Page 1: CONSTRUCTION - Edinburgh Printmakers · Secondary steel structure to support glazing to window subcontractor's detailed design Acid etched precast concrete canopy, H42/110 Sim 1 A(31)

2

L(21) 50

3

L(21) 50

4

L(21) 50

750

1600

R_LG.02Reception / Shop

R_LG.01Lobby

Sim1

A(31) 12

Sim1

A(31) 13

Sim1

A(31) 14

Sim1

A(31) 17

First Floor72870

Prop entrance level66600

Member's Gallery69518

2393

477

2477

3207 1160

5395

Clear silicone jointsbetween DGUs

Clear silicone jointsbetween DGUs

100mm rigid insulation fixed to u/s floorstructure over entrance, F30/156

Top coat of self-coloured render on reinforcingmesh on base coat render on exterior grade

cementitious carrier board fixed using exterior gradestainless steel screws at centres recommended bymanufacturer to exterior grade steel soffit hanging

system fixed to u/s of floor slab, M21/160 -Contractor designed

Ceiling type 01 to lobby, K10/200- Air curtain over doors to beconcealed in ceiling void

Forbo Nuway Tuftiguard Classicentrance matting with bambooscrapper bars recessed intoscreed, M40/200

New area of stone pavingwithin recessed entrance,Q25/200. 50mm thickCaithness slabs with Riven,slip resistant finish, onsubbase to str. eng.specification

Brick outerleaf, F10/110

50mm cavity

100mm KingspanKooltherm K12insulation, F30/155

Breather membrane,F30/190 on 22mmmoisture resistantplywood

Vapour control membrane,P10/310 on 22mm moisture

resistant plywood to innerface of SFS

SFS framing systembetween new steel

structure

Raico toggle detailalong vertical siliconejoints (clear silicone)to RHS behind

Both lobby doors, H13/115:Double glazed, PPC aluminiumframe double doors with low energyactuator, GEZE Slimdrive EMD F-ISor similar approvded. Doors todrive open upon pressing button,otherwise manually opened,automatic door closer in allsituations. Wheelchair accessiblelow threshold, brushed stainlesssteel

R_LG.01Lobby

Sim1

A(31) 15

Sim1

A(31) 11

1

A(35) 04

Sim1

A(22) 06

R_LG.03Gallery

First Floor72870

Prop entrance level66600

Member's Gallery69518

W(UG)_01

W(FF)_01W(FF)_02W(FF)_03W(FF)_04W(FF)_05

W(UG)_05

Red hatch indicates extent of existing brickwall to be removed. Cut down brickwork toform new openings. Rebuild / make goodbrickwork reveals / piers / heads asnecessary using brick salvaged from site,F10/340

Remove existing windows W(UG)_02 - 04

Provide new PPC steel linings to reveals &heads of each of the three openings,L30/300, refer to A(21) series drawings fordetail. Lining to wrap around 3 sides ofpier and fully conceal strengtheningsteelwork to rear face

Client supply gates to each of the 3no. openings -Contractor to allow for full installation includingcoordination with Artist making the gates andprovision of foundations for gate posts asnecessary

Provide new galvanised steelwork oninner face of existing brick (roughlyshown dotted red) to strengthen brickpiers to Str. Eng. detail and specification.

W(LG)_14

New PPC aluminium framed,double glazed, fixed window

W(LG)_14 to replace previousboarded up door Ex_D.01,

L10/330. New window to be sizedto fit existing opening

3no. acid etched precast concreteL-shaped canopies, H42/110, oneover each opening. Secondarygalvanised steel structure to supportcanopies to Structural Engineer'sdetailed design

Lightbox signage adjacent to front door,N15/250, refer to drawing L(99) 01. Pushbutton for door actuators to be located onframe of lightbox. Lightbox to befreestanding, Contractor to providenecessary steel frame / column structure.Baseplates to be concealed below paving

