Download - Company Profile Desainas 2014
PT. DESAINAS
COMPANY PROFILE
COMPANY PROFILE
2014 Complete Service of Hydropower
PT. DESAINAS
COMPANY PROFILE
1. Introduction
PT DESAINASisEPC (Engineering Procurement Construction) company
established on February 3, 1979, by Notary ObingChobirAdikusumah, SH. The
company was originally named PT. DESAIN NASIONAL domiciled in Bandung and on
Oktober19, 1979 changed to PT DESAINAS with the same notary and still reside in
the city of Bandung.
The scope of services PT. DESAINAS is in general construction, consultant
and supervision consultancy services field. Each scope of services ranging from
service survey, planning, design, supervision, Feasibilitiy study, technical assistance
and construction.
Desainas prides itself on meeting modern-dayconstruction challenges and
ensuring the successfulcompletion of complex projects. We promise to deliver the
highest quality of workmanship andclient satisfaction – both imperatives to the
DesainasConstruction philosophy.The Company strives to conduct its business
fairlyand honestly and with consideration to the long-termneeds of all its
stakeholders, i.e. clients, employees,subcontractors, suppliers and service
providers.
2. Our Client
Our impressive client list includes a number of highprofile Indonesian businesses
and governmentalorganisations, such as:
Engineering Project :
PT. Perusahaan Listrik Negara / PLN
PT. Dewata Mega Energy
PT. Wimbi Karunia Energi (Developing PLTM Sawidago 2 1x1000 kW)
PT. Kilo Berkat Mandiri (Developing PLTM Kilo 4x2500 kW)
PT. Sinar Sakti Matra Nusantara
National Renewable Energy Laboratory (NREL) – USA
PT. Medco Multifab
PT. Barill Hydronesia Energy
PT. Aryaguna Inti Ranu
PT. DESAINAS
COMPANY PROFILE
3. Company Data
Corporate Domicile
Head Office:
JL. Terjun Tandom No. 20
PerumahanArcamanik, Telp/Fax : 022 7101524
BANDUNG- WEST JAVA PROVINCE
Branch Office
Taman Pinang Indah Blok H4/11 Sidoarjo
Telp / Fax: 031-8951994
Establishment Certificate
Name of Notary:YusepSugihMunandar, SH
Number :1
Date : 3 February 1979
Last Update Certificate
Name of Notary :Obing Chobir Adikusumah
Number :5
Date :19October 2012
Ratification of the Department of Justice
Number : y.a. 5/133/4, Year-1980
Date :6 March 1980
Taxpayer Identification Number
NPWP : 01.210.977.3-423.000
Organization / Association
Ikatan Nasional Konsultan Indonesia No 0766
Nomor Anggota INKINDO : 857/P/88.JB
Nomor Anggota KADIN : 20101.001522
Bank Account
Bank Mandiri Cabang Ahmad Yani Timur Bandung
No. Rek. 131-00-5550008-8
An/ PT Desainas
Company Sites
Email : [email protected]
Sites : www.Desainas.com
PT. DESAINAS
COMPANY PROFILE
4. Company Personel
COMMISSIONER
Ir. H. Keulman, IAI
Ilman Hamzah Marki, ST.
.
BOARD OF DIRECTORS
Director : Irfan HamzahMarki, ST.
Financial Director : WahyuHariyadi, ST.
Engineering Director : Hany Zaim, ST.
