COMMISSIONING
HYDRO POWER STATION
-
7/28/2019 commissioning of hydro.ppt
2/59
-
7/28/2019 commissioning of hydro.ppt
3/59
Dam
Reservoir
Power intake (Penstock)
Power house
Turbine
Draft tubeMain inlet valve
Generator
Bus Duct
Field Excitation System
Governing System
SCADA System
Station Transformer
Balance of PlantProtection system & switchgear
LV/ HV distribution
DC, UPS Battery
Switch Yard
Following are the main components of a Hydroelectric Power Plant
INTRODUCTION
-
7/28/2019 commissioning of hydro.ppt
4/59
Dome
Stator
Rotor
Generator Shaft
Turbine Shaft
Spiral Casing
Stay Ring
Runner
Draft Tube
-
7/28/2019 commissioning of hydro.ppt
5/59
-
7/28/2019 commissioning of hydro.ppt
6/59
-
7/28/2019 commissioning of hydro.ppt
7/59
-
7/28/2019 commissioning of hydro.ppt
8/59
-
7/28/2019 commissioning of hydro.ppt
9/59
COMMISSIONING
Definition
Testing of new equipments to checkits conformity with contractualspecifications, as well as operation ofthe equipment until formallyaccepted by the Customer.
Commissioning usually occurs afterfirst erection of a new unit.
-
7/28/2019 commissioning of hydro.ppt
10/59
Commissioningactivities consistof various tests:
Pre-commissioning tests
Prior to filling waterways
After filling waterways
Initial Run test
Test Run
COMMISSIONING
-
7/28/2019 commissioning of hydro.ppt
11/59
READINESS CRITERION
Commissioning activities in hydro project begin with the filling of waterways on
the down stream side (common tailrace) and up stream side (Head Race or
Penstock) of the machine. This implies readiness of hydro set which broadlycomprises of following equipments and their readiness criteria :
1. Draft Tube and Liner, Spiral casing, Tail Race Channel, Penstock and gates etc. for
their erection and checks from the point of view of cleanliness, civil grouting work for
the hollow portions between metal and concrete contact surfaces etc.
2. It is to be ensured that there is no impediments in the free flow of water from any
projecting lumps of concrete/reinforcement rods etc.
3. The grouting plugs have been welded and flush grinded as per Drawing requirement
and no obstruction exists from any local bending of metallic liners etc. in the water
path.
4. Painting work of underwater parts with black anticorrosive paint has been completed.
-
7/28/2019 commissioning of hydro.ppt
12/59
The Machine itself has been made ready mechanically along with its auxiliaries. This will
include the following major equipments/systems/works and other preparations :
Turbine & Turbine Pit :
1. Runner blade and chamber clearances have been checked and found OK to ensure that
no rubbing is likely to occur during start up and running.
2. Air inflated repair seal of Turbine shaft is OFF and cooling water to working seal willbe available when CW system is charged.
3. Turbine bearing oil is at proper level neither too high nor too low let the drawing be
followed at this stage. Keep record of pumping holes in the skirt if provided-whether
plugged and how many.
4. Manual/Auto greasing of guide vanes etc. has been done for smooth operation.
5. Easy mobility along with sufficient lighting both AC/DC provided in the pit.
READINESS CRITERION
-
7/28/2019 commissioning of hydro.ppt
13/59
6. Dry stroking of guide apparatus/ MIV have been done upto full rated oil pressure of
OPU through governor. Record Opening/Closing and damping times.
7. Dowelling work etc. of bearing housing etc. has been completed.
8. Fulfillment of all requirements given in O&M manuals/check lists of the project to
be ensured.
9. De-watering of draft tube checked twice by closing the draft tube gates.
10. Turbine top cover drainage system is operational and in Auto to avoid turbine pit
flooding during first filling of TRC and subsequently during penstock filling etc.
Preferably additional pumping arrangement, not dependent on Electric Supply (i.e.
Air Operated) be provided as quantity of leakage water from shaft, Guide vane cup
seals, etc. is not known at this time. This is more necessary when starting a machineafter a long delay after erection.
READINESS CRITERION
-
7/28/2019 commissioning of hydro.ppt
14/59
Generator & Generator Barrel :
1. Generator and its sub assemblies have been fully erected as per drawing and cleaned
with dry compressed air/cloth. Check top and bottom air guide clearances whichshould be at least 8-10 mm ( as per drawing requirement) from the rotor fan blades.