Illuminated poster boxes, N15/300, referto L(99) 01 for details

Balustrade, to Architect'slater detailed design, fixed to

edge of floor structure, toStr. Eng. spec

99

Double glazed structural glazing withconcealed PPC aluminium glazing

angles at head and base tosubcontractor's detailed design,

H13/115

Ex_D.01

Secondary steel structure to supportglazing to window subcontractor's

detailed design

Acid etched precast concretecanopy, H42/110

Sim1

A(31) 09

Sim1

A(31) 10

Sim1

A(31) 11

Sim1

A(21) 13

5400

Sim1

A(21) 13

Sim1

A(31) 09

Sim1

A(31) 11

Opaque glazing to conceal structure. ProvideLED strip lighting behind glazing

Steel structure to support window, to windowsubcontractor's specification, at vertical joint. Raico

toggle detail along vertical silicone joints (clearsilicone), H13/115

Double glazed, structural glazing withclear silicone joints, H13/115

Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supported athead & base by concealed PPC glazing angles -final detail to window subcontractor's detaileddesign

Concealed PPC glazing angles alongbased of glazing, recessed to finishflush with FFL

Provide new, fixed, PPCaluminium framed window to fitexisting door opening Ex_D.01,

L10/330

Cut down 3no. existing window openings along line ofexisting brick piers to FFL within entrance. Rebuild /make good brickwork reveals / piers / heads asnecessary using brick salvaged from site, F10/340.Provide new PPC steel linings to reveals, refer toA(21) series drawings for detail

Provide new steelwork on inner face ofbrick to strengthen brick piers to Str. Eng.detail and specification. Strengtheningsteelwork to be fully concealed by PPCsteel reveal linings

Client supply, artist designed gates to each of the three newopenings - Contractor to allow for full installation includingcoordination with Artist making the gates and provision offoundations for gate posts as necessary

New area of stone paving within recessedentrance, Q25/200. 50mm thick Caithnessslabs with Riven, slip resistant finish, onsubbase to str. eng. specification

Make good existing concrete footpath if damagedduring works

PPC aluminium flashing coveringstructure over entrance door

Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115

W(UG)_01

W(UG)_05

Steel structure to support window, to windowsubcontractor's specification, at vertical joint.

Raico toggle detail along vertical silicone joints(clear silicone), H13/115

Existing metal columns to be concealed within wall

Mezzanine floor structure set back from glazing, providesteel balustrade to edge to Architect's later detailed design

W(LG)_14

Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving

Illuminated poster boxes, N15/300, refer to L(99) 01for details

W(UG)_01

W(UG)_05

Existing brick wall to betreated for rot, spec C52

Wall type 6A, K10/140 - insulated dryliningto all external walls

Wall type 4C, K10/122 - Line insulateddrylining with 1 layer 12.5mm plasterboardon 1 layer 18mm plywood on wall liningstuds so that artwork can be hung in anylocation on the wall

VOID

Mezzanine floor structure set back fromglazing, provide steel balustrade to edge toArchitect's later detailed design

Glass to glass corner joint at first floor level, novisible structure of framing. Glazing supportedat head & base by concealed PPC glazingangles - final detail to window subcontractor'sdetailed design

Fixed structural glazing with concealed PPCglazing angles at head & base, H13/115

Provide new PPC steel linings toreveals, L30/300, refer to A(21)series drawings for detail. Lining towrap around 3 sides of pier and fullyconceal strengthening steelwork torear face

Provide new steelwork on inner face of brick tostrengthen brick piers to Str. Eng. detail and

specification. Strengthening steelwork to be fullyconcealed by PPC steel reveal linings

1

A(31) 10 1

A(31) 15

Sim

Sim1

A(31) 18Sim1

A(31) 12 Sim1

A(31) 13

Do not scale from drawing. Use figured dimensions only.All dimensions to be checked on site by the contractor and anydiscrepancies to be notified to the architect prior to works being carriedout.

Revisions:

Title:

Project:

Client:

Scale:

Date:

Drawing No:

Page Park Architects

20 James Morrison Street, Glasgow G1 5PE, UK

T 0141 553 5440 F 0141553 5441

[email protected] www.pagepark.co.uk

@

C1

Front entrance study

07/25/16

Edinburgh Printmakers Creative Hub

Edinburgh Printmakers

1:50

L(21) 50

CONSTRUCTION

A1

Steel to support window,to window

subcontractor'sspecification, concealed

within wall

Steel structure to supportwindow, to window

subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone

joints (clear silicone), H13/115RHS to support corner of window,

to window subcontractor's detaileddesign. This RHS spans from the

entrance level to the u/s of thetimber mezzanine structure only.