PT. DESAINAS
COMPANY PROFILE
5. Current Project and Experience
a. Engineering Procurement Construction (EPC) Project
In addition to carrying out engineering work, we are also developing our own
several potential hydropower sites which includes survey, design and construction
details. Some sites that we are developing include :
1. PLTM Sawidago 2
Location Capacity Head Turbine Watershed Status
Poso Regency, Central
Sulawesi Province
1 x 900 kW to
upgrade
1x1000 kW
46
meter Francis
75 km2
On
Progress
2. PLTM Kuala Kilo
Location Capacity Head Turbine Watershed Status
Poso Regency, Central
Sulawesi Province 4 x 2500 kW
400
meter Francis
/ Pelton
40 km2
and 60
km2
On
Progress
b. Engineering Project Experience 1. Hydropower Project
No Name Location Owner Capacity Date
1 Detail Engineering Design (DED) PLTM Lokomboro Uprating
Sumba Island, NTT Province
PT. PLN /Pusharlis
2 x 500 kW
June – Oct 2011
2
Detail Engineering Design PLTM Lokomboro 3&4 Cascading
Sumba Island, NTT Province
PT. PLN /Pusharlis
2x200 kW June – Oct
2011
3 Review Design PLTM Sawidago 1
PosoRegency, Central Sulawesi
Province
PT. PLN /Pusharlis
1x380 kW June – Oct
2011
4
Feasibility Study Detail Engineering Design PLTM di Mamberamo tengah, Jaya Wijaya, Tolikara, Yahukimo
Papua Province ESDM Papua
Province 100 kW -200 kW
Nov 2011 – Feb 2012
5 Feasibility Study Detail Engineering Design PLTM Sajingan
Sambas Regency, West Kalimantan
Province
PT. PLN /Pusharlis
1x200 kW July – Sept
2012
PT. DESAINAS
COMPANY PROFILE
6 Feasibility Study and Detail Engineering Design PLTM Semawung
KulonProgo Regency, Yogyakarta
Province
PT. PuritamaEnergi
1x600 kW July – Nov
2012
7
Feasibility Study &Detail Engineering Design PLTM Lokomboro6&7 Cascading
Sumba Island, NTT Province
PT. PLN /Pusharlis
2x200 kW On going
8
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Umbuwangu 2
Sumba Island, NTT Province
PT. PLN /Pusharlis
2x100 kW On going
9
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Beranda 1
NunukanRegency, North Kalimantan
Province
PT. PLN /Pusharlis
2x250 kW 2013 -
finished
10 Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Liki
Solok Selatan Regency, West
Sumatera Province
PT. Dewata Mega Energi
2 x 750 kW
On going
11
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM TelunBerasap
Solok Selatan Regency, West
Sumatera Province
PT. Dewata Mega Energi
2 x4000 kW
2013 - FInished
12
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Sawidago 3
PosoRegency, Central Sulawesi
Province
PT. PLN /Pusharlis
2 x750 kW On going
13
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Kolori
PosoRegency, Central Sulawesi
Province
PT. PLN /Pusharlis
2 x 250 kW
On going
14 Detail Engineering Design (DED) PLTM Merasap
BengkayangRegency, West Kalimantan
Province
PT. PLN /Pusharlis
Uprating 3x750 kW
On going
15
Feasibility Study (FS) and Detail Engineering Design (DED) PLTM Kananggar
Sumba island, Nusa Tenggara Timur
Province
PT. PLN /Pusharlis
2 x 100 kW
On going
16.
Hydro Energy Project Feasibility Study Assistance in Indonesia
Rantausuli village, Merangin regency
Jambi Province
National Renewable
Energy Laboratory -
USA
2 x 1 MW May 2013 Agt
2013
17. Hydro Energy Project Feasibility Study Assistance in Indonesia
Mamasa regency West Sulawesi
Province
National Renewable
Energy Laboratory-USA
2 x 2 MW May 2013 Agt
2013
18. Merangin District MHPP Potential Study
Merangin District, Jambi Province
PT. Medco Multifab
2 x 5 MW July 2013
19. Detail Engineering Design Kilo Minihydro
Poso District, Central Sulawesi Province
PT. Medco Multifab
4x2.5 MW January 2014
PT. DESAINAS
COMPANY PROFILE
2. Port Project
No Name Location Owner Capacity Date
1 Review Design Jetty of PLTU Singkawang
Singkawang District PT. Zug 2 x 25 MW
June – Oct 2012
2 Review Design Jetty of PLTU Rote
Rote Island PT. Zug 2x3 MW June – Oct
2012
c. Turbine Research and Development
To provide a complete service to the customer, we are also able to design
and produce the desired turbine specifications. Almost all turbine components we
planned and produced using domestic components of assured quality.