2. Stator/Rotor gap must be free from any foreign object which is usually checked by
taking a rope all around the gap along the full height of the stator core.
3. Check and ensure that Generator barrel/bracket areas are free from foreign objects,hanging wires/cables, loose electrical connections, loose clamps etc.
4. Bearing vapour seal segments may not be assembled in position during initial runs to
avoid likelihood of rubbing until performance in terms of vibration and wobble is
proved up to full speed (This is not applicable for vapour seals of wool felt type).
5. Initial bedding of slip ring carbon brushes, cleaning of slip rings etc. has been done.
Carbon brushes to be kept disengaged from the slip rings, during initial runs as no
excitation is to be given during this time. Should be in for proper bedding .
READINESS CRITERION
-
7/28/2019 commissioning of hydro.ppt
15/59
6. Dowelling of stator frame/brackets etc. has been done and secondary concreting of
Stator and lower bracket foundations have fully cured. Epoxy grouting of foundationbolts to be ensured. Tightening of all bolts and their locking particularly of the
rotor/rotor lead clamps/pole to pole joints etc. to be carefully checked.
7. Generator Barrel water mist Fire Extinguishing system commissioned and kept ready in
manual/Auto mode, which is to be switched on prior to voltage build up/
synchronisation/loading.
8. Brake system is already tested for reliable lifting and release 10 times from HP
compressor/pressure reducer air system or L P air system along with Limit Switch
operation for indication/control. Free operation of brakes to be ensured. Auto operation
of Brake is to be disabled during initial period (Brake Air Pressure should be adjusted
for 4-5 Kg/cm2
). Brakes should be applied at a speed as given in design which is usually20 to 25% of rated speed). Required oil should be filled up in air filter unit.
READINESS CRITERION
-
7/28/2019 commissioning of hydro.ppt
16/59
9. Generator bearings oil should be at proper level as per Drawing and this should be
marked in gauge glass. Operation of low/high level float switches should be checked.
10. Performance of HS Lube system to be proved. Check lifting of Rotor from HS lube
pressure by 4 dial gauges placed at X and Y positions i.e at 4 points to know
amount and uniformity of lift all around. The HS Lube pressure should not exceed
specified design value. Safety relief valve to be adjusted depending on the pressure
required for jacking. HP lub oil pressure switches/gauge to be adjusted for normal &
low pressure. Ensure no loose connections in the electrical circuits to avoid sparking
and consequent fire hazard in these enclosed spaces.
READINESS CRITERION
PRE REQUISITES FOR
-
7/28/2019 commissioning of hydro.ppt
17/59
1. 440 V 3 Phase AC supply
2. 240 V 1 Phase A.C. supply
3. 220 V DC or 110 V D.C. Power supply system
4. 48 V DC Power supply system
5. Dewatering, Drainage and leakage collection system and their pumping arrangement.
6. 11 KV or 13.75 KV along with cable etc. for commissioning of excitation system.
7. 24 V DC power supply system.
8. The intake gates, draft tube gates and butterfly valves are tested for safe and reliable
operation and equipped with operator personnel and telephonic connection .
9. Oil supply system.
10. Compressed air system.
11. Completion of cable laying , termination @ earthing
12. 240 V AC UPS supply.
PRE- REQUISITES FOR
COMMISSIONING
PRE REQUISITES FOR
-
7/28/2019 commissioning of hydro.ppt
18/59
13. Readiness of water conducting system .
14. Civil works in the vicinity of active and sensitive electrical and mechanica
machinery/equipment are finalized. Floors are clean and dry.
15. Station earthling system is in full and reliable condition.
16. Main fire fighting system for the power house cavern in safe operating
condition, including the portable fire extinguishers.
17. Ventilation, illuminations, communication, and Air-conditioning available
on a permanent base.18. Readiness of protective covers, guards ladders and covering of floor holes
and pits.
PRE- REQUISITES FOR
COMMISSIONING
PRE COMMISSIONING
-
7/28/2019 commissioning of hydro.ppt
19/59
PRE-COMMISSIONING
TEST/CHECKS
Pre-commissioning
Tests:
Test between completion oferection of the equipment andinitial run.
