Construction Coordination
BIM Curriculum 06
![Page 2: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/2.jpg)
Topics
Problems of the Construction Industry Objectives The Virtual Construction Model Benefits
![Page 3: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/3.jpg)
Problem Definition Design
Sub Contractor Cost
Construction
Facility Management
• No direct cost feedback on design decisions• Coordination of trades
• Missing / Incorrect Design Information• Inability to reuse data for shop drawings• Field rework required for prefabricated components• Padding to compensate for risks• Poor subcontractor work flow – “Starts and Stops”• Inadequate quantity information for planning
• Lack of owner trust – difficulties in communicating cost and schedule issues• Production control is based on subjective information • Frequent starts and stops• Estimating is time-consuming and occasionally inaccurate
• Insufficient as-built project documentation • Renovation, addition and demolition planning is time-consuming
![Page 4: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/4.jpg)
Money Manpower
MaterialsMachinery
Objectives
Winning the bid Fast design feedback
loop Fast & accurate
estimates Value engineering Constructability analysis
Managing the 4 Ms Money Manpower Machinery Materials
![Page 5: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/5.jpg)
Model Estimating ProcurementSequencing Site Management
Constructability
Analysis Drives Estimating Provides Locations Zone Planning Design to Build /Build to Design
Schedule Analysis Line of Balance Integrated Monte Carlo 4D Simulation Drives Procurement
Data Mining for Supplier Negotiations Tracking of High Risk, Long Lead Items Integrated with the Project Schedule Drives Site Management Process
Short Lead Procurement Site Planning for Materials & Equipment Locations
Fast & Accurate Easy Updates - Linked Drives Sequencing
Construction Planning
![Page 6: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/6.jpg)
Level of
Deta
il
Time
Review SD QT Price
Schematic Design Phase
Review DD QT Price
Detailed Design Phase
Review CD QT Price
Construction Documents Phase
rework
rework
Traditional Design Process
![Page 7: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/7.jpg)
Level of
Deta
il
Time
Schematic Design Phase
SD
QT Price
Detailed Design Phase
DD
QT Price
Construction Documents Phase
CD
QT Price
support for iterative design process
New Design Process
![Page 8: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/8.jpg)
Time (4D) Cost (5D)
Linked Schedules
Linked Estimating
Recipes
The Virtual Construction Model (5D)
BIM Model (3D)
![Page 9: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/9.jpg)
Project Control
Fabrication 2D Drawings
Constructability Analysis and Coordination
Procurement Schedule
Accounting
Cost Estimate 5D Model
5D Work Flow
![Page 10: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/10.jpg)
Level of
Deta
il &
Com
ple
xit
y
Design Intent Model
Construction Model
Construction Modeling
![Page 11: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/11.jpg)
Construction Modeling
![Page 12: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/12.jpg)
Completed Column
Recipe
Recipes
![Page 13: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/13.jpg)
Concrete
Reinforcing Bars
Formwork
Cladding / Surface finish
RecipeMethods
Stages Required to Finish Column
Methods
![Page 14: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/14.jpg)
RecipeMethods
Resources
Resources
![Page 15: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/15.jpg)
Recipe Methods Resources
Zones/Floors +
=
/ /
The 5D Model
![Page 16: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/16.jpg)
Benefits: Clash Detection
Conventional methods of coordination are extremely time consuming and error-prone.
Using internal or external clash detection software helps to identify the construction errors in the BIM model
Construction risks and costs can be reduced significantly
![Page 17: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/17.jpg)
Benefits: Cost Variances
Early Design phases: Which materials? Price of materials?
Solution: Calculate cost ranges
instead of fixed prices
Office
18 sq. m.
Office
22 sq. m.
CorridorOffice
22 sq. m.
Office
20 sq. m.
CorridorOffice
11 sq. m.
Exterior Wall type?
Cost of a double swing door?
![Page 18: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/18.jpg)
Variance Estimating©
Expected price range:$20 – $25
![Page 19: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/19.jpg)
Benefits: Design to Build
Design follows construction methodology Acceptable Tolerance Coordination of Trades Quality Check
![Page 20: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/20.jpg)
Benefits: Build to Design
Measure points Check Onsite Guarantee Fit
X, Y, Z
![Page 21: Construction Coordination BIM Curriculum 06. Topics Problems of the Construction Industry Objectives The Virtual Construction Model Benefits](https://reader035.vdocument.in/reader035/viewer/2022062322/5697bfdf1a28abf838cb2bf5/html5/thumbnails/21.jpg)
Virtual Construction™ Products
Construction Modelers / Project
Engineers
Estimators
Schedulers / PM’s / Supers