Transcript
Page 1: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

The big picture:

Crowne Plaza Hotel, Amman

September 18-19, 2018

Dr. Pedro HortaHead of Group Solar Process Heat and Industrial Systems, Fraunhofer

ISE

Ms. Elena CuadrosEnergy Consultant, World Bank

Competitiveness and investment perception for

CSH in Middle East & North Africa

Page 2: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

INCREASING PRICE OF FUEL: crude oil and natural gas prices (IEA New Policies Scenario)

30

60

90

120

150

2000 2010 2020 2030 2040

Do

llars

per

bar

rel (

20

16

)

Current Policies 5.14%

New Policies 4.25%

3

6

9

12

15

18

2000 2010 2020 2030 2040

Do

llars

per

Mb

tu(2

01

6)

Japan 1.85%

European Union 2.85%

United States 3.42%

GAS PRICE INCREASE

(2018-2040)

CRUDE OIL PRICE INCREASE

(2018-2040)

Page 3: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

UNSTABLE GENERAL INFLATION IN THE REGION: IMF forecast 2014-2023

-10

-5

0

5

10

15

20

25

%

Inflation rate, average consumer prices (Annual percent change)

Egypt Jordan Lebanon Morocco Tunisia

•Egypt 11.93%

•Jordan 1.95%

•Lebanon 1.92%

•Morocco 1.57%

•Tunisia 4.93%

AVERAGE VALUES

Page 4: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Competitiviness

DNI boiler efficiencySolar average

efficiency

2250

kWh/m2/year

80% 40%

produces per year the same amount of heat as:

104 kg of fuel

oil

99 kg of diesel

92 kg of

LPG/Gas

1 m2 of CSH

$104

$72

$166

$60

$17 $19

Page 5: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Assumptions

CAPEX OPEX Lifetime Residual Valueboiler

efficiencySolar average

efficiency

523 $/m2 2%

CAPEX/year

20 years 0% CAPEX 80% 40%

➢ What is the Internal Return Rate (IRR) for a CSH investment considering

the investment lifetime (20 years)?

➢ What is the Levelized Cost of Heat (LCOH) of a CSH system for different

solar resource values (DNI)?

➢ What is the maximum CSH technology cost (CAPEX) for a CSH

investment to have a simple payback of 5 years?

Page 6: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Jordan

Critical LCOH [US$/MWh.th] 47 44 41 39 36 35 33

General Inflation

Disc. Rate Diesel LPG

% %USD/

MWh.th net

USD/MWh.th

net

1.95 7.44 108.9 45.2

Jordan is producing heat

now with diesel at higher

price (1.3 to 3 times more)

than with CSH.

Page 7: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Jordan: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MW

h.th et

1.95% 108.9 45.2

Jordan can have

10-33% IRR for a

CSH investment

For diesel critical

CAPEX between

$625-$850/m2,

above current

market prices

0,0%

5,0%

10,0%

15,0%

20,0%

25,0%

30,0%

35,0%

2045 2191 2337 2483 2629 2775 2922

IRR - Jordan

250

350

450

550

650

750

850

1607 1753 1899 2045 2191 2337 2483

US

D/m

2

Critical CAPEX 5 years PB- Jordan

TECHNOLOGY

COST

Page 8: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Lebanon

Critical LCOH [US$/MWh.th] 89 81 75 70 65 61 57 54

General Inflation

Disc.Rate Diesel LPG

% %USD/

MWh.th net

USD/MWh.th

net

1.92 11.98 84 92

Lebanon is producing heat

now at much higher price

(12% to 85% higher cost)

than with CSH.

Page 9: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Lebanon: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MWh.th net

1.92% 84 92

12,0%

14,0%

16,0%

18,0%

20,0%

22,0%

24,0%

26,0%

1607 1753 1899 2045 2191 2337 2483 2629

IRR (20 years)

Lebanon can have

a 15-26% IRR for a

CSH investment

Critical CAPEX is

between $401-

$673/m2, above

current market

prices

350

400

450

500

550

600

650

700

1607 1753 1899 2045 2191 2337 2483 2629

$/m

2

Critical CAPEX - Lebanon

TECHNOLOGY

COST

Page 10: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

West Bank and Gaza

Critical LCOH [US$/MWh.th]

General Inflation

Disc.Rate Diesel LPG

% %USD/MWh.

th netUSD/MWh.

th net

1.89 12.76 170 90

80 74 69 65 61

West Bank and Gaza is

producing heat now with

diesel at more than double

price than with CSH.

