURNHAM –
[email protected] AWARDS INCENTIVES TO COMMERCIAL CUSTOMERS WHO INSTALL
ADVANCED, HIGH EFFICIENCY LED LIGHTING SYSTEMS FOR PARKING GARAGES, PARKING LOTS, AND OTHER OUTDOOR LIGHTING
COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)
RETRO-COMMISSIONING PROGRAM CALVIN BURNHAM –
[email protected] A PROGRAM THAT PROMOTES THE TUNE-UP OF EXISTING
COMMERCIAL AND INDUSTRIAL BUILDINGS BY EVALUATING FACILITY SYSTEMS AND IMPLEMENTING LOW-COST/NO-COST MEASURES.
HEALTHCARE MARKET TRANSFORMATION PROGRAM TARGETING MID TO SMALL HEALTHCARE FACILITIES PROGRAM OFFERINGS:
– CASH INCENTIVES FOR IMPLEMENTATION OF ELIGIBLE ENERGY CONSERVATION MEASURES
– SERVICES FOR ELIGIBLE CUSTOMERS, INCLUDE: SAVINGS CALCULATIONS, ASSISTANCE WITH MEASUREMENT & VERIFICATION, ENERGY ASSESSMENTS, RECOMMENDATIONS FOR OPERATIONAL IMPROVEMENTS, ETC.
1ST YEAR ENROLLMENT BEGINS JANUARY 2013 PROGRAM MANAGER:
CHERYL BOWMAN, 713-207-5631 - [email protected]
2012 PROGRAM SUMMARY
2012 PROGRAM SUMMARY $6.2 M ORIGINAL BUDGET
SOLD OUT MARCH 2012 WAITING PROJECTS FROM 2011 INCREASED INCENTIVE LEVEL AGGRESSIVE MARKETING EFFORTS
9 MW GOAL
EOY TOTALS $6.3 M INCENTIVES RESERVED 12.5 MW REDUCTION 139 PROJECTS SUBMITTED 1 WAIT LIST PROJECTS – NOT ACTIVATED 94 COMPLETED PROJECTS 16 CANCELLED PROJECTS
MEASURE DISTRIBUTIONRetrofit/New Construction - % Dis-tribution
1%
38%
2%5%
52%
2%Measure Type - % KW Savings
Building Auto-mationChillerDX UnitsLEDLightingVFDWindow Film
CONSTRUCTION TYPERetrofit/New Construction - % KW Savings Distribution
12%
88%
Retrofit/New Construction - % In-centives Distribution
New
Retro
SAVINGS METHODOLOGY
73%
3%
24%
M&V Methodology - % Incentives Distribution
Deemed
Full
Simplified
CUSTOMER TYPE
4%
54%
1%3%
4%
17%
4%13%
Customer Type - % Incentives Distribution
City/Government
Commercial
Data Center
Educational
Health Care
Industrial
Lodging
Retail
2012 PROGRAM CONCERNS PROVIDE PROJECT ID NUMBER WITH ALL CORRESPONDENCE
SUBMIT PA PRIOR TO CONTRACT AWARDED
REQUEST FOR PRE INSPECTIONS PRIOR TO PA SUBMITTAL
CONDUCT INSTALLATION PRIOR TO PA SUBMITTAL AND
APPROVAL
PROJECT DURATION LONGER THAN 3-6 MONTHS
AGGREGATED PROJECTS WITH LESS THAN 20 KW SAVINGS
CONTRIBUTION
USE REPLACED LIGHTING OR COOLING EQUIPMENT IN
OTHER FACILITIES
2013 PROGRAM OVERVIEW
STANDARD OFFER PROGRAM OPEN TO ALL ELIGIBLE PROVIDERS
WITHIN THE CNP TERRITORY TRANSMISSION CLASS (>69KV) ARE
EXCLUDED FIRST COME, FIRST SERVE ONE YEAR PAYOUT PAYMENTS TIED TO VERIFIED SAVINGS STANDARDIZED TERMS FOR ALL
PARTICIPANTS RETROFIT AND NEW CONSTRUCTION
MEASURES
PROGRAM ROLE
RESPONSIBILITIES
PROGRAM ADMINISTRATOR
OVERSEE THAT PROGRAMS FOLLOW PUCT RULES ADJUST PROGRAM BUDGET AS NEEDEDENTER STANDARD AGREEMENTS WITH THE PROJECT SPONSORREVIEW, APPROVE OR REJECT PROGRAM APPLICATIONSVERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSEADMINISTER INCENTIVE DOLLARS
PROJECT SPONSOR