Tests/Checks prior to filling
waterways Tests/Checks after filling of
waterways
TEST/CHECKS PRIOR TO
-
7/28/2019 commissioning of hydro.ppt
20/59
TEST/CHECKSPRIORTO
FILLINGWATERWAYS1. Inspection of all the turbine waterways and removal of all
foreign or loose objects.
2. Calibration of scales for wicket gate opening and whereapplicable, for runner blades, needles and deflectorsincluding their cam relationships; and also measurementof clearances.
3. Operation of pressure oil units, MIV, governors, automaticand manually operated starting and stopping devices andsignaling devices.
4. Oil levels and pressures in governing system; Condition ofall oil filters.
TESTS/CHECKS PRIOR TO
-
7/28/2019 commissioning of hydro.ppt
21/59
TESTS/CHECKSPRIORTO
FILLINGWATERWAYS
5. Protective devices such as oil level and temperature alarms and
relays, with adjustment if needed.
6. Times of opening and closing of governing elements, i.e. wicket
gates, runner blades of turbines with movable blades, needles
and deflectors of impulse turbines.
7. MIV opening and closing times.
8. Bearing and seal clearances and functioning of hydrostatic
lubrication system.
TESTS/CHECKS PRIOR TO
-
7/28/2019 commissioning of hydro.ppt
22/59
TESTS/CHECKSPRIORTO
FILLINGWATERWAYS
9. Operation of drainage pumps and dewatering pumps.
10. Oil, grease and water supply to all bearings and seals
requiring lubrication or cooling.
11. Operation of braking system of the unit.
TESTS/CHECKS
-
7/28/2019 commissioning of hydro.ppt
23/59
TESTS/CHECKS
AFTERFILLINGWATERWAYS
1. The Tail water gate shall be opened first after filling the draft
tube and spiral case up to tail water level through a fillingvalve of the draft tube gates. Check for leaks is to be made.The whole waterway should be filled slowly and manuallythrough a bypass valve of the penstock.
2. Operation of emergency protection devices which actuatesthe intake gate/MIV and closure of guide vanes and stoppageof machine is to be checked.
3. If the protective devices and emergency closing system work
satisfactorily, and no unusual leakage or deformation isobserved, Initial run of the Machine can be initiated.
-
7/28/2019 commissioning of hydro.ppt
24/59
INITIAL RUN
After the permission for initial run, locking devices and brakes are
released and the turbine wicket gates or needles are openedunder manual control, slowly as per manufacturersrecommendations and bring the speed up to at least the minimumstated value.
If any noise, scraping or other abnormal phenomena is observed,the unit should be shut down immediately and thorough inspectionis to be carried out to find out the cause of the problem and rectifythe same.
-
7/28/2019 commissioning of hydro.ppt
25/59
Time
Unit speed
Servomotor stroke
Temperature of bearing
Shaft run out
MeasurementsItems:
Tachometer
Dial indicatorInstruments to
be used:
INITIAL RUN
TEST RUN
-
7/28/2019 commissioning of hydro.ppt
26/59
TEST RUN
Mechanical Spinningwithout Excitation
Spinning with Excitation
Synchronization with thegrid
Load run and LoadRejection Tests
Test
Runconsistsof :
MECH SPINNING WITHOUT
-
7/28/2019 commissioning of hydro.ppt
27/59
MECH. SPINNINGWITHOUT
EXCITATION
1. The unit is kept under manual control at or above starting
speed until bearing temperatures are stabilized.
2. If any temperature is excessive or increases too rapidly, the
unit shall be shut down and the causes of this phenomenon is
to be investigated and corrected.
3. If all goes well, the unit speed shall be increased in
prearranged steps up to the rated value, remaining at each
successive speed until the rate of rise of all bearing
temperatures is satisfactory to the manufacturer'srecommendation.
MECH. SPINNINGWITHOUT
-
7/28/2019 commissioning of hydro.ppt
28/59
During each speed step of test run, at least the followingmeasurements / observations should be made:
1. Deformation of covers and bearing supports
2. Noise or vibration in the turbine and/or generator
3. Operating conditions for the oil pressure and other pumps.
4. Condition of oil in the bearings and pressure oil systems. If
water is observed in oil, the leaks shall be located andeliminated. If oil foaming is observed, the cause shall belocated and eliminated.