To support the energy needs of electricity in remote areas not covered by
the state owned utility PT. PLN, we are conducting research and development of
picoturbines with capacity 0.5 kW - 10 kW and minihydroturbine (1-10 MW). Types
of turbines that we have developed are francis turbine, kaplan turbine,
peltonturbine, etc.
Turbine design developed using 3D CAD software and evaluated using CFD
(computational fluid dynamics) to ensure that the customer gets a tailor-made design
for his project parameter.The following is a list of job design, supervise and
manufacture of turbine.
A. Hydro Power Project
No Name Location Owner Capacity Date
1
Francis Turbine Design And Manufacturing Supervision for SansarinoMinihydro Power Plant
LuwuRegency, Central Sulawesi
Province PT. PLN /Pusharlis 800 kW 2007
2
Francis Turbine Design Design And Manufacturing for Sawidago 2 Minihydro Power Plant
PosoRegency, Central Sulawesi
Province
PT. Stabila Strata Eskava
910 kW 2008
3
Bulb Kaplan Turbine Design Design And Manufacturing Supervision for Angkup I & II Minihydro Power
TakengonRegency, Aceh Province
PT. PLN /Pusharlis 2x200 kW 2008
PT. DESAINAS
COMPANY PROFILE
Plant
4
Design Review Turbine Relocation from Maja to Walesi Mini Hydro Power Plant
Wamena regency, Papua Province
PT. PLN /Pusharlis 500 kW 2008
5 Rehabilitation Cikotok Mini Hydro Power Plant
CianjurRegency, West Java Province
PT BangunBumiBersatu
2x500 kW 2010
6
Francis Turbine DesignDesign And Manufacturing Supervision for Walesi 6&7 Mini Hydro Power Plant
Wamena regency, Papua Province
PT. PLN /Pusharlis 2x600 kW 2011
7
Francis Turbine DesignDesign And Manufacturing Supervision for Lokomboro Extension 2&3 Mini Hydro Power Plant
Sumba Island, NTT Province
PT. PLN /Pusharlis 2x500 kW 2011
8
Openflume Propeller Turbine DesignDesign And Manufacturing Supervision for Lokomboro Cascading 4&5 Mini Hydro Power Plant
Sumba Island, NTT Province
PT. PLN /Pusharlis 2x200 kW 2011
9 S-type Propeller Turbine Design for Sinakma 4&5 Mini Hydro Power Plant
Wamena regency, Papua Province
PT. PLN /Pusharlis 2x300 kW 2011
10
Francis Turbine DesignDesign And Manufacturing Supervision for Sawidago I Mini Hydro Power Plant
PosoRegency, Central Sulawesi
Province PT. PLN /Pusharlis
1 x 380 kW
2011
11
Uprating Openflume Francis Turbine for Sinakma 1 Mini Hydro Power Plant
Wamena regency, Papua Province
PT. SinarSaktiMatra Nusantara
From 80 kW to
120 kW 2011
12
S type Turbine Design Design And Manufacturing SupervisionPLTM Lokomboro6&7 Cascading
Sumba Island, NTT Province
PT. PLN /Pusharlis 2x200 kW 2012
13
Francis Turbine DesignDesign And Manufacturing SupervisionPLTM Umbuwangu 2
Sumba Island, NTT Province
PT. PLN /Pusharlis 2x100 kW 2012
PT. DESAINAS
COMPANY PROFILE
14 Francis turbine design PLTM Beranda 1
NunukanRegency, North Kalimantan
Province PT. PLN /Pusharlis 2x250 kW 2012
15
Francis Turbin rehabilitation and uprating PLTM Sawidago2
PosoRegency, Central Sulawesi
Province PT. PLN /Pusharlis
1 x1000 kW
2012
16
S-type Propeller Turbine Design And Manufacturing for PLTM Semawung
Central Java Province
PT Energy Puritama 1x600 kW 2012
17
S-type Propeller Turbine Design And Manufacturing for PLTM Broges I
Papua Province CV. Ryan Jaya
Mandiri 1x100 kW 2013
18
S-type Propeller Turbine Design And Manufacturing for PLTM Broges II
Papua Province CV. Ryan Jaya
Mandiri 1x140 kW 2013
Turbine Design and Product Documentation
Small turbinfrancis Prototype Small Turbine Runner Prototype
PT. DESAINAS
COMPANY PROFILE
S Type Turbine Francis Turbine PLTM Walesi
Detail Engineering Design PLTM Lokomboro6&7 Cascading : Kaplan S-Type turbine with ANSYS Software
Detail Engineering Design PLTM Lokomboro6&7 Cascading : Kaplan S-Type turbine with 3D CAD Software
PT. DESAINAS
COMPANY PROFILE
To provide a wide diversity of turbine service, we also develop and repair
small steam turbine to generate electric power below 250 KW.