IDENTIFY PROJECT OPPORTUNITIES• ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE
INSTALLED• MARKETING
VERIFY CUSTOMER ELIGIBILITY• CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY• CUSTOMER DOES NOT RECEIVE TRANSMISSION CLASS SERVICE
(CLASSIFIED AS INDUSTRIAL)INSTALL AND DOCUMENT ENERGY SAVINGS
CUSTOMERCONTRACT WITH PROJECT SPONSORALLOW CNP TO CONDUCT ON-SITE INSPECTIONSINSTALL AND DOCUMENT ENERGY SAVINGS
PROGRAM PARTICIPANTS ROLES
PROJECT SPONSOR REQUIREMENTS
PROJECT SPONSORS MUST HAVE:
ALL APPROPRIATE
LICENSES/CERTIFICATIONS
EVIDENCE OF TECHNICAL AND MANAGERIAL
CAPABILITIES AND EXPERIENCE
EVIDENCE OF FINANCIAL CAPABILITY
ADEQUATE INSURANCE
REFERENCES
PROJECT SPONSOR
MAY BE: NATIONAL OR LOCAL ENERGY SERVICE
COMPANIES (ESCOS) NATIONAL OR LOCAL COMPANIES THAT PROVIDE
ENERGY-RELATED SERVICES OR PRODUCTS LOCAL CONTRACTORS COMMERCIAL PROPERTY DEVELOPERS DESIGN/BUILD FIRMS ARCHITECTURAL AND ENGINEERING FIRMS INDIVIDUAL COMMERCIAL CUSTOMERS
CUSTOMER MAY BE:
ANY NON-RESIDENTIAL CUSTOMER TAKING SERVICE AT A METERED POINT OF DELIVERY AT A DISTRIBUTION VOLTAGE (<69KVA)
NON-PROFIT GOVERNMENT ENTITY EDUCATIONAL INSTITUTION
MUST ALLOW PRE AND POST INSPECTION AT CUSTOMER SITE
PROJECT ELIGIBILITY
WITHIN CENTERPOINT ENERGY ELECTRIC SERVICE TERRITORY PROVIDE ESI NUMBER, BEGINNING 100890
COMPLETE SPONSOR APPLICATION AND 5% DEPOSIT REQUIRED TO SUBMIT APPLICATION
SPREADSHEET UPLOADS MUST BE COMPLETE WITHIN THE SPONSOR APPLICATION
PROJECT ELIGIBILITY (cont.)
LARGE COMMERCIAL MINIMUM REDUCTION OF 20KW AND/OR 120,000KWH FOR
SINGLE SITE PROJECT MINIMUM REDUCTION OF 50KW AND/OR 300,000KWH FOR
AGGREGATED SITES PROJECT CUST MUST HAVE MINIMUM LOAD OF 100 KW AT PEAK,
AGGREGATE CUST MUST REACH 250KW SMALL COMMERCIAL
MAY NOT HAVE MORE THAN 100KW PEAK DEMAND AT A SINGLE SITE
MAY NOT HAVE MORE THAN 250KW AGGREGATE PEAK DEMAND
ALLOWS UP TO 20KW AND/OR 120,000KWH REDUCTION AT NON-RESIDENTIAL SITE
AGGREGATING PROJECTS SIMILAR PROJECTS SHOULD:
HAVE SAME PROJECT SPONSOR
INCORPORATE SAME MEASURES
HAVE LIKE OCCUPANCY SCHEDULES
HAVE SAME FUNCTIONAL USE
HAVE SAME ENERGY CONSUMPTION PATTERNS
COMMON MEASUREMENT &
VERIFICATION PLAN
MEASURE ELIGIBILITY PRODUCES MEASURABLE PEAK DEMAND AND/OR ENERGY
SAVINGS
10 YEARS PERSISTENCE
PEAK DEMAND IS DEFINED AS
JUNE 1 THROUGH SEPTEMBER 30, M – F, 1PM – 7PM
DECEMBER 1 THROUGH FEBURARY 28, M – F, 6AM – 10AM and
6PM – 10PM
EXCLUDING WEEKENDS AND FEDERAL HOLIDAYS
PERMANENTLY INSTALLED (NO PLUG LOAD)
EXCEEDS MINIMUM EFFICIENCY STANDARDS
EXAMPLES OF ELIGIBLE MEASURES CHILLER REPLACEMENT
PACKAGED COOLING UNIT REPLACEMENT
LIGHTING RETROFITS
LAMP AND BALLAST
MOTOR EFFICIENCY MEASURES
WINDOW FILM APPLICATIONS
ROOFING APPLICATIONS
INDUSTRIAL PROCESS MEASURES
INELIGIBLE MEASURES
FUEL SWITCHING TO ELECTRIC
MEASURES THAT REQUIRE NO CAPITAL INVESTMENT
MEASURES THAT DO NOT HAVE 10 YEARS PERSISTENCE
MEASURES THAT RECEIVE INCENTIVES IN OTHER CNP
PROGRAMS
REDUNDANT EQUIPMENT (IE BACKUP CHILLERS)
LAMP REPLACEMENTS WITHOUT THE BALLAST
REMOVABLE MEASURES (IE PLUG LOAD, VENDING MACHINES)
O&M MEASURES (IE AIR FILTERS)
PROGRAM PROCESS
SECURE AN APPLICABLE PROJECT
REGISTER AS A PROJECT SPONSOR
COMPLETE CONTRACT DOCUMENTATION, IF NEW SPONSOR
SUBMIT PROJECT APPLICATION
SIGN STANDARD AGREEMENT
SIGN PROJECT AUTHORIZATION FORM
INSTALL PROJECT
SUBMIT INSTALLATION REPORT
CONDUCT MEASUREMENT & VERIFICATION
SUBMIT SAVINGS REPORT
APPLICATION DEPOSIT APPLICATION DEPOSIT IS 5% OF
REQUESTED INCENTIVE DEPOSIT MUST BE SUBMITTED BEFORE
PROJECT APPLICATION CAN BE SUBMITTED DEPOSIT IS FULLY REFUNDABLE
PERCENT OF ESTIMATED INCENTIVE PAYMENT
RECEIVED
PERCENT OF DEPOSIT
REFUNDED75%+ 100%
50%-74.9% 50%0%-49.9% 0%
APPLICATION SUBMITTALS THE FOLLOWING INFORMATION MUST BE
SUBMITTED AS PART OF THE APPLICATION PROCESS: PROJECT INFORMATION PROJECT DESCRIPTION SITE INFORMATION SAVINGS CALCULATION ESTIMATED COMPLETION SCHEDULE QUALIFICATION SET
REFERS TO PROJECT SPONSOR
SPONSOR CONTACT SHOULD THE PRIMARY CONTACT CHANGE,
PROJECT SPONSOR SHOULD UPDATE
APPLICATION SUBMITTALS (cont.)
DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS:
LIGHTING
CUT SHEET OF THE NEW LIGHTING FIXTURE INDICATING LAMP TYPE, LAMP WATTAGE, BALLAST TYPE AND BALLAST FACTOR
DISPOSAL RECORDS OF THE REMOVED EXISTING LIGHTING FIXTURES IF FLORESCENT LAMP WAS REMOVED
LIGHTING LAYOUT INDICATING SQUARE FOOTAGE OF THE FACILITY
CERTIFICATE OF LED FIXTURE INDICATING IT IS ENERGY STAR OR NEEP APPROVED PRODUCT
COOLING
MANUFACTURER’S EQUIPMENT SPECIFICATION SHEET OF THE NEW COOLING EQUIPMENT PERFORMANCE AT ARI STANDARD CONDITIONS
CUT SHEET OF THE NEW ROOFING OR WINDOWS MATERIAL INDICATING THE INSULATION EFFICIENCY
APPLICATION SUBMITTALS (cont.)
ADDITIONAL DOCUMENTS MUST BE PROVIDED AS PART OF THE APPLICATION PROCESS IF INSTALLATION IS COMPLETED PRIOR TO PRE INSPECTION
LIGHTING
PHOTOS OF THE EXISTING LIGHTING FIXTURES INDICATING THE LAMP AND BALLAST TYPE
DISPOSAL RECORDS INDICATING THE QUANTITY OF THE DISPOSED LAMPS AND BALLASTS
DATED SALES RECEIPT/INVOICE
COOLING
PHOTOS OF THE EXISTING COOLING EQUIPMENT, SHOWING THE NAMEPLATE AND SERIAL #
MEP DESIGN OR MECHANICAL SCHEMATIC OF THE EXISTING SYSTEM
DATED SALES RECEIPT/INVOICE
WAITLIST
IN ORDER OF WHEN THE DEPOSIT WAS
SUBMITTED
WHEN INCENTIVES ARE AVAILABLE, PROJECTS
ON WAITLIST WILL BE ACTIVATED IN ORDER
INSTALLATION MAY NOT BEGIN UNTIL THE
PROJECT IS ACTIVATED AND APPROVED
M&V APPROACHES
DEEMED SAVINGS
SIMPLIFIED M&V
FULL M&V
BASED ON DATA FROM PAST DSM PROGRAMS AND INDUSTRY DATA
BASED ON ENGINEERING CALCULATIONS USING TYPICAL EQUIPMENT CHARACTERISTICS FOR PARTICULAR APPLICATIONS
REQUIRED FOR ALL MEASURES NOT MEETING CRITERIA FOR DEEMED OR SIMPLIFIED M&V
NO METERING REQUIRED REDUCE NEED FOR CERTAIN TYPES OF FIELD MONITORING BY USING STIPULATED VALUES FOR OPERATING HOURS, EQUIPMENT EFFICIENCES, ETC.
