Common Permit by Rule Authorizations in Texas
Joe ShineAir Permits Division
Texas Commission on Environmental QualityEnvironmental Trade Fair 2014
![Page 2: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/2.jpg)
Permit by Rule 106.A3168Alchemy
Definition - the ability to transform base metals into the noble metals (gold or silver)
![Page 3: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/3.jpg)
Alchemy
![Page 4: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/4.jpg)
Permit by Rule 106.A3168Alchemy
Rule language –
Equipment and facilities used for the process of alchemy is permitted by rule.
![Page 5: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/5.jpg)
Today’s Topics
General Information About Using PBRs
Most Common PBRs
What to Include in the Application
New Processes
![Page 6: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/6.jpg)
Using a PBR
Pros Other Considerations
No circumvention
No partial permitting
No customization
Lower fees
Faster response time
Quicker response time Lower fees Cannot customize – all or nothing Cannot partially permit a process Cannot circumvent permitting
![Page 7: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/7.jpg)
Using a PBR
Claiming vs. Registering◦Claiming – Keep records to show compliance
with all rules and regulations◦Registering – Submitting documentation to
TCEQ and paying a fee
Certification vs. Registration◦PI-7◦PI-7CERT or APD-CERT
![Page 8: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/8.jpg)
Most Common PBRs
§106.433 – Surface Coating §106.452 – Dry Abrasive Cleaning §106.261/262 – Facilities 470 series – Tanks, Loading, Storage 140 Series – Aggregate & Pavement §§106.352, 359, 492, 512 – Oil and Gas
![Page 9: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/9.jpg)
Surface Coating
![Page 10: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/10.jpg)
§106.433
Enclosed vs. non-enclosed surface coating
13 tpy VOC vs. 25 tpy VOC
Exempt solvents
Process MSS vs. non-process MSS
![Page 11: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/11.jpg)
§106.433
MSDS: technical and air quality data
Calculations
◦Surface Coating Facilities Guide
◦Calculation Spreadsheet for Estimating Emissions
Chapter 115, Federal Standards, MSS
![Page 12: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/12.jpg)
Dry Abrasive Cleaning
![Page 13: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/13.jpg)
§106.452
Enclosed vs. non-enclosed
Blast media Distance limits Usage limits MSS
![Page 14: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/14.jpg)
Facilities
![Page 15: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/15.jpg)
§106.261 and §106.262
Only use when there is not a more specific rule
Account for all upstream/downstream impacts
MSS Represent all associated NSR Permits Certify major sites
![Page 16: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/16.jpg)
§106.261 and §106.262 Common Issues
Can you use current version of TLV? Annual submittal ◦Easier, cheaper when prepared all together ◦We allow “portable” annual notifications
if each site < 5 tpy
![Page 17: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/17.jpg)
§106.261 and §106.262Limits
6 lb/hr & 10 tpy 1 lb/hr & 4.38 tpy E=L/K Net increase on new hour Netting Is it okay to exceed permitted allowable?
![Page 18: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/18.jpg)
Tanks, Storage, and Loading
![Page 19: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/19.jpg)
§106.470 - §106.478
Authorizes:◦New construction◦New service of existing tank◦Change of service
Is “tank memo” still in effect?◦Using PBRs §106.261 and §106.262
![Page 20: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/20.jpg)
Aggregate & Pavement
![Page 21: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/21.jpg)
§106.141- §106.150
Calculations: AP-42 and throughput Using engines? §106.4(a)(4) ◦PM10 limit = 15 tpy
◦PM2.5 limit = 10 tpy
Include a project description
![Page 22: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/22.jpg)
§106.141- §106.150
MSS: process vs. non-process Include a plot plan RFC (site review) required Distance limitations
![Page 23: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/23.jpg)
Oil and Gas Sites
![Page 24: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/24.jpg)
Oil and Gas §106.352 - Oil and Gas Handling and
Production Facilities §106.492 - Flares §106.512 - Stationary Engines and
Turbines §106.359 - Planned Maintenance, Startup,
and Shutdown (MSS) at Oil and Gas Handling and Production Facilities
![Page 25: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/25.jpg)
PBR Options – Location
In Barnett Shale counties
• New – 30 TAC §106.352(a)-(k)
• Existing – 30 TAC §106.352(l)
Not in Barnett Shale counties
• New & existing – 30 TAC §106.352(l)
• May voluntarily register under §106.352 (a)-(k)
![Page 26: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/26.jpg)
Barnett Shale Counties
![Page 27: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/27.jpg)
§106.352(l)
§106.352 (l)◦Sweet:
No registration required, meet §106.4 limits, and keep records
◦Sour (> 24 ppm H2S): Registration required ¼ mile distance limit, 4.0 lb/hr limit of sulfur
compounds, vent height requirements
![Page 28: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/28.jpg)
§106.352(a-k)
§106.352 (a-k)◦Notification and registration through ePermits
system◦Notification - Prior to construction or
implementation of changes◦Registration
Level 1 - Within 180 days from start of operation Level 2 - Within 90 days from start of operation
![Page 29: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/29.jpg)
§106.492 and §106.512
§106.492◦May be used in combination with §106.352 (l)◦May require certification
§106.512◦May be used in combination with §106.352(l)◦Requires registration if > 240 hp ◦May require certification
![Page 30: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/30.jpg)
Submitting
the
Application
![Page 31: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/31.jpg)
Application Admin. Documents Preferred Order
Cover letter Core Data Form PI-7, PI-7-CERT, APD-CERT Copy of check or ePay voucher
![Page 32: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/32.jpg)
When Do I Need to Certify?
Emission limitations for Title V applicability Federal applicability Control/destruction efficiency claims Operating hours
![Page 33: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/33.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables
![Page 34: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/34.jpg)
Summary of Emissions
![Page 35: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/35.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/NAAQS Applicability Lab analysis Maps Tables
![Page 36: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/36.jpg)
Lab AnalysisSite Specific/Representative
Guidance at www.TexasOilandGasHelp.org
Three criteria◦Reservoir/formation◦API gravity◦Process/treatment
![Page 37: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/37.jpg)
Application Technical Documents Preferred Order
Introduction Table of Contents Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables
![Page 38: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/38.jpg)
New Processes
and Changes
New Processesand
Changes
![Page 39: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/39.jpg)
Enhanced Application Review (E.A.R.)
Purpose E-mail notification ◦[email protected]
Expectations Approval letter will be sent through e-mail
unless specified otherwise.
![Page 40: Common Permit by Rule Authorizations in Texas](https://reader033.vdocument.in/reader033/viewer/2022061615/56816269550346895dd2d74c/html5/thumbnails/40.jpg)
Auto Deficiency
All Applications Oil & Gas Specific
Emissions Summary Table Gas and liquid analysis
Emission calculations/ documentation
Sour site < ¼ mile (for §106.352 (l) only)
RO signature matches (certifications only)
Flash calculations
Response to a VOID and not all issues addressed
NOX NAAQS compliance(§106.512 only)
Justification for DRE above default allowables
Begins 6/1/2014: