CONNECTING PEOPLE
![Page 2: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/2.jpg)
The Miami Intermodal Center
October 24, 2008
It’s on its way!
![Page 3: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/3.jpg)
In the Beginning… In the late 1980s
• Miami-Dade County was experiencing significant growth in outlying western areas
• County Commission sensed urgency in providing transportation linkage
• Called on FDOT to explore – East-West Transportation Corridor expansion– Central facility to link all modes of ground transportation
and decongest airport access roads
![Page 4: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/4.jpg)
MIC History• Congress adopts Intermodal Surface Transportation Efficiency Act
(ISTEA) in 1991 laying groundwork for MIC’s creative financing
• FDOT commissions Parsons Brinckerhoff to conduct East-West Corridor Study– FHWA grants FDOT a ROD in September 1998– FDOT turns project over to Miami-Dade Transit & Miami Dade
Expressway Authority for implementation
• FDOT commissions ICF Kaiser to conduct MIC Study – FHWA grants FDOT a ROD in May 1998– Kaiser assets acquired by Earth Tech 2000– Earth Tech acquired by AECOM 2008
![Page 5: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/5.jpg)
What is the Miami Intermodal Center Program?
• Transportation hub for Miami-Dade County & South Florida region
• First program of its kind undertaken by FDOT • Major partners/stakeholders include
– USDOT / FHWA– Miami-Dade County & its transportation
agencies– MDX – SFRTA
![Page 6: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/6.jpg)
Why Do We Need the Program?
• Create connectivity in Miami-Dade County where none existed
• Decongest roads leading to the county’s number one economic generator
![Page 7: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/7.jpg)
Connectivity• Serves as a Central Station similar to
those found in various urban areas in U.S.• Provides safe & seamless transportation
connections• Includes numerous roadway
enhancements
![Page 8: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/8.jpg)
Decongestion• Absorbs rental car & shuttle
bus traffic at airport• Alleviates traffic tensions on
roadways to & from airport• Roadway improvements have
enhanced traffic flow on nearby roads & highways
• MIC has given Le Jeune Road back to community as a major north-south artery
![Page 9: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/9.jpg)
The MIC Program • $1.7 billion program
• $338 million Right of Way Program – completed 2003
• Major components – Roadways Improvements
• MIC Terminal Access Roadways – completed
• Le Jeune Road and MIC-MIA Interchange –completed 2008
– Rental Car Center - 2010– Miami Central Station - 2012– MIA Mover – 2012– Joint Development
![Page 10: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/10.jpg)
1 - Rental Car Center
2 - APM Station
3 - Metrorail/Metrobus
4 - Ground Rail (Tri-Rail/Amtrak)
6 - Pedestrian Concourse
5 - Headhouse (Tri-Rail/Amtrak)
8 - Public Parking
MIC: FACILITY COMPONENTS
MIA
12
3
4
5
76
8
9 - Joint Development
8
9
7 - Ground Transportation Center (Greyhound Terminal, Concession)
![Page 11: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/11.jpg)
Rental Car CenterUnder Construction / Spring 2010 Opening COST: $343M
• Relieve airport curbside congestion
• When MIA Mover is operational, congestion will be decreased by 30 percent
• Secure rental car “shopping mall”
![Page 12: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/12.jpg)
Rental Car Center• Distinctive design
– 4 levels, each expandable to 20 acres in size
– Signature structures– State-of-the-art
facilities
• First multilevel fueling system in U.S. – Indoor operation– Above grade fueling
pumps
![Page 13: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/13.jpg)
Rental Car CenterAt full build out • 3.4 million square feet • Space available for 16
rental car companies • 6,500 car capacity• Ready/return car areas• Fleet storage/staging
areas • Quick Turnaround Area
Stacking (Queuing) – 120 fuel positions – 42 wash bays
![Page 14: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/14.jpg)
Rental Car Center
View from Southwest
![Page 15: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/15.jpg)
Rental Car Center Construction Site
![Page 16: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/16.jpg)
Rental Car Center Construction Site
Ramp to Northbound Le Jeune Road
Helix
![Page 17: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/17.jpg)
MIA Mover 2012 Opening COST: $303M
• County’s contribution to the program• Automated People Mover connecting airport terminals & MIC• FDOT participation— guideway foundations & construction of
MIA Mover Station at MIC• Under construction
![Page 18: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/18.jpg)
Miami Central Station Design well underway / Opening 2012 COST: $356M
– Rail hub (Amtrak,
Tri-Rail, Metrorail, inter-city rail provisions)
– Bus depot (private bus companies such as Greyhound, MDT bus service & other courtesy bus services)
– Taxis, private automobiles, bicycles & pedestrians
Regional Transportation Hub
![Page 19: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/19.jpg)
Miami Central Station• Decongests
roadways• Provides
transportation choices
• Sense of arrival at a world-class city
![Page 20: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/20.jpg)
• Ground lease development (public & private)
• Leverage its location as a transportation hub
• Possibilities include– Hotel/Conference center– Office space– Retail & Entertainment– Restaurants– Parking
MIC Joint Development component currently being explored
Joint Development
![Page 21: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/21.jpg)
Roadway ImprovementsCompleted May 2008 COST: $184M
• Le Jeune Road Reconstruction• MIC Terminal Access Roadways
Before
After
![Page 22: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/22.jpg)
Employment Opportunities MIC Program is a major contributor to the local economy
• An estimated 76,000 construction jobs & 22,000 permanent jobs created throughout the life of the MIC Program’s planning, construction & operations
• Millions of dollars worth of material procurement & services during its construction
• Completed MIC facilities will provide future employment opportunities to Miami-Dade County residents
![Page 23: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/23.jpg)
MIC Project Current Status StartAnticipated Completion
Date
Rental Car Center Under Construction July 2007 April 2010 (opening date)
Miami Central Station – West / East Concourse
Construction Documents 80% Completed January 2009 / July 2010
December 2011 / August 2012
MIA Mover (APM)MDAD NTP Construction September 2009 September 2011
MDAD Procurement Process Completed October 2004 September 2008
MIC Station Under Construction February 2008 May 2010
MIC Terminal Access Roadways
Transit Access Road, MIC-MIA Interchange
& Bridges Completed August 2004 May 2008
Remaining Portions (Stage 2) August 2007 December 2009
Le Jeune Road Improvements Completed February 2005 February 2008
MIC-Earlington HeightsMetrorail Connection
Reviewing Now – Bid Proposal March 2009 December 2011
![Page 24: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/24.jpg)
Total MIC Program Budget• Right of Way & Environmental $338 M • Miami Central Station $356 M• Road Improvements $184 M• MIA Mover $303 M• Rental Car Center $343 M • Program contingency & other costs $139 M
Note: Per
February 2008 program reconciliation Total Cost: $1.7 Billion
![Page 25: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/25.jpg)
FDOT MIC Program Expenditures
AS OF SEPTEMBER 30, 2008
• Right of Way Acquisition, Utilities & Remediation $334.6 M • Rental Car Center $231.9 M • MIA Mover $ 9.9 M• Area Roadway Improvements $168.1 M • Miami Central Station/Transportation Hub $ 33.9 M
• Program Management, PD&E $ 66.6 M
Total Expenditures by FDOT: $845 Million
![Page 26: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/26.jpg)
Innovative FinancingMajor Funding Sources• Federal TIFIA Loans
– 1st TIFIA Loan - $269M – has been prepaid & replaced with an interest free FDOT STTF Loan
– 2nd TIFIA Loan - $270M – approved by USDOT• County/MDAD contributions• Transportation funding prioritized by MPO • Miami-Dade Expressway Authority contributions • Private sector contributions
– Customer Facility Charges– Leases– Contingent Rent
• FDOT State Infrastructure Bank (SIB) Loan
![Page 27: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/27.jpg)
The MIC is on its way!www.micdot.com
![Page 28: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/28.jpg)
CONNECTING PEOPLE
![Page 29: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/29.jpg)
MIC Public Affairs Program
• Community relations• Governmental relations• Media relations
![Page 30: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/30.jpg)
MIC Public Affairs Program
• Began with extensive public involvement• Evolved into full public affairs• Includes Comprehensive Community
Awareness Program and One Stop Shop
![Page 31: CONNECTING PEOPLE](https://reader035.vdocument.in/reader035/viewer/2022081604/56815e80550346895dcd0d03/html5/thumbnails/31.jpg)
MIC-Earlington Heights Presentation