USE MORE RIGOROUS APPLICATION OF END-USE METERING, REGRESSION ANALYSIS, OR COMPUTER SIMULATIONS
MAY INVOLVE SPOT OR SHORT-TERM METERING AND SOMETIMES SIMPLE, LONG-TERM MONITORING
GENERAL GUIDELINES AVAILABLE, BUT NEED TO BE ADAPTED TO SPECIFIC MEASURE
INVOICING AND PAYMENT PERFORMANCE PAYMENT
BASED ON VERIFIED SAVINGS AND APPROVED SAVINGS REPORT
DEEMED METHOD 100% PAYMENT AFTER INSTALLATION REPORT
M&V METHOD 40% AFTER INSTALLATION REPORT 60% AFTER SAVINGS REPORT
RETROFIT APPLICATIONS BASELINE
EQUIPMENT TYPE
APPLICABLE BASELINE STANDARD
LIGHTING TABLE OF STANDARD FIXTURE WATTAGES (BASED ON EISA 2007, EPACT 2005 AND PUCT RULE)
COOLING EQUIPMENT
ASHRAE 90.1 EFFICIENCY STANDARD OF THE YEAR WHEN REPLACED SYSTEM IS MANUFACTURED
MOTORS ASHRAE 90.1M – 1995
BUILDING ENVELOPE IECC 2003
NEW CONSTRUCTION BASELINE
EQUIPMENT TYPE
APPLICABLE BASELINE STANDARD
LIGHTING EISA 2004, ENERGY STAR® OR DLC
COOLING EQUIPMENT
FEDERAL STANDARD OR 2008 CITY OF HOUSTON COMMERCIAL ENERGY CONSERVATION CODE
MOTORS
BUILDING ENVELOPE
PROGRAM RESOURCES http://www.centerpointefficiency.com:
PROGRAM ANNOUNCEMENTS PROGRAM MANUAL WORKSHOP PRESENTATION SERVICE AREA MAP PROJECT AUTHORIZATION FORM HOST CUSTOMER AGREEMENT SPEADSHEET APPLICATIONS ACTIVE PROJECT SPONSOR LISTING INFORMATION ON AVAILABLE FUNDING PROGRAM CONTACTS AND LINKS
2013 PROGRAM HIGHLIGHTS
PROGRAM GOALS/BUDGET
2013 SAVINGS GOAL 2013 INCENTIVE
BUDGET
13 MW $7 MILLION ONE PROJECT SPONSOR MAY RESERVE UP TO
20% OF THE PROGRAM BUDGET
PROGRAM TIMELINE DECEMBER 3RD, 2012 DATABASE OPENS FOR
APPLICATIONS DEPOSIT CHECKS MAY BE ACCEPTED
DECEMBER 18TH, 2012 APPLICATION SUBMITTAL DAY BEGINS AT 10AM, FIRST COME, FIRST SERVE DEPOSIT CHECK MUST BE SUBMITTED BEFORE THIS DATE IN
ORDER TO BE ELIGIBLE FOR SUBMITTAL
DECEMBER 1ST, 2013 PROJECTS INSTALLATION MUST BE COMPLETE COMPLETE DATABASE APPLICATIONS, POST INSPECTIONS TO
FOLLOW
DECEMBER 30TH, CLOSE OUT 2013 PROGRAM ALL PENDING PROJECTS SHOULD BE IN PAYMENT
PROCESS
CHANGES CONTINUING FOR 2013 LED PROJECTS SHALL REQUIRE AT LEAST ONE OF THE
FOLLOWING PROVIDED BY PROJECT SPONSORS: ENERGY STAR © QUALIFIED DESIGN LIGHT CONSORTIUM QUALIFIED PRODUCTS LISTING PREVIOUSLY UTILITIES REVIEWED AND APPROVED LED PRODUCT
STANDARD T8 BECOMES MINIMUM EFFICIENCY REQUIREMENT FOR NEW LIGHTING FIXTURE
VARIOUS INCENTIVE RATE BY MEASURE TYPE Relamping is allowed with discounted incentive rate (30% of the
non-LED lighting incentives) CUT SHEETS, SQUARE FOOTAGE & ALL PERTINENT
DOCUMENTS ARE DUE AT THE TIME OF PROJECT SUBMITTAL RECYCLE CERTIFICATES OF LAMPS REQUIRED ON ALL
LIGHTING PROJECTS
2013 INCENTIVE RATESMEASURE TYPE $/KW $/KWH
LIGHTING – FLOURESCENT, HID, CFL
120 .04
LIGHTING – LED 210 .08
COOLING – DX UNITS 240 .09
COOLING – CHILLER 260 .11
MOTOR 235 .09
VFD 180 .07
WINDOW FILM 200 .08
WINDOW REPLACEMENT 210 .08
ROOFING 240 .09
OTHER MEASURES 175 .06
NEW CHANGES PROJECT APPLICATION REQUIREMENT
REVIEW PROCESS BEGINS ONLY UNTIL ALL REQUIRED DOCUMENTS SUBMITTED. INCENTIVES ARE NOT SECURE AT THIS MOMENT.