5. Temperatures of bearings and lubricating oil.
6. Shaft run out at turbine and generator bearings and axialdisplacement of rotating parts is measured.
7. At some agreed speed value, the action of braking systemshall be checked.
M C . S GW OU
EXCITATION
MECH. SPINNINGWITHOUT
-
7/28/2019 commissioning of hydro.ppt
29/59
Tachometer
Vibration meter (Structure)
Dial indicator
Thermometer
Instrumentsto be used:
. SEXCITATION
SPINNING WITH EXCITATION
-
7/28/2019 commissioning of hydro.ppt
30/59
SPINNINGWITH EXCITATION After bearing run, the machine is prepared for short
circuit test.
For this test, we do three phase shorting at generator
terminal then the excitation is increased from zero up
to the full load stator current.
During this test, operation and stability test of
differential protections are also checked.
After SCC test, we go for high voltage test for statorwinding.
BASIC TESTCIRCUITFOR SCC TEST
SCC TEST
-
7/28/2019 commissioning of hydro.ppt
31/59
SCC TEST
A
B
SCC TEST
-
7/28/2019 commissioning of hydro.ppt
32/59
C
SCC TEST
SCHEMATICCONNECTIONDIAGRAMFOR
-
7/28/2019 commissioning of hydro.ppt
33/59
SCC TEST
HV TEST FOR STATOR WINDING
-
7/28/2019 commissioning of hydro.ppt
34/59
HVTESTFOR STATORWINDING Used for testing the dielectric strength of generator
stator winding insulation.
For less than 10MW, test voltage (r.m.s.) shall be1000V+2*Rated voltage; subject to minimum of 1.5kV.
For machines with a rated voltage 6 kV or greater,
when power frequency equipment is not available, then
by agreement a DC test may be carried out at a voltage
1.7 times the r.m.s. values to be chosen in case of ACtest.
For more than 10 MW, Test Voltage (r.m.s.) shall be
For voltage less than and equal
to 24kV
2*Rated voltage + 1000 V
For voltage more than 24kV Subject to agreement
OCC TEST
-
7/28/2019 commissioning of hydro.ppt
35/59
OCC TEST
After successfully completing the HV test, OCC test is
carried out.
In OCC test, excitation cable is restored and voltage isbuild up to rated voltage in steps of 1KV. Then, Open
Circuit Characteristic Curve is drawn.
Operation of Stator earth fault protection is also checked by
creating actual earth and performance test of all voltage
relays is also carried out .
BASIC TESTCIRCUIT
FOR OCC TEST
SCHEMATICCONNECTIONDIAGRAMFOR
-
7/28/2019 commissioning of hydro.ppt
36/59
OCC TEST
SYNCHRONIZATIONWITHTHE GRID
-
7/28/2019 commissioning of hydro.ppt
37/59
Phase sequence of Generator voltage and Gridvoltage must be the same.
Two voltages must be equal, i.e. IV1I - IV2I=0.
The generator frequency must be nearly equal tothe Grid frequency, i.e. f1- f2 0.
At the instant of synchronizing, the two voltagesmust be almost co-phasal, i.e. 12 0.
The
followingconditionsmust besatisfied:
Finally the machine is synchronized with the grid at
the partial load.
SYNCHRONIZATIONWITHTHE GRID
-
7/28/2019 commissioning of hydro.ppt
38/59
The degree of criticality of these parameters are in thefollowing order:
,V,f.
The inertia of the incoming machine being very smallagainst that of the grid, even with considerable f, themachine will easily be pulled into synchronism.
Voltage difference, if large, can result in heavy exchange ofVAR and can result in voltage fluctuations, if large enoughleading to instability.
Large can result in heavy exchange if MW, often goodenough to cause torsional damage to the shaft system.
LOAD RUN ANDLOAD REJECTION TESTS
-
7/28/2019 commissioning of hydro.ppt
39/59
LOAD REJECTION TESTS
When the generator and switching equipment has been
declared ready for operation , the unit is synchronized.
During the load rejection tests, all necessary precautions shallbe taken to ensure that rated values of penstock andturbine stresses will not be exceeded. Such precaution
may include setting governor timing.
When adjustments are made on governor or regulating devicesall tests which might be affected by the adjustment shallbe repeated.
LOAD RUN ANDLOAD REJECTION TESTS
-
7/28/2019 commissioning of hydro.ppt
40/59
To check the output of the unit with an agreedaccuracy.
To check the unit for instability, vibration orcavitations in the range of guaranteed loads.