Glass to glass corner detail at firstfloor with no visible structure

Provide secondary steelstructure to support windowhead, to windowsubcontractor's detaileddesign

Wall type 9A

PPC aluminium flashing coveringstructure over entrance door

Concealed glazingangles at head &

base of DGU

Double glazed structural glazingwith concealed PPC aluminium

glazing angles at head and base tosubcontractor's detailed design,

H13/115

Opaqueglazing

Opaqueglazing

1500mm X 1500mmclear turning spacefor wheelchairs

Structural, double heightglazing with concealed PPC

glazing angles at head &base, H13/115

New area of stone paving withinrecessed entrance, Q25/200.

50mm thick Caithness slabs withRiven, slip resistant finish, on

subbase to str. eng. specification

W(LG) 14 - Provide new, fixed, PPCaluminium framed window to fit existing

door opening, L10/330. Removeexisting steps within door opening.

Provide new precast concrete windowcill, H42/110

Both lobby doors, H13/115:Double glazed, PPC aluminium framedouble doors with low energy actuator,GEZE Slimdrive EMD F-IS or similarapprovded. Doors to drive open uponpressing button, otherwise manuallyopened, automatic door closer in allsituations. Wheelchair accessible lowthreshold, brushed stainless steel.Min. clear width 1400mm

Glazed side panel

Ex_D.02

Ex_

D.0

1

Air curtain concealed inceiling void over doors toM&E engineer'sspecification & detail

Client supply gates to each of the 3no.openings - Contractor to allow for full

installation including coordinationwith Artist making the gates andprovision of foundations for gate

posts as necessary

Provide new steelwork on inner faceof brick to strengthen brick piers to

Str. Eng. detail and specification.Strengthening steelwork to be fully

concealed by PPC steel reveallinings

Provide new PPC steel linings toreveals, L30/300, refer to A(21)

series drawings for detail. Liningto wrap around 3 sides of pier

and fully conceal strengtheningsteelwork to rear face

Steel structure to supportwindow, to window

subcontractor'sspecification, concealed

within wall

Steel structure to supportwindow, to window

subcontractor's specification,at vertical joint. Raico toggledetail along vertical silicone

joints (clear silicone), H13/115

Structural, double heightglazing with concealedPPC glazing angles athead & base, H13/115

Lower Ground Floor - Plan of proposed recessed entrance area Upper Ground Floor - Plan of proposed recessed entrance area

Fixed double glazedwindow withconcealed PPCaluminium glazingangles at head &base, H13/115

PPC aluminium flashing coveringstructure over entrance door

Provide new PPC steel liningsto new openings, L30/300, referto A(21) series drawings fordetail

Client supply gates to each ofthe 3no. openings - Contractor toallow for full installation includingcoordination with Artist makingthe gates and provision offoundations for gate posts asnecessary

New area of stone paving withinrecessed entrance, Q25/200.Caithness slabs with riven, slipresistant finish, on subbase to str.eng. specification

White brick outer leaf tonew reveal within entrance

Double glazed structuralglazing with concealed

PPC aluminium glazingangles at head and base

to subcontractor's detaileddesign, H13/115. Clear

silicone joints

Top coat of self-coloured renderon reinforcing mesh on base coat

render on exterior gradecementitious carrier board fixed

using exterior grade stainlesssteel screws at centres

recommended by manufacturer toexterior grade steel soffit hanging

system fixed to u/s of floor slab,M21/160 - Contractor designed

Provide new PPC steel liningsto new openings, L30/300,

refer to A(21) series drawingsfor detail

1 - Front elevation of new entrance

2 - Section thru new entrance 3 - Section thru new entrance 4 - Section thru new entrance

5 - 3D of new entrance with FF removed

Lightbox signage adjacent to front door, N15/250, refer todrawing L(99) 01. Push button for door actuators to belocated on frame of lightbox. Lightbox to be freestanding,Contractor to provide necessary steel frame / columnstructure. Baseplates to be concealed below paving

C1 CONSTRUCTION ISSUE 01.04.2017

Illuminated poster boxes, N15/300, refer to L(99) 01 fordetails