MODIFY PA WITHIN14 CALENDAR DAYS FROM PA SUBMITTED WILL NOT AFFECT DEPOSIT
MINIMUM SAVINGS REQUIREMENT 20KW AND/OR 120,000KWH FOR SINGLE SITE 50KW AND/OR 300,000KWH FOR AGGREGATED SITES
LAST YEAR TO INCENTIVIZE T12 RETROFITS UPDATED DEEMED FACTORS
LIGHTING – UPDATED HVAC INTERACTIVE FACTORS COOLING – UPDATED DEMAND AND ENERGY COEFFCIENTS
UPDATED BASELINE EFFICIENCY STANDARD COOLING – APPLICABLE ASHRAE 90.1EFFICIENCY LEVEL ACCORDING TO
YEAR OF MANUFACTURE OF THE REPLACED SYSTEM
GETTING STARTED REGISTER AS PROJECT SPONSOR IN ENERTREK
VIA DATABASE CHECK WEBSITE AT
WWW.CENTERPOINTEFFICIENCY.COM FOR LATEST INFORMATION
SEND HARD COPY OF APPLICABLE FORMS AND DEPOSIT TO:
CENTERPOINT ENERGYATTENTION: YOLANDA SLADE1111 LOUISIANA, 9TH FLOORHOUSTON, TX 77002
SUBMIT DAY
DECEMBER 18, 2012 @ 10:00 AM, CENTRAL TIME
**IN ORDER TO SUBMIT YOUR PROJECT, CNP MUST
HAVE YOUR DEPOSIT BEFORE DECEMBER 18, 2012!**
SUPPLIER DIVERSITY
SUPPLIER DIVERSITY POLICY STATEMENT
CENTERPOINT ENERGY, INC. RECOGNIZES THE IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF.
THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.
SUPPLIER DIVERSITY
CENTERPOINT ENERGY JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; [email protected]
STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR
(713)207- 3388; [email protected]
HOUSTON MINORITY BUSINESS COUNCIL
CONSTANCE JONES (713)271–7805; WWW.HMBC.ORG
WOMEN’S BUSINESS ENTERPRISE ALLIANCE
APRIL DAY (713)681–9232; [email protected]
2013 LIGHTING WORKBOOK OVERVIEW
2013 LIGHTING WORKBOOK
CHANGES INELIGIBLE FIXTURES
STANDARD 4’ T8’SNEED “CEE” DESIGNATION TO QUALIFY
SCREW IN CFL’SALL T12ALL INCANDESCENTALL MERCURY VAPORALL HIGH PRESSURE SODIUMSTANDARD METAL HALIDE
2013 LIGHTING WORKBOOK
ENHANCEMENTS RE-LAMP
LAMP REPLACEMENT ONLY REMOVE A LINE DETECT INELIGIBLE FIXTURES
2013 LIGHTING WORKBOOK
ENHANCEMENTS CENTRAL WATTAGE TABLE ADDITIONS SCREW IN CFL’S
150 WATT 65 WATT
T5HO 54 WATT 51 WATT 49 WATT 24 WATT
2013 LIGHTING WORKBOOK
ENHANCEMENTS FIXTURE BUILDER
EASY TO ENTER CUSTOM FIXTURES
STANDARDIZES NAMING CONVENTION
TRIGGERS CORRECT INCENTIVE IN WORKBOOK
QUESTIONS?
CONTACT INFORMATIONYOLANDA SLADE
PHONE: 713-207-7762 EMAIL – [email protected]
LORETTA BATTLES PHONE: 713-207-3543 EMAIL – [email protected]
WEBSITE: WWW.CENTERPOINTEFFICIENCY.COM