Page 11: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Energy and Extractives

West Bank and Gaza: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MW

h.th et

1.89% 170 90

West Bank and

Gaza can have a

16-49% IRR for a

CSH investment

Critical CAPEX is

between $500-

$650/m2, above

current market

prices

10,0%

15,0%

20,0%

25,0%

30,0%

35,0%

40,0%

45,0%

1899 2045 2191 2337 2483

IRR - West Bank and Gaza

350

450

550

650

750

850

950

1050

1150

1899 2045 2191 2337 2483

US

D/m

2

Critical CAPEX 5 years PB- West Bank and Gaza

TECHNOLOGY

PRICE

Page 12: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Tunisia

Critical LCOH [US$/MWh.th] 47 44 41 39 36 35 3370 64 59 55 51 48

General Inflation

Disc. Rate Diesel LPG

% %USD/MWh.

th netUSD/MWh.

th net

4.93 9.39 75 18.3

CSH in Tunisia could be

competitive when gas is

not available and only in

areas with excellent

solar resource

Page 13: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Tunisia: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MW

h.th et

4.93% 75 18.3

Tunisia can have a

2-19% IRR for a

CSH investment

Critical CAPEX is

between $125-

500/m2, above

current market

prices

0,0%

2,0%

4,0%

6,0%

8,0%

10,0%

12,0%

14,0%

16,0%

18,0%

20,0%

1534 1680 1826 1972 2118 2264

IRR - Tunisia

100

200

300

400

500

600

1607 1753 1899 2045 2191 2337

$/m

2

Critical CAPEX - Tunisia TECHNOLOGY

PRICE

Page 14: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Morocco

41 38 35 33 31 29 27Critical LCOH [US$/MWh.th]

General Inflation

Disc.Rate Diesel LPG

% %USD/MWh.

th netUSD/MWh.

th net

1.53 4.51 132.7 62.5

CSH in Morocco is

competitive with

diesel

Page 15: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Morocco: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MW

h.th et

1.53% 132.7 62.5

Morocco can have

a 11-35% IRR for a

CSH investment

Critical CAPEX is

between $325-

925/m2

0,0%

5,0%

10,0%

15,0%

20,0%

25,0%

30,0%

35,0%

40,0%

1680 1826 1972 2118 2264 2410 2556

IRR - Morocco

250

350

450

550

650

750

850

950

1607 1753 1899 2045 2191 2337 2483

$/m

2

Critical CAPEX - Morocco

TECHNOLOGY

PRICE

Page 16: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Egypt

110 102 95 89 84 79 75Critical LCOH [US$/MWh.th]

General Inflation

Disc.Rate Diesel LPG

% %USD/MWh.

th netUSD/MWh.

th net

11.93 19.31 36 20

Egypt has access to

highly subsidied fossil

fuels making CSH not

competitive

Page 17: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

Egypt: IRR and Critical CAPEX for a 5 year Payback

General Inflation

DieselLPG

USD/MWh.th

netUSD/MW

h.th et

11.93% 36 20

Egypt can have a

7-13.5% IRR for a

CSH investment

Critical CAPEX is

between $125-

500/m2, above

current market

prices

0,0%

2,0%

4,0%

6,0%

8,0%

10,0%

12,0%

14,0%

16,0%

1899 2045 2191 2337 2483 2629 2775

IRR - Egypt

100

200

300

400

500

600

1607 1753 1899 2045 2191 2337 2483

$/m

2

Critical CAPEX - Egypt TECHNOLOGY

PRICE

Page 18: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

MENA

109 87 72 62 54 48 46Critical LCOH

[US$/MWh.th]

0,0%

10,0%

20,0%

30,0%

1168 1461 1753 2045 2337 2629 2775

IRR - MENA

Page 19: Competitiveness and investment perception for CSH in ... · What is the Internal Return Rate (IRR) for a CSH investment considering the investment lifetime (20 years)? What is the

REFERENCES

Palestine Jordan Lebanon Morocco Tunisia Egypt REF. MENA

CAPEX US$/m2 523 523 523 523 523 523 average http://ship-plants.info/ 523

Diesel US$/kWh_final*

0.17 0.1089 0.084 0.1327 0.075 0.036

end-users for Palestine,

https://www.globalpetrolprices.com/

Jordan/diesel_prices/ by EY for other

countries

0.1011

NG (LPG for Lebanon and Palestine) US$/kWh0.09 0.0452 0.092 0.0625 0.0183 0.02

end-users for Palestine, several by EY

for other countries0.054667

General inflation*** %

2.61% 2.33% 2.88% 1.90% 5.08% 10.75% average 2018-2023, IMF (by Elena)

(average Jordan + Israel for Palestine)

4.26%

OPEX % CAPEX/year 2% 2% 2% 2% 2% 2% Fraunhofer ISE 2%

Residual value % CAPEX 0% 0% 0% 0% 0% 0% Fraunhofer ISE 0%

Lifetime years 20 20 20 20 20 20 Fraunhofer ISE 20

Discount rate** % 12.76% 7.44% 11.98% 4.51% 9.39% 19.31% EY 10.90%

* 80% conversion efficiency (boiler)

** 25% Equity, 75% Debt

*** value for Palestine resultas from average between Jordan and Lebanon

WBGaza