Power Plant Arrangement for steam turbine 250 KW condencing 8 bars ABS Inlet
The 250 KW condencing type
PT. DESAINAS
COMPANY PROFILE
Rotor Blade repair in our affiliated workshop
Rotor 1 stage Rotor 2 stage
Rotor 3 stage Rotor 4 stage
PT. DESAINAS
COMPANY PROFILE
Location of our hydropower project experience in Indonesia
PT. DESAINAS
6. Contact Us
For more information, contact us at :
Head Office
PT. Desainas
Jalan Terjun Tandom no 20 Perumahan Arcamanik
Post code : 40293
Telephone/Fax : (+62) 022 7101524
Site : www.Desainas.com
Email : [email protected]
Bandung – Jawa Barat
Indonesia
Contact Person :
Ir. HanyZaim
(+62) 081381592424
(+62) 087825026067
PT. DESAINAS
COMPANY PROFILE
7. Hydrpower Engineering Project Documentation
Review Design PLTM Sawidago 1 (1x400 kW)
Feasibility Study and Uprating PLTM Sajingan, Sambas Regency
West Kalimantan Province
PT. DESAINAS
COMPANY PROFILE
Detail Engineering Design (DED) PLTM Lokomboro 2&3 Uprating, Sumba Island, NTT Province
Detail Engineering Design PLTM Lokomboro 4&5 Cascading (2x200 kW), Sumba Island, NTT Province
Feasibility Study and DED PLTM Kolori (2x250 kW) Feasibility Study and DED PLTM Sawidago 3 (2x750
kW)
PT. DESAINAS
COMPANY PROFILE
Detail Engineering Design (DED) PLTM Beranda 1, Nunukan regency, North Kalimantan Province
Detail Engineering Design Uprating PLTM Merasap, Bengkayang Regency, Weat Kalimantan
Province
Feasibility Study and Detail Engineering Design PLTM Semawung, KulonProgo Regency –
Yogyakarta Province
Feasibility Study and DED PLTMLiki(2x750 kW) South Solok Regency, West Sumatra Province
Feasibility Study and DED PLTM TelunBerasap (2x4000 kW)
PT. DESAINAS
COMPANY PROFILE
8. TURBINE PRODUCT DOCUMENTATION
Openflume propeler turbine PLTM Lokomboro
4&5 Cascading (2x200 KW) Runner PLTM Lokomboro 5&6 Cascading
(2x200 KW)
Turbin PLTM Broges 1 &2 (100 KW) Turbin PLTM Sawidago II (1 x 400 kW)
Turbine PLTM Lokomboro 2&3 (2x500 KW) Turbine PLTM Sawidago I (1x400 KW)
PT. DESAINAS
COMPANY PROFILE
Turbine PLTM Semawung (1x600 KW) Turbine PLTM Walesi (2x800 KW)
Turbin Umbuwangu 2 (200 KW) Turbin PLTM Brogress (100 KW)
Turbine Propeller PLTM Angkup I (300 KW) Turbine Propeller PLTM Semawung (600 KW)
PT. DESAINAS
COMPANY PROFILE
PLTM Lokomboro 6&7 (200 kw)
PLTM Walesi 6&7 (2x500 kw)
PLTM Sansarino (800 KW)
PT. DESAINAS
COMPANY PROFILE
PROJECT CONTRACT