To check the functioning of governor andregulating devices, as well as that of the entireunit.
To determine the momentary pressure and speedvariations of the unit and to find their extremevalues. To adjust the closing times of the wicketgates, needle valves and deflectors to minimizeover speeding of the unit within the permissiblelimit of pressure variation
To permit testing of the operation of otherhydraulic and electrical equipment, includingprotection and other automatic devices.
PURPOSES:
LOAD REJECTION TESTS
LOAD RUN ANDLOAD REJECTION TESTS
-
7/28/2019 commissioning of hydro.ppt
41/59
PROCEDURE:
The load shall be increased in steps and load rejection test made at
successively higher loads up to the maximum expected to be placedon the unit. For example: rejections may be made at 25%, 50%, 75%and 100% of the rated load as well as from the maximum load thatmay be agreed upon.
Two rejections shall be made at each load. One rejection is made
under governor control to no load gate or needle opening, the othermay be an emergency shutdown by stop solenoid.
If specified, load rejection tests shall be made by means of theemergency valve or by any other emergency device.
After the completion of each load rejection test, the pressure rise andturbine speed rise data shall be analyzed to ensure that the specifiedsafe limits will not be exceeded during the next higher load rejectiontest.
LOAD REJECTION TESTS
LOAD RUN ANDLOAD REJECTION TESTS
-
7/28/2019 commissioning of hydro.ppt
42/59
Observations, Measurements and Recordings:
LOAD REJECTION TESTS
Head and tail water level
Generator output.
Wicket gate or needle opening (where applicable)
Pressure at turbine inlet and outlet
Pressures and levels in oil pressure systems
Operating times of oil pressure pumps.
Temperatures in bearings.
Noise levels, if values are specified in thecontract.
Abnormal noises if any.
Vibration and other displacement of rotating andfixed parts.
Action of air-admission devices if any.
Applicablefor SteadyState
Operation:
LOAD RUN ANDLOAD REJECTION TESTS
-
7/28/2019 commissioning of hydro.ppt
43/59
Observations, Measurements and Recordings:
LOAD REJECTION TESTS
Head and tail water levels Generator output
Strokes and closing times of wicket gates orneedles where applicable.
Pressure at the turbine inlet and outlet.
Level variations at intake and surge tanks
Pressure drop in the oil pressure system in theprocess of governing, and variation of level inthe oil pressure reservoir.
Noise levels, if values are specified in thecontract.
Abnormal noises, if any.
Vibration and other displacement of rotating andfixed parts.
Action of braking jets in case of Pelton turbine.
Load
rejectionand
subsequenttests:
COMMERCIAL RUN
-
7/28/2019 commissioning of hydro.ppt
44/59
COMMERCIAL RUN
After meeting all the
contractual requirements of
operation, the machine canbe declared ready for
Commercial Run.
-
7/28/2019 commissioning of hydro.ppt
45/59
ILLUSTRATIVE
PHOTOGRAPHS
Generator Barrel & Turbine Pit
-
7/28/2019 commissioning of hydro.ppt
46/59
-
7/28/2019 commissioning of hydro.ppt
47/59
-
7/28/2019 commissioning of hydro.ppt
48/59
STATOR SECTION
-
7/28/2019 commissioning of hydro.ppt
49/59
GENERATOR
ROTOR
LOWERING OF ROTOR
-
7/28/2019 commissioning of hydro.ppt
50/59
-
7/28/2019 commissioning of hydro.ppt
51/59
DRAFT TUBE
ERECTION
-
7/28/2019 commissioning of hydro.ppt
52/59
STAY RING
SPIRAL CASING
-
7/28/2019 commissioning of hydro.ppt
53/59
HYDROSTATIC
TESTING
TURBINE RUNNER
-
7/28/2019 commissioning of hydro.ppt
54/59
TURBINESHAFT
-
7/28/2019 commissioning of hydro.ppt
55/59
TOP COVER & TURBINEASSEMBLY
-
7/28/2019 commissioning of hydro.ppt
56/59
ASSEMBLY
LOWER BRACKET
-
7/28/2019 commissioning of hydro.ppt
57/59
LOWER BRACKET
ASSEMBLY OF MIV
-
7/28/2019 commissioning of hydro.ppt
58/59
BUTTERFLY TYPE SPHERICAL TYPE
-
7/28/2019 commissioning of hydro.ppt
59/59